Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Town Planning Report - Expansion to Noosa Landfill

of 36

Page text shows just the words. Original shows the document exactly as it was published.

                                                                    Court Appeals & Dispute Resolution
                                                                    Applications & Assessment
                                                                    Due Diligence & Compliance
                                                                    Project Management
                                                                    General Development Advice




              Town Planning Report

     Other Change Application
            for existing
          Noosa Landfill
(Waste Disposal & Recycling Facility)
        (Utility Installation)
                  at
 561 Eumundi Noosa Road, Doonan




                  Adamson Town Planning Pty Ltd
                         (ACN: 163 798 374 | ABN: 73 163 798 374)
  P (07) 5430 6671 F (07) 5430 6677 M 0437 754 420 Mail: PO Box 894, Cooroy QLD 4563
             ‘Noosa Boardroom’, 28 Eenie Creek Road, Nooosaville QLD 4566
  Email| [email protected] Web| www.adamsontownplanning.com.au
Log in to download the original file

Town Planning Report - Expansion to Noosa Landfill.pdf · 3.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 35 pages

Page 2

“Specialist services and practical solutions”




       Document Control
        Project:                   Change application - “other change” to current development
                                   approval for a material or change of use for the existing Noosa
                                   Landfill - Waste and Recycling Facility
        Applicant:                 Noosa Council
        Project Number:            22019
        Status of Report:          Final
        Date:                      November 2023
        Author:
                                   Shane Adamson
                                   Shane Adamson (BEngTech, GDURP, MPIA, MQELA)
                                   Town Planning Specialist
                                   Director - Adamson Town Planning Pty Ltd


       The information contained in this document is confidential and intended solely for the use of the client
       for the purpose for which it has been prepared and no representation is made or is to be implied as
       being made to any third party. Use or copying of this document in whole or in part without the written
       permission of Adamson Town Planning Pty Ltd constitutes an infringement of copyright. The intellectual
       property contained in this document remains the property of Adamson Town Planning Pty Ltd.


       In preparing this report it is assumed that all information and documents provided by the client are
       correct and accurate. Where information has been obtained from another source, it is assumed that the
       information is accurate where relied upon.


       This report is presented without the assumption of a duty of care to any other person (other than the
       Client). The report may not be relied on by a Third Party. Adamson Town Planning Pty Ltd will not be
       liable to a Third Party for any loss, damage, liability, or claim arising out of or incidental to a Third Party
       and publishing, using, or relying on the facts, content, opinions, or subject matter contained in this
       report.




       22019 – Noosa Council Expansion of Landfill, November 2023                                     Page 2

Page 3

“Specialist services and practical solutions”




        TABLE OF CONTENTS


       DEVELOPMENT SUMMARY................................................................................................................... 5

       EXECUTIVE SUMMARY .......................................................................................................................... 6

       INTRODUCTION ..................................................................................................................................... 9

       APPLICATION BACKGROUND .............................................................................................................. 9

       SUBJECT SITE ....................................................................................................................................... 10

       APPROVAL BACKGROUND ................................................................................................................. 11

       DEVELOPMENT PROPOSAL................................................................................................................. 13

       NEED ..................................................................................................................................................... 14

       PLANNING ACT 2016 .......................................................................................................................... 16

       STATE POLICY ASSESSMENT .............................................................................................................. 17

          SOUTH EAST QUEENSLAND REGIONAL PLAN............................................................................................... 17
          STATE PLANNING POLICY 2017................................................................................................................ 17
          PLANNING REGULATION 2017 ................................................................................................................. 19
       NOOSA PLAN 2020 .............................................................................................................................. 20

          ZONING AND TABLES OF ASSESSMENT ....................................................................................................... 20
          OVERLAY CODES.................................................................................................................................... 23
              Biodiversity Overlay Code ............................................................................................................. 24
              Other Overlay Codes .................................................................................................................... 30
          COMMUNITY FACILITIES ZONE CODE ......................................................................................................... 30
          INFRASTRUCTURE ACTIVITIES CODE ........................................................................................................... 32
          WORKS CODES ...................................................................................................................................... 34
       CONDITIONS OF APPROVAL .............................................................................................................. 34

       CONCLUSION ....................................................................................................................................... 35


        Attachments:
        Attachment 1A                      State Assessment Referral Agency – Prelodgement Minutes
        Attachment 1B                      Relevant purpose determination for vegetation clearing
        Attachment 2A                      Current Decision Notice and Approved Plan
        Attachment 2B                      Referral Agency Response – Permit A
        Attachment 2C                      Updated “generally in accordance with” request
        Attachment 3                       Regional Ecosystem Assessment – Lake MacDonald Catchment
        Attachment 4                       Master Plan



       22019 – Noosa Council Expansion of Landfill, November 2023                                                                            Page 3

Page 4

“Specialist services and practical solutions”



        Attachment 5A            Flood Hazard Assessment
        Attachment 5B            Technical Memorandum – Flooding
        Attachment 6             Stormwater Management Plan
        Attachment 7A            Impact Assessment Report MNES & MSES
        Attachment 7B            Flora and Fauna Assessment
        Attachment 7C            Flora and Fauna Assessment and Assessment of Impacts
        Attachment 7D            Impact Assessment and Management Plan
        Attachment 8             Plan of Additional Environmental Offset Area
        Appendices:
        Appendix A               •    SDAP State Code 1 – Development in a state-controlled road
                                 •    SDAP State Code 16 – Native Vegetation Clearing




       22019 – Noosa Council Expansion of Landfill, November 2023                    Page 4

Page 5

“Specialist services and practical solutions”



       Development Summary

        Development Proposal                            Expansion of the Noosa Landfill – Waste and
                                                        Recycling Facility (Utility Installation),
                                                        including associated clearing.
        Subject Land:                                   561 Eumundi Noosa Road, Doonan
        Land Description:                               Lot 77 on SP298776
        Land Area:                                      321.9 ha
        Subject Land:                                   about 1.0ha
        Regional Plan:                                  South East Queensland Regional Plan 2017 –
                                                        Regional Landscape and Rural Production
                                                        Area
        Planning Scheme:                                Noosa Plan 2020 (the planning scheme)
        Zoning:                                         • Community Facilities (Utility Installation);
                                                           and
                                                        • Environmental         Management        and
                                                           Conservation
        Local Area Plan:                                Not Applicable
        Overlay Mapping:                                Within the land the following overlays apply:
                                                        • Acid Sulfate Soils – Above 5m AHD to
                                                           20m AHD (Area 2), in part;
                                                        • Biodiversity, Waterways and Wetlands –
                                                           Area of Biodiversity Significance, in part;
                                                        • Bushfire Hazard - High Potential Bushfire
                                                           Intensity, Medium Potential Bushfire
                                                           Intensity and Potential Impact Buffer, in
                                                           part
                                                        • Flood Hazard, in part; and
                                                        • Landslip Hazard, in part.
        Level of Assessment:                            Code Assessment
        Noosa Plan 2020:                                Most relevant provisions include:
                                                        • Community facilities zone code;
                                                        • Infrastructure activities code; and
                                                        Works Codes, including:
                                                           • Driveways and Parking Code;
                                                           • Earthworks Code; and
                                                           • Water Quality and Drainage Code




       22019 – Noosa Council Expansion of Landfill, November 2023                        Page 5

Page 6

“Specialist services and practical solutions”



       Executive Summary

       The proposal seeks to change the current development approval to allow for an expansion of
       the existing landfill operation over a vegetated area of the site that is already bounded by the
       landfill on three (3) sides. This land protrudes into the existing Resource Recovery Area (RRA)
       and contains remanent vegetation.

       The subject land has an area of about 1ha. When compared to the size of the existing landfill
       facility and the amount of vegetated land remaining (Lot 77) as a whole, the proposed
       expansion is over a relatively small portion (0.3% of Lot 77). It is also important that most of
       the Lot 77 is included within the Community Facilities Zone (annotated Utility Installation),
       which stems from superseded planning schemes and the 1997 Strategic Plan that designated
       all this land for landfill. Consequently, despite the current environmental overlays and
       designations, the land has been historically zoned and intended for landfill.

       The key issues to be considered are summarised below:

           •    Community need - Council has the expectation and responsibility to provide an
                adequate waste service for the shire. With the region is growing, so is the volume of
                waste being produced. Expansion of the RRA is critical to provide sufficient space for
                Council to meet waste deferral expectations and the communities need.

           •    Safety Improvements - Council has a duty of care to provide a safe work environment
                for staff, contractors and the public using the landfill. Expansion of the RRA is critical
                to offer sufficient space for Council to manage safety risks and provide a safe work
                environment within the RRA.

