Town Planning Report - Expansion to Noosa Landfill

of 36

Page text shows just the words. Original shows the document exactly as it was published.

“Specialist services and practical solutions”




       Figure 4 – Extract of Master Plan

       Under the Master Plan, the subject land will provide much needed land for the existing RRA
       operation, by allowing for greater separation within the working area, which is accessed by the
       general public to dump steel, concrete and vegetation amongst other materials into separate
       and distinct areas. Heavy machinery is regularly used in this part of the site to push and
       manage the waste, which is currently a high risk operation because of the restricted and limited
       space. There is currently a real need to actively manage this part of the operation to reduce
       the safety risk by using spotters at busy times, increasing the cost to the general community.

       The works to be undertaken within the RRA will provide for the construction of a new HES
       Basin and facilitate the removal/filling of the existing basin to provide a larger constructed
       resource recovery pad area as shown in Figure 4. No other structures are proposed within the
       subject area, including any buildings that might be subject to the exempt clearing provisions
       under the Planning Regulation 2017.


       Need

       The applicant has identified that there is a real and pressing need to expand the existing landfill
       site for many reasons, which are discussed below.

       In terms of providing some context, an expansion to the existing landfill site occurred in about
       2005 and occupies a portion of the land (Lot 77), this being about 49ha, with Lot 77 as a whole
       having an overall area of 322ha. This land has always been intended for a community purpose;
       however, it is acknowledged that most of the land has ecological value.




       22019 – Noosa Council Expansion of Landfill, November 2023                         Page 14
Log in to download the original file

Town Planning Report - Expansion to Noosa Landfill.pdf · 3.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.