Original source · versioned page text
2503-45382 SRA - Information request (1)
2503-45382 SRA
Recovery Centre Expansion. The clearing of Category X vegetation on Site A does not
require assessment under the Planning Regulation 2017 and the Vegetation Management
Act 1999’. This statement is incorrect, as a material change of use application includes
assessment of clearing as a result of the material change of use, as per the definition
found in SDAP State Code 16: Native Vegetation. Assessable clearing includes clearing of
vegetation that will become exempt clearing work if the development application is
approved.
The clearing as a result of the development will include essential management exemptions
that will become available once the development is approved, and this includes clearing for
firebreaks and safety buffers adjoining proposed infrastructure (other than fences, roads
and underground services) for a distance of 20m or 1.5 times the height of the tallest
adjacent trees. This also includes clearing to establish a necessary fence, if the maximum
width of the clearing for the fence is 10m.
Furthermore, the application material does not include any tree height data. If no tree height
data is provided, the assessable clearing for this development is calculated using the
Technical Description report for South-East Queensland for regional ecosystem 12.5.3
which states a maximum tree canopy height of 30m, which when multiplied by 1.5, results in
a firebreak width of 45m from the proposed building envelopes.
Action:
Provide digital data that shows all new and relocated infrastructure within 45m of
the category B vegetation, and all new fences located within 5m of the category B
vegetation. Digital data should include a projected spatial reference (e.g. GDA94 or
GDA2020) and preferably be in an ESRI compatible format (shapefile,
geodatabase or KML).
Please note: DWG and CAD drawing files are not sufficient as they are
incompatible with ESRI spatial products.
Provide tree height measurements for the tallest trees in category B areas adjacent
to proposed infrastructure to identify the assessable clearing. Data to be provided
to determine accurate tree heights should include pictures of the trees adjacent to
the proposed infrastructure with an object of known height (survey staff) along with
GPS coordinates identifying the exact location of the measured tree.
If digital data confirms that vegetation clearing in category B is necessary for
essential management. Specifically, a response to PO1-PO3 and PO4-
PO18 of state code 16 will be required.
How to respond
You have three months to respond to this request and the due date to SARA is 26 August 2025.
You may respond by providing either: (a) all of the information requested; (b) part of the information
requested; or (c) a notice that none of the information will be provided. Further guidance on responding to
an information request is provided in section 13 of the Development Assessment Rules (DA Rules).
State Assessment and Referral Agency Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original