           •    Environmental impacts - Council must operate the landfill under the Environmental
                Authority (EA) permit (EPPR01855314) for the site. Council has a general environmental
                duty and is obligated under the Environmental Protection Act 1994, to take all
                reasonable measures to prevent environmental harm. Expansion of the RRA is critical
                to enable the relocation and upgrade of the sites northern High Efficiency Sediment
                (HES) Basin, so that Council can achieve compliance with the sites EA and the
                Environmental Protection Act 1994.

       To the extent there is any inconsistency with the planning scheme, this is minor and of a
       technical nature only in the circumstances. Further, there is an overwhelming need for the
       proposed expansion of the landfill for the following reasons:

           •    There is no other land within Lot 77 that can be used for this purpose in the
                circumstances, given the location of the existing infrastructure.

           •    The operation of the existing landfill is to be aligned with the regional waste plan, with
                the management of waste being a critical issue given the ever-increasing population
                growth.




       22019 – Noosa Council Expansion of Landfill, November 2023                           Page 6

Page 7

“Specialist services and practical solutions”



           •      Local government is required to continuously promote and implement waste
                  avoidance, reduction and resource recovery actions to meet National waste standards,
                  and the proposed development forms an important component within that process.

           •      Without additional land to increase the RRA, the existing landfill operation will continue
                  to be restricted and not enable waste avoidance to the detriment of the environment
                  and the Noosa community more generally.

           •      The current size of the RRA is restricted, which is increasing the level of risk to staff,
                  contractors and the public, given heavy machinery is operated within a constrained
                  area.

           •      The Council has a significant duty of care to meet workplace health and safety
                  obligations to ensure that the landfill is operated in a safe manner, which needs to be
                  continuously reviewed and improved to meet current standards, and as result of
                  population growth.

           •      The general community is incurring additional costs associated with the onsite
                  management of the RRA area because of the increased safety issue, which currently
                  requires continuous and careful management.

           •      The expansion of the RRA will provide for better management of green waste over a
                  larger area to prevent self-combustion and reduce the risk of bushfire because a
                  greater amount of separation can be provided to the adjoining bushland.

           •      The proposed expansion of the RRA will allow for the relocation and enlargement of
                  the existing HES Basin, which will provide substantial environmental benefits in terms
                  of improved stormwater and water quality management; and

           •      The proposed HES Basin will also improve flood mitigation by having improved
                  resilience during major rainfall events, to further reduce the risk of causing serious
                  environmental harm to the adjoining low lying wetland areas.

       The development will result in the removal of about 1 ha of remanent vegetation, which cannot
       be avoided. The finger of vegetation to be removed protrudes into the existing landfill and is
       suffering from the following impacts:

           i)        Historical clearing for access tracks/rural land uses;
           ii)       Modification of drainage lines;
           iii)      Adjacent industrial uses (landfill and depot) – litter incursion;
           iv)       Ongoing slashing and maintenance along two sides;
           v)        Presence of weed/non-native species including Singapore Daisy (Sphagneticola
                     trilobata), Camphor laurel (Cinnamomum camphora), Lantana (Lantana spp.), and
                     Setaria Grass (Setaria sphacelata); and
           vi)       Edge effects (increased light, wind, dust and noise) along three boundary lines.1

       1 Noosa Landfill & RRC – Flora and Fauna Assessment, page 6




       22019 – Noosa Council Expansion of Landfill, November 2023                             Page 7

Page 8

“Specialist services and practical solutions”




       The loss of this vegetation is to be offset elsewhere on the site comprising about 1.8ha, this
       being nearly double the size of the subject land, and will not result in a significant residual
       impact, subject to the proposed mitigation measures being implemented.

       The extent of the vegetation loss needs to be considered in context with the amount of
       vegetation within the land (Lot 77), despite being designated for landfill for many years. The
       land (Lot 77) has a total area of about 322ha, most of the which forms part the Weyba Nature
       Reserve and is to be protected in the long term.

       While there is an increase in the scale of the use, given its nature, there is no increase in the
       intensity. There will be no significant increase in traffic movements with no change to the
       current access and egress from Eumundi Noosa Road.

       In summary, there is a significant community and planning need for the proposed expansion
       of the existing landfill, and the subject land is already suffering from edge effects because it
       protrudes into the RRA. In the circumstances, the location of the new development is practical
       and logical. The loss of vegetation is to be offset to the south of the site. The proposed
       development represents a legitimate case where an environmental offset is warranted to
       provide for the expansion of community infrastructure. Given the above, there will be no town
       planning consequences arising from the proposed change.




       22019 – Noosa Council Expansion of Landfill, November 2023                         Page 8

Page 9

“Specialist services and practical solutions”



       Introduction

       The development application is for an “other change” to an existing development approval
       (2005/638) for a material change of use for an expansion to the existing Waste Disposal and
       Recycling Facility and associated vegetation clearing works, which provides for the existing
       Noosa Landfill.

       The land is located at 561 Eumundi Noosa Road, Doonan described as Lot 77 on SP298776.
       The land is collectively comprised of several parcels that form Lot 77 (refer Figure 1). The land
       area is approximately 321.9 ha collectively; however, the existing landfill area is much smaller
       having an approximate area of about 49 ha. The change application relates to a smaller parcel
       of land comprising about 1 ha located towards the northwest, which is vegetated.
       Consequently, in that context, represents a relatively small expansion of the existing landfill.

       The proposed change will provide for an expansion of the existing Resource Recovery Area
       (RRA). This new area will provide for the relocation and expansion of the existing High
       Efficiency Sediment (HES) Basin to improve water quality objectives and useability of this part
       of the landfill site. This in turn provides for additional land to be used for resource recovery
       for which there is a significant level of need to improve waste reduction and public safety.

       While there is an increase in the scale of the waste disposal and recycling facility, there is no
       increase in the intensity of the land use and therefore will not cause additional operational
       impacts. When considering the location of the proposed expansion, the development
       represents a logical and practical expansion of the existing RRA in response to an identified
       community and planning need.


       Application Background

       A prelodgement meeting was held with the State Assessment Referral Agency (SARA) on 24
       May 2022, with a copy of the prelodgement minutes provided as Attachment 1A. In
       accordance with the advice received from SARA, the applicant has obtained a relevant purpose
       determination under section 22A under the Vegetation Management Act 1999, which is
       provided as Attachment 1B.

       Given the application is for an “other change” it is to be assessed in accordance with section
       82 of the Planning Act 2016. Consequently, the relevant provisions that apply as if … the change
       application were the original development application, with the changes included, but was made
       when the change application was made. Therefore the “other change” application is to be
       assessed against the Noosa Plan 2020 but is to be considered in context with the existing
       development approval2.

       The application is subject to code assessment consistent with the assessment of the original
       development application under the Noosa Plan 2006. Pursuant to section 82 of the Planning


       2 Planning Act 2016, section 82(2)




       22019 – Noosa Council Expansion of Landfill, November 2023                         Page 9

Page 10

“Specialist services and practical solutions”



       Act 2016 (PA2016) the relevant provisions that apply are the assessment benchmarks under
       the Noosa Plan 2020.


       Subject Site

       The land is located at 561 Eumundi Noosa Road, Doonan and is described as Lot 77 on SP
       298776 (Lot 77). The land comprises multiple allotments that collectively form Lot 77 and has
       an area of approximately 322 ha.

       The land is located on the eastern side of Eumundi-Noosa Road and has direct access and
       egress to Eumundi-Noosa Road, which is to remain unchanged. The existing landfill is located
       within the southwestern portion of the land, which abuts the unformed Rutch Road to the
       southwest.

       The majority of the land contains a significant amount of regulated vegetation. This land
       extends northwards to Hollett Road, eastwards to Walter Hay Drive and further to Tidswell
       Road. Further, extends towards the south on the southern side of the unformed Rutch Road
       and further to the south of and abuts Emu Mountain Road (refer Figure 1A).




                                                           Proposed landfill expansion area.




       Figure 1A – Aerial Photograph (Noosa Council – Interactive Mapping)

       The landfill site itself is located towards the southwest of Lot 77 with vegetation retained along
       the Eumundi Noosa Road frontage and adjoining the unformed Rutch Road. The existing
       internal access road within the landfill is also partly located within Rutch Road.

       The proposed expansion of the RRA is over an isolated area of land, generally having an oval
       shape towards the north, which contains remanent vegetation, as shown in Figure 1B, below.



