ORDINARY MEETING AGENDA 1 MAY 2014
5 CONSIDERATION OF COMMITTEE RECOMMENDATIONS
GENERAL COMMITTEE RECOMMENDATIONS
28 APRIL 2014 – Crs Tony Wellington (Chair), Bob Abbot, Sandy Bolton, Joe Jurisevic,
Frank Pardon, Noel Playford, Frank Wilkie
1 WASTE STRATEGY OPTIONS DEVELOPMENT – PROJECT PLAN
That Council note the report from the Manager Waste and Environmental Health to the
General Committee Meeting dated 28 April 2014 and
A. Note the report from Lloyd Consulting titled “Noosa Council Waste Options
Development Project Plan”; and
B. Authorise the CEO to release a tender and engage a suitable consultant to
investigate and report on the themes identified in report by Lloyd Consulting.
2 PRE-RESPONSE REQUEST TO CHANGE CONDITIONS OF PLANNING &
ENVIRONMENT COURT ORDER (318/2008) FOR A DEVELOPMENT PERMIT FOR A
MATERIAL CHANGE OF USE FOR A RESOURCE BASED SPRING WATER BOTTLING
PLANT (COOROY MOUNTAIN SPRING WATER) AT 314 COOROY MOUNTAIN RD,
COOROY MOUNTAIN
That Council agree in part to the pre-response request to change Planning & Environment
Court Order 318 of 2008 (Application No.132006.268.02), situated at 314 Cooroy Mountain
Road, Cooroy Mountain, in accordance with the following details:
A. Agree to delete conditions 5B, 5G & 18B;
B. Agree to change conditions 5C, 5E, 5F, 8, 9, 13 & 18A to read:
5C. Trucks attending the site must not exceed a total of 8 trucks per day and must
not include B-Doubles.
5E. The hours of operation for the use are limited to 6:00am to 6:00pm Monday to
Friday.
5F. A maximum of 12 staff (including drivers) are permitted on the premises during
the hours of operation and are not permitted prior to 6:00am.
8. The existing site access shall be upgraded. The works must be undertaken as
part of an Operational Works application and include the following:
(a) Design and construction generally in accordance with Council’s Standard
Drawing No SEQ R-056.
(b) The clearing of vegetation in the road reserve as described in the
submitted Traffic Impact Assessment prepared by RoadPro Development
dated 11 December 2013.
(c) Any other clearing necessary to provide the “Safe Sight Distance” as
indicated on Council’s Standard Drawing No SEQ R-056.
Page 4 of 16