Council archive · source document
Appendix G - Council Code Responses · MCU22/0051
Acid Sulphate Soils Overlay
Performance outcomes Acceptable outcomes Solution Comments
Table 8.2.1.3 - Criteria for assessable development
Avoidance and management of ASS
PO1 AO1.1 Complies
Development: The disturbance of ASS is avoided by: Acceptable outcome An Acid Sulfate Soils Management plan can be
a. does not disturb ASS; or a. undertaking an ASS investigation and soil implemented for any earthworks if required as a
b. is managed to avoid or minimise the release of analysis according to the National Acid condition of approval .
acid and metal contaminants, where Sulfate Soils Guidance;
disturbance of ASS is unavoidable. b. not excavating or otherwise removing soil or
sediment containing ASS;
c. not permanently or temporarily extracting
groundwater that results in the aeration of
previously saturated ASS; and
d. not undertaking filling on land at or below 5
metres AHD that results in:-
i. actual ASS being moved below the
water table; or
ii. previously saturated ASS being aerated.
Editor's note—National Sampling and
Identification Methods Guidelines is a reference
to:
a. National Acid Sulfate Soils Guidance:
National acid sulfate soils sampling and
identification methods manual, Department
of Agriculture and Water Resources,
Canberra (Sullivan et al, 2018); and
b. National Acid Sulfate Soils Guidance:
National Acid Sulfate Soils Identification
and Laboratory Methods Manual,
Department of Agriculture and Water
Resources, Canberra; and
c. the Australian Standard 4969.
Current as at 31 July 2020 Noosa Plan 2020
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix G - Council Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 834 KB (small file)
- File type
No other editions are linked here.