       22019 – Noosa Council Expansion of Landfill, November 2023                              Page 10

Page 11

“Specialist services and practical solutions”




                                                                             Subject Land




       Figure 1B – Aerial Photograph of subject land

       The existing landfill has been shaped and falls away from the landfill cells that have been filled
       overtime. Stormwater from the site falls to the internal overland stormwater drainage system,
       which is directed towards the existing HES Basin, currently centrally located within the existing
       RRA (refer Figures 1A & 1B).

       The landfill site provides collectively for the landfill cells, resource recovery operational area,
       customer interface, weighbridge and access and recoverables area. The site also contains the
       Cleanaway Depot to the northwest and the “Reviva” recycling shop, generally centrally located.


       Approval Background

       The current development was approved as a landfill site in 2005 under a development permit
       for a material change of use for an Expansion of Special Purpose (Waste Disposal and Recycling
       Facility) and Ongoing Clearing Purposes (2005/ 638). A copy of the development approval is
       provided as Attachment 2A. An extract of the approved plan is provided as Figure 2 below.
       A “generally in accordance with” request was also issued on 29 June 2021, a copy of which is
       provided as Attachment 2C.

       The current development approval contains concurrence agency conditions from the
       Department of Main Roads (DMR) and the Department of Natural Resources & Mines (DNRM)
       as they were known at the time. In particular, the conditions imposed by the DNRM allowed
       clearing of regulated vegetation in accordance with Permit A, which is reproduced as Figure
       3, below.




       22019 – Noosa Council Expansion of Landfill, November 2023                           Page 11

Page 12

“Specialist services and practical solutions”




       Figure 2 – Extract of Approved Plan (2005/0638)




       Figure 3 – Extract of Permit A (Source: DNRM)

       The conditions of approval including Permit A, allowed for the clearing of regulated vegetation
       subject to an environmental offset being provided to allow for the proposed landfill (refer
       condition 2.9 – Attachment 2A & 2B). The condition required an Offset Restoration Plan
       providing for a minimum of 24 hectares of land within the area of properties provided in Table
       1. Further, the restoration plan is to achieve 19ha of a remanent “Endangered” regional
       ecosystem and a minimum of 5ha of remanent “Not of Concern” regional ecosystem within 20
       years of the commencement of the use. Consequently, compliance with the environmental
       offset is to be achieved by 2026 and at this stage is well advanced (discussed below).




       22019 – Noosa Council Expansion of Landfill, November 2023                      Page 12

Page 13

“Specialist services and practical solutions”



       A Remnant Vegetation Restoration Plan, Lake Macdonald Catchment was approved by
       Queensland Government Department of Natural Resources, Mines and Energy (NRME) on 19
       January 2006, which detailed the processes and management required to restore a minimum
       of 24ha of vegetation by 2026 consistent with condition with 2.9 (above). A copy of the
       Vegetation Offset Restoration Plan for Lake Macdonald is provided with the report provided
       by Native Foresters, dated 20 September 2022 (refer Attachment 3).

       The Council has substantially progressed the Offset Restoration Plan with the rehabilitation of
       land around Lake Macdonald to achieve the remnant status required, comprising a minimum
       of 24ha of vegetation within the offset areas in terms of canopy height and cover, and species
       composition by June 2026. This includes 19ha of “Endangered” listed Regional Ecosystems (RE)
       12.3.1 and 5ha of “Of Concern” RE 12.3.2. The Council also intends to restore up to 11.1ha of
       additional “Least Concern” RE 12.3.11. The required vegetation communities are summarised
       in Table 1 of the report provided (refer Attachment 3).

       The offset areas comprise 27 sites having a total land area of 39.1ha, which covers parts of the
       20 allotments surrounding the upper sections of Lake Macdonald. This land was originally
       under Noosa Council tenure; however, changes in the ownership of water assets mandated by
       the State resulted in Lake Macdonald and the land containing the offset now being under SEQ
       Water tenure.

       SEQ Water is working in collaboration with Noosa Council to enable delivery of the
       environmental offset and a request already made for as Property Map of Assessable
       Vegetation (PMAV) over the land to voluntarily establish a Category A regulated vegetation -
       a conservation offset. The application for a PMAV has been lodged with the Department of
       Resources and it is understood that this has reached an advanced stage.

       The PMAV will ensure the protection of the environmental offset area in the long term.
       Changes are required to the current development approval to reflect the land to be offset,
       including the land sought to be cleared for the expansion of the RRA.


       Development Proposal

       The applicant is seeking to change the current development approval to increase the size of
       the RRA over a pinnacle of vegetated land comprising about 1 ha, which protrudes into the
       existing land fill area as shown in Figure 3, above (refer Attachment 4). The land to be used
       for the proposed expansion of the landfill is shown on the Master Plan (refer Figure 4).

       The subject site (approximately 1.0 hectares) is situated to the north of the existing landfill and
       adjoining the existing RRA and to the east of the Cleanaway Depot to the northwest. The
       subject site adjoins a drainage line with remnant vegetation to the west and existing landfill
       infrastructure to the east and south consisting of access tracks, mown grass pad areas, a
       constructed HES Basin and a vegetated pond.




       22019 – Noosa Council Expansion of Landfill, November 2023                         Page 13

Page 14

“Specialist services and practical solutions”




       Figure 4 – Extract of Master Plan

       Under the Master Plan, the subject land will provide much needed land for the existing RRA
       operation, by allowing for greater separation within the working area, which is accessed by the
       general public to dump steel, concrete and vegetation amongst other materials into separate
       and distinct areas. Heavy machinery is regularly used in this part of the site to push and
       manage the waste, which is currently a high risk operation because of the restricted and limited
       space. There is currently a real need to actively manage this part of the operation to reduce
       the safety risk by using spotters at busy times, increasing the cost to the general community.

       The works to be undertaken within the RRA will provide for the construction of a new HES
       Basin and facilitate the removal/filling of the existing basin to provide a larger constructed
       resource recovery pad area as shown in Figure 4. No other structures are proposed within the
       subject area, including any buildings that might be subject to the exempt clearing provisions
       under the Planning Regulation 2017.


       Need

       The applicant has identified that there is a real and pressing need to expand the existing landfill
       site for many reasons, which are discussed below.

       In terms of providing some context, an expansion to the existing landfill site occurred in about
       2005 and occupies a portion of the land (Lot 77), this being about 49ha, with Lot 77 as a whole
       having an overall area of 322ha. This land has always been intended for a community purpose;
       however, it is acknowledged that most of the land has ecological value.




       22019 – Noosa Council Expansion of Landfill, November 2023                         Page 14

Page 15

“Specialist services and practical solutions”



       Given most of the land is designated for landfill (utility installation), it must be reasonably
       expected that the landfill operation would continue to expand to cater for the increased waste
       generated and to reduce the reliance on landfilling. The expansion of operation necessarily
       requires more land; however, where carefully managed and implemented the amount of land
       needed can be minimised to reduce the environmental impacts.

       It is also reasonably expected that more land might be required for other waste management
       facilities and initiatives that could provide for a greater amount of waste reduction and other
       benefits in the long term. This could include use of other sustainable resources generated by
       waste such as menthane production along with the addition of solar power, providing
       substantial environmental and cost saving benefits to the Noosa community. This could also
       extend to the development of green industries that would have a direct association with the
       waste facility and benefit from such resources in the future.

       In terms of the need to expand the landfill, the following comments are provided:

           •    Regional waste problems – There are substantial benefits to be provided by the
                development in terms of being better aligned with regional waste plans. Waste is an
                increasing issue for the region and Queensland more generally. State and local
                government waste plans promote waste avoidance, reduction, and resource recovery
                actions. In this case there is a substantial need to expand the RRA area to continue to
                develop and improve resource recovery operations to achieve and maintain National
                targets. The current resource recovery component is currently constrained by space,
                and this affects the ability to facilitate and enable waste avoidance, which is of key
                importance to managing waste in the long term.

           •    Risk to public safety - The current RRA has limited space available for public and
                commercial operations to safely separate and dispose of recyclables. The RRA involves
                the direct access by the public to the various recyclable/material locations, with heavy
                machinery also operating in these locations. There is currently a high level of risk
                associated with this part of the operation, which has been identified as a work place
                health and safety issue. Council is currently intermediately managing the operation on
                this part of the site, with the use of staff as spotters to reduce the level of risk associated
                with the operation of heavy machinery during busy periods. The expansion of the RRA
                will provide the necessary space and separation to mitigate this safety risk to an
                acceptable level.

