Skip to the record
Every meeting, every word.

Original source · versioned page text

2020-07-10 SM Agenda - Item 4 - Attachment 1 - Level of Service Catalogue 20-21

of 177

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

    KEY SERVICE METRICS
    Measure                                                Metric              Benchmark Comparison
    Coastal Management Plan will inform metrics once       In development      In development
    adopted



    PERFORMANCE MEASURE
    Service           Indicator                Performance Measure           Methodology
    Beaches & Coastal In development           In development                Coastal Management Plan will
    Foreshores                                                               inform once adopted



1
  Refer to Asset Responsibility Matrix for specific areas of responsibility
2
  Source asset management system Oct 2017
3
  Source asset management system Oct 2017 (data subject to further validation)
4
  Source Recurrent Maintenance Manual
5
  Source Recurrent Maintenance Manual
6
  Under contract – inspection responsibilities rest with contractor
7
  Works are prioritised and subject to available budget.
8
  Contracted dated 12 August 2008 with Slurry Systems Marine Pty Ltd. (15 year term commencing from date of
  commissioning of system)
9
  Reactive maintenance requests are assessed as to warrant for work and available budget – emergencies responded
  to same day.
10
   Source Recurrent Maintenance Manual
11
   Source Cleaning of Public Open Spaces & Amenities Contract 1617T113
12
   Schedule A - from Noosa Surf Club, north to the middle groyne, approximately 700m length of beach; then from
  middle groyne north to Noosa River mouth, approximately 680m length of beach.
13
   Schedule B - Peregian Beach from beach access #67 Pitta Street north to access #47, Tristania Drive at Marcus
  Beach, approximately 4.7km length of beach. Sunshine Beach from the rocks at Sunshine Beach (North) to access
  #47 at Marcus Beach, approximately 6.9km length of beach.
14
   Same as note 8
15
   A separate reactive and specifically tailored program commences upon any major health risk (e.g. major flooding or
  sewer overflow)




                                                                                                     Page 10
Log in to download the original file

2020-07-10 SM Agenda - Item 4 - Attachment 1 - Level of Service Catalogue 20-21(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.