           •    Fire risk, green waste stockpiling and separation - Fires associated with landfill sites
                pose a significant risk to the operation, the environment and emergency services.
                Council is acutely aware of the fire risk in this location, with the surrounding vegetation
                having a medium and high fire risk designation under the planning scheme. The limited
                space of the RRA has increased the difficulty of maintaining safe offsets between
                mulch/green waste stockpiles and the surrounding vegetation. This is particularly the
                case for green waste, which can spontaneously combust if not properly managed.
                Incorrectly managed mulch stockpiles because of reduced space could place the site
                and the surrounding environment at increased risk from fire.




       22019 – Noosa Council Expansion of Landfill, November 2023                              Page 15

Page 16

“Specialist services and practical solutions”




           •    Improved environmental compliance and flood resilience – The existing HES Basin
                is smaller and generally centrally located within the RAA towards the west. The
                expansion of the RRA provides for an enlarged HES Basin to be constructed and
                relocated to provide a more efficient operational space. With increased operations and
                more frequent severe weather events, it is vital that the landfill infrastructure is resilient
                to handle major events and minimise the risk of downstream environmental impacts.
                The additional space is required to improve the water quality management on the site
                to prevent environmental harm. Furthermore, the proposed location for the new basin
                will also improve flood resilience for the landfill site, which is highly desirable.

       In summary, it is suggested there is a significant need for the proposed development. This is
       because the expansion will help maintain recovery operations to meet National standards,
       reduce current safety concerns, reduce the current fire risk and allow for proper management
       of green waste and improve environmental compliance and flood resilience.


       Planning Act 2016

       Under the Noosa Plan 2020 (the planning scheme) the proposed use is defined as a Utility
       installation which means premises for –
           a) a service for supplying or treating water, hydraulic power or gas; or a sewerage, drainage
                or stormwater service; or a
           b) transport service; or
           c) a waste management service; or
           d) a maintenance depot, storage depot or other facility for a service stated in paragraphs
                (a) to (d).

       The current approval was granted under the 1985 Schedule to the Planning Scheme, which
       predated the Noosa Plan 2006, and provided for an Expansion of Special Purpose (Waste
       Disposal & Recycling Facility) & Ongoing Clearing Purposes, which is reflective of the Special
       Uses Zone applying at that time. Consequently, the use of the site as a Utility installation is
       consistent with the current approval.

       Under the planning scheme, the subject land is included within the Community Facilities Zone
       (annotated utility installation) and a utility installation is subject to code assessment. It is noted
       the original application was also subject to code assessment under the superseded planning
       scheme.

       The application is to be assessed under section 82 of the PA2016 and is to be considered in
       context with the current development approval. The relevant provisions that apply are those
       as if the change application were the original development application, with the changes
       included, but made when the change application is made (section 82(2)(a)). The application is
       to be assessed under section 45 of the PA2016 and in accordance with the Development
       Assessment Rules.




       22019 – Noosa Council Expansion of Landfill, November 2023                             Page 16

Page 17

“Specialist services and practical solutions”



       The intent of the reference to assessing and deciding the change application “in the context
       of the development approval” is that the proposed change should not be considered in
       isolation. Neither is the entirety of the development including the change re-assessed. Instead,
       it is intended the change be assessed with reference to the context of the development
       approval already existing for the development3.


       State Policy Assessment

       South East Queensland Regional Plan

       Under part 2.2 of the planning scheme, the Planning Minister has identified that the Noosa
       Plan 2020 appropriately advances the South East Queensland Regional Plan 2017 (SEQRP) as
       it applies to the planning scheme area. Consequently, an assessment against the SEQRP is not
       required. The subject land is included within the Regional Landscape and Rural Production
       Area.

       State Planning Policy 2017

       Under part 2.1 of the planning scheme, the Planning Minister has advised the State Planning
       Policy (SPP) dated July 2017 is appropriately integrated within the Noosa Plan 2020 in the
       following ways:
           • Liveable communities and housing
           • Economic growth
           • Environment and heritage
           • Safety and resilience to hazards;
           • Emissions and hazardous activities; and
           • Infrastructure.

       Under part 2.1.1, the State interests not integrated or only partly integrated, include:
          • Natural hazards, risk and resilience for coastal hazards, in part, with respect erosion
             prone areas.

       The subject land is affected by a Medium Potential Bushfire Intensity and Potential Impact
       Buffer under the mapping (refer Figure 5).

       In the circumstances, the proposed development will result in the removal of all vegetation
       within the subject land to facilitate the expansion of RRA. Further, does not involve the
       construction of a building, but rather will provide for an engineered designed pad and new
       relocated HES Basin. Consequently, the risk from bushfire to people and property is considered
       minimal, given the nature of the use and the level of risk is not worsened. Importantly, because
       no buildings are proposed within the RRA, the development is unlikely to result in additional
       essential management clearing to reduce the risk of bushfire.


       3 Planning Bill 2015, page 91




       22019 – Noosa Council Expansion of Landfill, November 2023                       Page 17

Page 18

“Specialist services and practical solutions”



       The State does not provide flood hazard mapping but rather relies on the local government
       mapping. The subject site is affected by flooding under the Flood Hazard Overlay Map (refer
       Figure 13, below). The flood hazard area is within the middle of the existing landfill site and
       wholly across the subject land.




       Figure 5 – Extract of SPP Bushfire Mapping (Source: SPP Interactive Mapping)

       The applicant has engaged Hydrology and Water Management Consulting Pty Ltd, who has
       completed a flood assessment to inform the design of a proposed expansion of the RRA and
       the new enlarged HES Basin (refer Attachment 5A). The detailed flood models have been
       established and validated and used to create flood maps for the existing and proposed cases.
       The model has been re-run to cater for rare events, the results of which are provided in the
       additional Technical Memorandum (refer Attachment 5B).

       The modelling has determined the impact on peak design flood levels likely to be caused by
       the filling of the new RRA pad area. The hydraulic engineer has advised that there is a re-
       distribution of floodwaters in the floodplain downstream of the filling; however, there are no
       adverse impacts that are likely to affect any infrastructure on the site or surrounding area4.

       The proposed development for the improved RRA and HES Basin will not result in added risk
       to people and property. Further, the extent and depth of earthworks to be undertaken is
       governed by the outlet of the proposed HES Basin, which is addressed in the Stormwater
       Management Plan prepared for the site (refer Attachment 6).

       Other matters, such as the protection of water quality have also been appropriately reflected
       into the planning scheme and do not need to be considered further under the SPP. The
       detailed Stormwater Management Plan prepared is primarily intended to manage water
       quality to meet current environmental standards under the environmental authority for the
       site, while also accounting for flooding. The extent of flooding is not worsened by the
       proposed works and will not adversely impact other properties.

       4 Noosa Landfill RRA Flood Assessment, part 8




       22019 – Noosa Council Expansion of Landfill, November 2023                      Page 18

Page 19

“Specialist services and practical solutions”




       The proposed development is consistent with the SPP.

       Planning Regulation 2017

       Under the State Assessment Referral Agency (SARA) mapping, the site fronts a state controlled
       road, with the landfill located on land within 25m of a State controlled road (refer Figure 6).




       Figure 6 – State Assessment Referral Agency (SARA) Mapping
       Under Schedule 10 of the Planning Regulation 2017 (PR2017) the application requires referral
       to SARA, pursuant to Part, 9, Division 4, Table 4, Item 1 being within 25m of a State transport
       corridor. It is noted the application was originally referred to the Department of Main Roads
       (as a concurrence agency) under the current approval. A copy of the State Development
       Assessment Provisions for State Code 1: Development in a state-controlled road is provided
       as Appendix A.

       The subject land is also within the Koala Priority Area and the Core Koala Habitat Area in part
       and the Locally refined koala habitat area, in part (refer Figure 7, below).

       Under Schedule 10, part 10, Koala habitat in the SEQ Region, development is prohibited
       development where located within a koala priority area and koala habitat area, which is the
       case here, unless exempted development.

       Under the PR2017, exempted development includes at (d) development for infrastructure
       stated in Schedule 5 if the development is carried out by or for the State or a public sector
       entity. Under Schedule 5 – Infrastructure, includes at 16 – waste facilities. Consequently, the
       clearing of koala habitat for this purpose is not prohibited development.




       22019 – Noosa Council Expansion of Landfill, November 2023                      Page 19

Page 20

“Specialist services and practical solutions”



       Under Schedule 10, Part 3 – Clearing of native vegetation, the clearing of regulated vegetation
       is prohibited development unless under a development approval. While the proposed clearing
       has a relevant purpose determination (refer Attachment 1B), the application requires referral
       to SARA under Division 4, Table 3 for a material change of use, being on land greater than 5ha
       and involves the clearing of regulated vegetation.

       A copy of the State Development Assessment Provisions for State Code 16: Native vegetation
       clearing is also provided in Appendix A.




       Figure 7 – Extract of koala habitat mapping (Source: DA Mapping).

       No other referrals are applicable to the “other change” application under Schedule 10 of the
       PR2017.


       Noosa Plan 2020

       Zoning and Tables of Assessment

       Under the Noosa Plan 2020, the subject land is included within the Community Facilities Zone
       and designated Utility Installation (refer Figure 8).

       While part of Lot 77 is also included within the Environmental Management and Conservation
       Zone, this land is not affected by the proposed change. Further, the subject land is over a
       relatively small portion of land included within the Community Facilities Zone, when compared
       to the area of the land parcel as shown in Figure 8.

       It has always been the intent to use the land for the purpose of expanding the landfill as
       required to meet the needs of the local community; however, given the ecological value over



       22019 – Noosa Council Expansion of Landfill, November 2023                      Page 20

Page 21

“Specialist services and practical solutions”



       the majority of the land, this land has been included within Weyba Nature Reserve (refer Figure
       9, below). While this land remains in the Community Facilities Zone, it is evident that the
       current zoning has been overtaken by events, at least in part.




       Figure 8 – Extract of zoning plan on aerial photograph (Source: Noosa interactive mapping)

       There remains an area of land to the northeast and east that is not included within the Weyba
       Nature Reserve, including the subject land. It is expected that the current zoning of this land
       is not likely to change in the future, in order to cater for an identified community need for the
       expansion of the existing landfill, subject to a further development approval.




       Figure 9 – Extract of Open Space Mapping (Source: Intramaps)

       Under the table of assessment for the Community Facilities Zone (annotated Utility installation)
       the use is code assessable being consistent with the annotation. The applicable codes for the
       assessment include:
           • Community facilities zone code




       22019 – Noosa Council Expansion of Landfill, November 2023                        Page 21

Page 22

“Specialist services and practical solutions”



           •    Community activities code and
           •    Works codes - to the extent relevant.

       Under the overlay mapping, the subject site has the following designations:
          • Land subject to acid sulfate soils – above 5m AHD to 20m AHD (refer Figure 10);
          • Biodiversity – MSES Environmental values & Area of Biodiversity Significance (refer
              Figure 11);
          • Bushfire hazard – Medium Potential Bushfire Intensity (Figure 12);
          • Flood hazard – Flooding and inundation (refer Figure 13).

       Other overlays also apply such as landslide hazard (moderate) and regional infrastructure
       (major electricity) in Rutch Road, but these are not relevant to the assessment of the subject
       land.




       Figure 10 – Extract of acid sulfate soils




       Figure 11 – Extract of Biodiversity, waterways and wetlands




       22019 – Noosa Council Expansion of Landfill, November 2023                     Page 22

Page 23

“Specialist services and practical solutions”




       Figure 12 – Bushfire hazard overlay




       Figure 13 – Flood hazard overlay

       With respect to the overlay codes the following are most relevant having regard to the subject
       land:
           • Acid sulfate soils overlay code;
           • Biodiversity, waterways and wetlands code;
           • Bushfire hazard overlay code; and
           • Flooding overlay code.

       Overlay Codes

       It is noted that under part 1.5 of the planning scheme and the hierarchy of assessment
       benchmarks, overlays prevail over zone codes, use codes and other development codes to the
       extent of any consistency.




       22019 – Noosa Council Expansion of Landfill, November 2023                     Page 23

Page 24

“Specialist services and practical solutions”


       Biodiversity Overlay Code

       With respect to the impact on the biodiversity values, the applicant has engaged Native
       Foresters to consider the ecological values on the subject land and the impact caused by the
       proposed development (refer Attachments 7A, 7B, 7C & 7D).

       According to Native Foresters, the existing landfill including the RRA covers an area of
       approximately 49ha within Lot 77, which has a total area of approximately 322ha. Most of the
       southern section of the parcel forming part of Lot 77 is cleared where the existing landfill is
       located.

       The entire northern section of the main parcel of Lot 77, and directly north of the proposed
       development contains remnant vegetation, which covers an approximate area of 200ha and
       forms a continuous patch to the northern boundary. East of the landfill site is Walter Hay Drive
       with smaller parts of Lot 77 on the eastern and southern side of the road mapped as State
       conservation areas (Weyba Nature Refuge – Figure 9).




       Figure 14 – Regulated vegetation (Source: Native Foresters)

       Within the subject land, the vegetation is composed of open woodland, which contains large
       eucalypts over an understorey of native shrubs associated with heathland ecosystems with
       some weed incursions. Broad-leaved paperbark (Melaleuca quinquenervia) is dominant in low-
       lying areas, forming dense patches5.


       5 Native Foresters, Noosa Landfill & RCC – Northern Section – Fauna and Flora Assessment, page 3 & 4




       22019 – Noosa Council Expansion of Landfill, November 2023                                             Page 24

Page 25

“Specialist services and practical solutions”



       The proposed development will include the removal of vegetation in a relatively small area (in
       comparison to the extent of existing vegetation) this being the subject land, which adjoins the
       existing landfill area and having infrastructure on three sides (Figure 14). The proposed
       development will allow for the expansion of the RRA and the continued provision of waste
       management within one isolated location, which is logical and more efficient in the long term.

       As part of the application process, Council has undertaken ecological assessments to identify
       the impacts. Flora and fauna assessments have been undertaken both within the proposed
       landfill expansion area, which constitutes the impact area and adjacent to the existing landfill
       site. These ecological assessments were conducted between 2019 and 2022 and included:

           a) Impact Assessment Report for Matters of MNES & MSES, by Native Foresters, dated 16
              July 2022;
           b) A Flora and Fauna Assessment of Noosa Landfill northern expansion area undertaken
              by Native Foresters in January 2021, Document No. 200112-FF-Rev 2.
           c) A Flora and Fauna Assessment and Assessment of impacts on adjoining ecosystems of
              the Noosa Landfill and RRC expansion (Lot 77 SP298776). This was undertaken by
              Native Foresters in 2019 and revised in 2021, Document No. 190330-Rev3.
           d) Impact Assessment and Management Plan (IMP) – EVNT Species Breeding Places –
              Noosa Landfill Expansion. Prepared by Native Foresters January 2021, Document No.
              200112-Rev2.

       (refer to Attachments 7A – 7D)

       Some of the existing impacts reported on this part of the site include the following:
          i. Historical clearing for access tracks/rural land uses;
          ii. Modification of drainage lines;
          iii. Adjacent industrial uses (landfill and depot) with litter incursion;
          iv. Ongoing slashing and maintenance along two sides;
          v. Presence of weed/non-native species including Singapore Daisy (Sphagneticola
               trilobata), Camphor laurel (Cinnamomum camphora), Lantana (Lantana spp.), and
               Setaria Grass (Setaria sphacelata); and
          vi. Edge effects (increased light, wind, dust and noise) along the three boundary lines6.

       The final report follows the recommendations of the ecological assessment and includes self-
       assessments to determine if the following may occur:
           1. Significant Impacts (SI) to prescribed environmental matters for Matters of National
               Environmental Significance (MNES); and
           2. Significant Residual Impacts (SRI) to Matters of State Environmental Significance
               (MSES).

       The consultant has advised the vegetation within the subject land to be cleared is mapped as:
          • Category B vegetation - Endangered RE12.5.3;
          • Essential Habitat;
          • Animals-Threatened Species; and

       6 Native Foresters, Noosa Landfill & RCC – Northern Section – Fauna and Flora Assessment, page 6




       22019 – Noosa Council Expansion of Landfill, November 2023                                         Page 25

Page 26

“Specialist services and practical solutions”



           •    Koala Habitat Area – Core & Locally refined (SEQ) and Priority Koala Habitat Area.

       In terms of MNES, the ecologist has advised that subject to the mitigation measures being
       implemented, the proposed development will not have a significant impact on habitat for
       Koala for the following reasons:

           •    Although the area of interest contains suitable koala habitat, and the area does contain
                koala food and habitat tree species, the total area to be cleared 1.02ha and will not
                significantly reduce the area of occupancy, fragment or decrease the local population of
                koala;
           •    Clearing of an area of koala habitat smaller that 2ha, which is bounded on three sides
                by existing landfill and already moderately disturbed, will not significantly impact the
                quality of the remaining habitat, and is not likely to adversely affect habitat critical to
                the survival of the koala;
           •    Breeding cycle and essential life processes are unlikely to be significantly impacted by
                the proposed clearing works; and
           •    Clearing the impact area is considered unlikely to interfere substantially with the recovery
                of the koala through the introduction or exacerbation of key threats in areas of habitat
                critical to the survival of the koala as the proposed clearing is considered small enough
                that threats including edge effects and invasive species encroachment to adjoining
                suitable habitat will be relatively minimal and mitigated through appropriate
                management7.

       In terms of the MSES, the assessment undertake has revealed the clearing of regulated
       vegetation is unlikely to have an SRI on the Endangered Regional Ecosystem RE12.5.3 for the
       following reasons:

           •    The vegetation clearing is less than 5ha.
           •    The clearing does not reduce remaining ‘Endangered’ vegetation to less than 5 ha when
                the overall area including vegetation located on adjacent lots is considered.
           •    Vegetation clearing will not further separate or fragment regional ecosystem
                communities onsite.
           •    The clearing constitutes less than 10% of the total mapped area of ‘Endangered’ RE12.5.3
                that intersects the property boundary of the expansion area, and an equivalent area to
                that being cleared (0.21ha) will be rehabilitated within Lot 77 to reinstate RE12.5.3.8

       In terms of the impact upon koala habitat, the ecologist has advised that:

       The prescribed activity is likely to have an SRI unless mitigation measures can avoid significant
       impacts occurring, and that environmental offsets under the Environmental Offsets Act 2014,
       may be required for prescribed activity on the following matters:

           •    1.02 ha of Koala Habitat within a Koala Priority Habitat Area on Lot 77 SP298776.


       7 Noosa Landfill & RRC Expansion – MNES & MSES Significant Impact Assessment, page 11
       8 Noosa Landfill & RRC Expansion – MNES & MSES Significant Impact Assessment, page 29




       22019 – Noosa Council Expansion of Landfill, November 2023                              Page 26

Page 27

“Specialist services and practical solutions”



       Significant Residual Impacts on the above MSES – Core Koala Habitat are considered likely to be
       averted if the mitigation measures proposed below are delivered:
           • Progressive rehabilitation of landfill areas that have ceased operation.
           • Rehabilitation and protection of adjacent regulated vegetation through weed control
               operations.
           • The delivery of a dedicated Koala Tree Offset planting to offset cleared Koala habitat
               trees at a rate of 3:1 (3 trees planted to every 1 cleared) over 1.02ha of appropriate land
               within Lot 77 SP298776 as shown in Appendix E.9

       Having regard to the Biodiversity, Waterways and Wetlands Overlay Code and the advice
       provided by the ecologist, the following comments are made about the overall outcomes:

           •    OO(a) – While the removal of the vegetation and wetland area will have some impact,
                the subject land is degraded, with most of the land within this parcel (Lot 77) being
                protected as a nature reserve. Further, the land to the south is to be rehabilitated
                providing an environmental offset of about 1.8ha for the area being removed.

           •    OO(b) – While the proposed development will have some impact on the site’s
                environmental values, in the circumstances, this cannot be avoided, with other
                alternative sites having been considered10. The proposed development will not cause
                a significant residual impact subject to the implementation of the mitigation measures
                discussed above.

           •    OO(c) – Given the shape and location of the subject land being effectively a pinnacle
                of vegetation protruding from a much greater vegetated area, the removal of this
                vegetation will not adversely impact connectivity within the land and is suffering from
                edge effects.

           •    OO(d) – The proposed development will not adversely impact upon ecological linkages
                and riparian vegetation.

           •    OO(e) – The proposed development will not extend further into the existing vegetated
                area and is aligned with the extent of the existing landfill boundary to the north and
                east. Given the nature of the use in this location, the development will minimise edge
                effects.

           •    OO(f) - While the development will have some impact, the assessment undertaken has
                revealed that any threatened species will not be significantly impacted subject to the
                implementation measures being adopted.

           •    OO(g) – Given the nature of the use and the location, the development will not provide
                for landscaping in this location but is proposing a Rehabilitation Offset Plan that will




       9 Noosa Landfill & RRC Expansion – MNES & MSES Significant Impact Assessment, page 30
       10 Noosa Landfill & RRC Expansion – MNES & MSES Significant Impact Assessment, page 16




       22019 – Noosa Council Expansion of Landfill, November 2023                               Page 27

Page 28

“Specialist services and practical solutions”



                provide for an equivalent regional ecosystem11 having an area of approximately 1.8 ha
                towards the south (Attachment 8).

           •    OO(h) - The proposed development has been designed and sited to minimise adverse
                impacts on koala having regard to the protection of the vegetation to the north within
                the nature reserve. Further, it is unlikely the impact will be significant if the proposed
                mitigation measures are undertaken as explained above.

       The applicant’s ecologist has provided the following advice (as summarised) under Part 5, with
       respect to the most relevant performance outcomes:

       •   PO1 – Under the flora and fauna assessments undertaken, the vegetation to be cleared
           was found to be a Melaleuca wetland exhibiting characteristics of Least Concern Regional
           Ecosystem RE12.3.5 – Melaleuca quinquenervia open forest on coastal alluvium. It was also
           found that this part of the site has been moderately disturbed with impacts including edge
           effects, weed infestation, some clearing for access tracks and also receives stormwater from
           the sediment basin on northern edge of the existing landfill. Further, Lot 77 will retain
           about 270.53 hectares of regional ecosystems following the works with the clearing
           required for the RRA expansion, this being 0.3% of the remnant vegetation on the land.

           Given the advice provided by the ecologist, the proposed development has been sited and
           designed to protect the physical and ecological integrity and biodiversity of the ecological
           important areas of the site and is consistent with this performance outcome. Other sites
           have been considered and the removal of the vegetation cannot be avoided.

       •   PO3 – The landfill expansion works cannot be practicably avoided and have been
           minimised as much as possible. The proposed clearing is logical and unavoidable in the
           circumstances being adjacent to the existing landfill on three (3) sides. Further, will also
           include improved stormwater infrastructure to manage stormwater flows and ensure this
           water is properly treated to not cause environmental harm beyond the existing and
           proposed landfill site. Consequently, the proposed development has been designed and
           sited to manage adverse impacts on ecological important areas and is consistent with this
           performance outcome.

       •   PO4 - The proposed clearing will be undertaken in accordance with a Construction
           Environmental Management Plan (CEMP) which will incorporate actions specific to
           protecting the environmental values on and adjacent to the site. The ecologist has advised
           that the works will be undertaken in accordance with a High-Risk Species Management
           Program. The development can be conditioned to comply with this performance outcome.

       •   PO5 – The vegetation that is to be removed is about 1.0ha in area, which juts into the
           existing landfill site, with landfill activities occurring on three (3) sides and resulting in
           substantial edge effects. The ecologist has confirmed that in the circumstances, the
           proposed development does not have any useful connectivity value and therefore does
           not offend this performance outcome.

       11 Noosa Landfill & RRC Expansion – MNES & MSES Significant Impact Assessment, page 38




       22019 – Noosa Council Expansion of Landfill, November 2023                               Page 28

Page 29

“Specialist services and practical solutions”




       •    PO6 – The proposed clearing for the landfill expansion is not within a mapped riparian
            buffer or mapped wetland area. While this area could be technically defined as a
            “melaleuca wetland”12, it does not have these true ecological values given this has
            developed over time because of the stormwater runoff from the existing landfill. The
            proposed development will not have an adverse impact on mapped wetland and riparian
            areas and is therefore consistent with this performance outcome.

       •    PO9 – One of the key outcomes being sought includes provision for an upgraded HES
            Basin with the intention of improving water quality entering the adjacent retained
            vegetation. Further, the applicant will be implementing a weed management program on
            the site. The proposed development complies with this performance outcome, which can
            be conditioned.

       •    PO10 – The proposed development will include a Weed Management Plan, primarily to
            deal with the invasive Singapore Daisy. An environmental offset is also proposed to the
            south of the site comprising about 1.8ha.13 Consequently, the proposed development
            provides for ecological important areas to be restored and enhanced with the proposed
            environmental offset able to be conditioned.

       •    PO11 – The proposed works will require the clearing of about 1.0ha of koala habitat;
            however, the ecologist has advised there are several measures that can be undertaken to
            reduce the impacts and risks to koala, including a 3:1 offset of koala trees 14. Given the
            location of the vegetation being removed, the proposed offset being provided, and the
            other measures to be implemented to mitigate the impacts, it is considered the
            development has been designed and will be constructed and operated to enhance koala
            habitat, consistent with the performance outcome.

       •    PO12 – The matter of bushfire risk will continue to be managed as is currently the case.
            Further, the proposed development provides for a new RRA pad area and the relocated
            HES Basin with no buildings being proposed on this part of the site. Consequently, essential
            management around any buildings to mitigate the risk of bushfire is not required, which
            could impact on the ecological values outside of the proposed landfill site. This is a matter
            also considered by the State Assessment Referral Agency (SARA) in the referral to be made.
            The proposed development is consistent with this performance outcome.

       •    PO13 – The proposed development requires the clearing of vegetation that is internal to
            the site and is bounded by the existing landfill on three (3) sides. The area of the site is not
            visible from the major road network and the removal of this vegetation will have no impact
            on scenic amenity or the vegetated character of the area. The proposed offset planting to
            the south will in fact provide additional screening vegetation to the existing landfill and
            improve the scenic amenity when viewed from Emu Mountain Road and Walter Hay Drive.



       12 Fauna and Flora Assessment, Rev 3, PO1, page 29
       13 Fauna and Flora Assessment, Rev 3, section 5.1, page 38
       14 Fauna and Flora Assessment, Rev 3, section 5.1, page 38




       22019 – Noosa Council Expansion of Landfill, November 2023                           Page 29

Page 30

“Specialist services and practical solutions”



           The vegetation in this area of the site is less dense/cleared and the existing landfill is more
           visible from the external road network in this location.

       In summary, despite the vegetation clearing that is being proposed, given the unique nature
       of the location and the existing edge effects, the proposed weed management and offset
       planting, including for koala habitat, the proposed development is largely consistent with the
       Biodiversity, Waterways and Wetlands Overlay Code. It is also noted that SARA approved the
       proposed development with the vegetation clearing, subject to conditions under the referral
       agency response dated 18 May 2023.

       Other Overlay Codes

       With respect to the overlay codes the following comments are made:
          • Acid sulphate soils - this is matter that can be conditioned to prevent the release of
              acid and metal contaminants adversely impacting on the natural environment. Further,
              in accordance with condition 7 under the current development approval, the applicant
              is required to manage acid sulphate soils in accordance with the former State Planning
              Policy 2/02 - Planning and Managing Development Involving Acid Sulphate Soils. This
              condition is likely to be updated under the change application, with a current Acid
              Sulfate Soils Management Plan to be provided.

           •    Bushfire hazard - while the subject site has a medium bushfire risk it is necessary for
                the vegetation to be removed to allow for the proposed expansion of the RRA. Further,
                no buildings are being proposed within this part of the landfill, therefore the risk to
                people and property from bushfire within the adjoining vegetation is minimised. It
                noted under condition 6 of the current development approval (2005/638), the
                applicant is required to ensure a Bushfire Management Plan has been prepared for the
                site by suitably qualified expert to ensure the risk from bushfire is minimised and
                managed.
           •    Flood hazard - while the subject land is subject to flood inundation during a Q100
                event, the proposed development is for an expansion of the existing constructed pad
                area and new HES Basin, to replace the existing centrally located HES Basin. The Council
                is to implement a new Stormwater Management Plan, which is to minimise
                environmental impacts. The hydraulic engineer has confirmed there is a re-distribution
                of floodwaters in the floodplain downstream of the filling however there are no adverse
                impacts that are likely to affect any infrastructure on the site or the surrounding area.

           •    Landslide hazard - while part of the land is affected by the landslide overlay, the subject
                land where the proposed expansion of the RRA is not affected.

       The proposed development either complies with or can be conditioned to comply with the
       relevant overlay codes.

       Community Facilities Zone Code




       22019 – Noosa Council Expansion of Landfill, November 2023                          Page 30

Page 31

“Specialist services and practical solutions”



       Under the purpose of the Community Facilities Zone Code at (1), it is stated the Community
       Facilities Zone is to provide for community related uses, activities and facilities whether publicly
       or privately owned including utility installations, which is the case here.

       Under the overall outcomes (2), at (a) it is stated the Community Facilities Zone is to primarily
       accommodate a variety of community related activities and infrastructure to meet the current
       and future needs of the community, which is the case here. The subject land has been
       designated as a landfill site for many years with the existing facility commencing in about 2006.
       Consequently, in accordance with OO(b) the development is consistent with the continued use
       of community land for the specific purpose annotated on the zone map.

       It is noted that despite the Community Facilities Zone extending over a large portion of Lot 77
       (this being the main land parcel), it is only the land towards the southwest that is currently
       used for landfill. While the existing landfill is also over a relatively large area of land comprising
       about 49ha, in comparison to the area of land included within the Community Facilities Zone
       (about 200ha) this is about one quarter of the land originally designated for this purpose.

       The use of the subject land for this purpose is a logical extension given the significant need
       that has been identified to increase the RRA. This will improve the current operation of the
       existing landfill with improved safety being a priority and improved stormwater management
       with the addition of a new and relocated HES Basin.

       The proposed development under the change is entirely consistent with overall outcome (d)
       being for an expansion of the existing landfill. Further, is consistent with overall outcome (k)
       which seeks to ensure infrastructure including utility installations develop where there is an
       identified community need and level of provision is commensurate with the service demands
       generated by the use.

       In particular, the proposed development is consistent with overall outcome (p) being for an
       infrastructure activity that will result in better safety for the general public and the utility of the
       land, which are the primary reasons for the proposed expansion. Further, consistent with
       overall outcome (s) the proposed development is of a scale, appearance and intensity that is
       compatible with the existing development and will not cause any adverse impacts off the site
       or affect adjoining land uses.

       It is accepted under overall outcome (t) that the proposed development will result in the
       removal of remanent vegetation that has some ecologically value; however, in this case, this
       cannot be avoided. Despite this, the applicant’s ecologist has confirmed the removal of this
       vegetation will not have a significant residual impact, subject to mitigation measures identified
       being implemented. Further, it is intended to provide environmental offset within the site that
       will ultimately have the same regional ecosystem values.

       With respect to the relevant performance outcomes the following comments are made:
          • PO1 - the proposed development is consistent with the performance outcome given
              the proposed development is providing for an infrastructure activity within the
              Community Facility Zone;




       22019 – Noosa Council Expansion of Landfill, November 2023                             Page 31

Page 32

“Specialist services and practical solutions”



           •    PO2 - the proposed development will provide for a community related purpose being
                an expansion of the existing landfill (utility installation);
           •    PO3 - the proposed development is entirely consistent with the specific purpose
                annotated on zone map;
           •    PO4 – the subject land is on a site and location that is accessible and suitable for the
                intended use and the population catchment it serves; and
           •    PO5 - the proposed expansion of the utility installation is of a scale and an intensity
                that is entirely consistent with community needs, locational characteristics and
                supporting infrastructure that already exists onsite, and as intended under the planning
                scheme.

       With respect to the other performance outcomes these are not relevant to the assessment
       given no building works are being proposed (Built Form – Table 6.8.1.3). Further, the
       development is for an extension of the existing RRA within the existing landfill site and is not
       visible from the road frontage (Safety and Amenity – Table 6.8.1.3).

       The proposed development is consistent with the Community Facilities Zone Code and
       represents a logical extension to the existing landfill in the circumstances, being in response
       to an identified need, which is anticipated under the planning scheme. It is accepted the
       proposed development will have some impact on the environmental values on this part of the
       land; however, this cannot be avoided and subject to the implementation of mitigation
       measures will not result in a significant residual impact being caused.

       Infrastructure Activities Code
       Under part (1) purpose of the Infrastructure Activities Code, major utilities such as the existing
       landfill are to be provided in a coordinated and efficient way to meet the needs of existing and
       future communities. Further, are to be developed and designed in a manner which causes no
       adverse effects on public health, the environment and the amenity of surrounding premises
       and local communities.

       In this case, the proposed development utilises land that is currently bounded by the existing
       landfill, to meet an identified need, and will maximise the efficiency of existing infrastructure.
       While the impact upon the environmental values has been minimised, in this case, it cannot
       be avoided, as discussed above.

       Under part (2), the overall outcomes intend that residents and visitors have access to adequate
       levels of infrastructure to meet the needs of existing and future communities, which is the case
       here (OO(a)). Infrastructure activities are to be visually integrated in their natural setting and
       not be visible from the major road network, which is also the case here (OO(b)).

       In particular, it is intended to increase the size of the RRA to provide for increased public safety
       consistent with overall outcome (c). The expansion of the RRA is integrated with the existing
       landfill and other facilities (Cleanaway Depot) consistent with overall outcome (d). Further, the
       proposed access to the existing landfill is not being changed, with no increase in the expected
       number of residents using the utility installation as a result of the change (OO(e)).




       22019 – Noosa Council Expansion of Landfill, November 2023                          Page 32

Page 33

“Specialist services and practical solutions”



       With respect to the most relevant performance outcomes, the following comments are
       provided:
          • PO1 - the proposed infrastructure is to be provided in a location that is relative to
              existing infrastructure. Further, provides opportunities for cost efficiencies and
              minimises the environmental impact when considering site as a whole and the location
              of the existing landfill in the southwest corner of the land, and in particular, the edge
              effects already being experienced by existing infrastructure adjoining the subject land.
              The location makes for a logical extension to the existing RRA in the circumstances;
          • PO2 - there is sufficient separation between adjoining land uses with the development
              wholly contained within a smaller part of Lot 77 and well removed from urban uses, as
              planned; and
          • PO3 – the proposed expansion of the RRA will have no impact on adjoining premises
              or scenic amenity, with the existing landfill and including the change, being mostly not
              visible from the Eumundi-Noosa Road. It is noted the proposed offset area to the south
              of the site (refer Attachment 8) is in an area that has been cleared previously, and
              once rehabilitated, will provide for additional screening to the landfill to the south
              abutting Emu Mountain Road, which is desirable.

       With respect to the design requirements (Table 9.3.11.3) under performance outcomes PO4 to
       PO9, these are not relevant to the assessment.

       With respect to safety and security (Table 9.3.11.3) the proposed additional infrastructure will
       not cause adverse emissions or environmental nuisance in accordance with performance
       outcome PO10. Further, will not cause an unacceptable risk to public safety and in fact is being
       proposed to improve the level of safety within the RRA by creating a greater amount of
       separation and better access between recoverables for the existing landfill operation
       consistent with performance outcome PO11.

       With respect to environmental management (Table 9.3.11.3) in particular performance
       outcome PO13, the proposed development will have some impact on biodiversity values;
       however, this cannot be avoided and is to be mitigated so as to not have a significant impact.

       With respect to environment and heritage (Table 9.3.8.3), the existing landfill, including the
       proposed expansion is currently and will be conducted in an environmentally responsible
       manner without causing deleterious impacts on the environmental values outside of the
       existing footprint, consistent with the current environmental authority for the landfill operation
       (PO14). Further, the proposed development will ensure public safety and the environment are
       not adversely affected by avoiding the release of hazardous materials into flood waters, with
       the operation to be managed in accordance with the environmental authority (PO15). The
       development is to be undertaken in accordance with a new and improved Stormwater
       Management Plan (SWMP) including the construction of a new HES Basin.

       The proposed development is consistent with the Infrastructure Activities Code, subject to the
       implementation of the environmental mitigation measures identified.




       22019 – Noosa Council Expansion of Landfill, November 2023                        Page 33

Page 34

“Specialist services and practical solutions”



       Works Codes

       With respect to the most applicable works codes the following comments are made:
          • Driveways and parking code - Under table 9.4.1.4, minimum parking requirements for
              a utility installation is to provide sufficient parking for the intended use. While there is
              an expansion of the existing landfill, given the nature of the use this does not cause an
              increase in traffic movements or an added demand for parking.
          • Earthworks code - the proposed development will require substantial earthworks for
              the pad extension for the RRA, to be designed and certified by an RPEQ. The proposed
              earthworks will meet the overall outcomes in terms of being designed and constructed
              to be structurally sound (a), will provide for land stability (b), will avoid contamination
              of the land (c) and flooding and drainage has been appropriately addressed in the
              SWMP for the site (d). The existing native vegetation on the subject land is to be
              removed, which cannot be avoided.
          • Water quality and drainage code - the matter of water quality and stormwater drainage
              forms part of the updated SWMP. The SWMP has been prepared in accordance with
              the following documents:
                  o Guideline Stormwater and environmentally relevant activities (DES, 2021)
                  o Best Practice Erosion and Sediment Control (IECA, 2008), and
                  o Queensland Urban Drainage Manual (QUDM) (IPWEAQ, 2016).
              Further, the SWMP has been prepared to meet current licence conditions and water
              quality objectives for the operation of the landfill under the relevant environmental
              authority permit (EPP01855314), being for:
                  o ERA 33 – Crushing, milling, grinding or screening > 5000t per year; and
                  o ERA 60-(1a) – Waste disposal facility < 50,000t/yr.

       The proposed development either complies with the works codes or can be conditioned to
       comply.


       Conditions of Approval

       It is reasonably expected the current development approval will be amended to update any
       conditions of approval including reference to the new Master Plan for the subject site
       (Attachment 4). Any conditions imposed are to be in keeping with the context of the current
       development approval having regard to the proposed expansion of the RRA. Further, it is
       expected that the construction of the expanded RRA and the relocation and enlargement of
       the HES Basin would be subject to an operation works application, with the development being
       designed and certified by an RPEQ.

       It is necessary for the current conditions imposed by the concurrence agency with respect to
       the provision of an environmental offset also be amended. In particular, it will be necessary for
       Permit A to be amended to reflect the expansion of the RRA (Attachment 2B). To that end, it
       is expected conditions 2.1, 2.2, 2.3 and 2.8 would need to be amended accordingly.




       22019 – Noosa Council Expansion of Landfill, November 2023                         Page 34

Page 35

“Specialist services and practical solutions”



       Importantly, it will be necessary to amend condition 2.9 to reflect the current properties where
       the environmental offset has been provided within the Lake Macdonald catchment area, as
       required for the removal of regulated vegetation for the existing landfill within 20 years.
       Consequently, the restoration offset is to be provided by 2026.

       In accordance with condition 2.9 the Council has prepared an Offset Restoration Plan (ORP),
       which provides for an environmental offset for the required minimum 24ha of vegetation,
       comprising 19ha of a remnant “endangered” regional ecosystem and the establishment of a
       minimum of 5ha of a remnant “not of concern” regional ecosystem.

       The ecological consultant (Native Foresters) has undertaken a regional ecosystem assessment
       of the offset areas provided, which is provided as Attachment 3. Consequently, it is not the
       case that the condition has not been complied with, with the ongoing restoration of land
       around Lake Macdonald having reached an advanced stage; however, the land properties
       referred to in the condition have changed as has the tenure of this land (as explained above).

       The aim of the ORP was to achieve remnant status of a minimum of 24ha of vegetation in
       terms of canopy height and cover, and species composition by June 2026. This included 19ha
       of “Endangered” listed Regional Ecosystems (RE) 12.3.1 and 5ha of “Of Concern” RE 12.3.2.
       Noosa Council has also aimed to restore up to 11.1ha of additional; “Least Concern” RE 12.3.11.
       The required vegetation communities are summarised in Table 1 (Attachment 3)15. In
       accordance with Table 1, the total area of land to be offset is therefore 39.1 hectares.

       In order to remedy the change in tenure and ensure the long term protection of the land being
       restored and offset, a PMAV has been agreed between Council and SEQ Water. A request for
       a PMAV has been submitted to the State to ensure the protection of the environmental offset
       in the long term. Consequently, the Council has complied with the current condition of
       approval, which should be amended to reflect the current and proposed offset arrangement
       under the change being sought.

       There is no material change in the traffic movements to and from the site as a result of the
       proposed change. The current access arrangements are adequate for the continued operation
       of the existing landfill, including the change.


       Conclusion

       The proposed development seeks to expand the existing landfill over the subject land to
       increase the RRA in response to an identified community and planning need.

       This additional land will provide for a larger pad area, which adjoins the current operation.
       Further, provides for a greater amount of separation between disposal activities, which will
       substantially improve safety for the public and the risk from fire, while also making use of
       existing infrastructure to improve efficiencies. The new HES Basin will adjoin the northern


       15 Regional Ecosystem Assessment, Noosa Council Offset Site, Lake Macdonald, page 6




       22019 – Noosa Council Expansion of Landfill, November 2023                            Page 35

Page 36

“Specialist services and practical solutions”



       extent of the current landfill operation providing for more operational space within the site
       and improving environmental outcomes and flood resilience.

       The proposed development will result in the removal of regulated vegetation, which cannot
       be avoided. Further, is a logical extension to the existing landfill operation in the circumstances,
       being a finger of vegetation that protrudes into the existing landfill and is suffering from edge
       effects. The loss of vegetation needs to be considered in context with the large portion of land
       (Lot 77 - about 200ha), which is to be mostly protected as a nature reserve, despite the current
       zoning for a community purpose.

       The proposed development should be approved subject to reasonable and relevant
       conditions, given the demonstrated need and the environmental offset being provided.




       22019 – Noosa Council Expansion of Landfill, November 2023                          Page 36

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.