Council archive · source document
Decision Notice - 010.2007.00002238.001 [As Published] · 132007.2238
2007/2238
Q107632 2 Site Elevation – Larkin Teys Consulting Pty Ltd 7 May 2008
Q107632 1 Site Plan for Lease Purposes – Larkin Teys -
Consulting Pty Ltd
and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
the premises being occupied and maintained at all times thereafter.
4. Existing trees on the site and within road reserves shall be retained.
5. The development shall not exceed a maximum height of 25 metres above natural and finished
ground level.
6. The development shall comprise a ‘pale eucalypt’ colour scheme to assist in its integration with
the surrounding landscape.
7. The Development Permit for a material change of use of premises lapses if the use has not
happened by 13 November 2012 unless an application to extend the currency is approved by
Council.
Land Development
Vehicle Access
8. Vehicular access to the facility shall be from Cooyar Street only.
Erosion and Sediment Control
9. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted as part of any application for a Development Permit for Building Works.
Contributions Towards Council Infrastructure
10. Monetary contributions shall be paid to Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the
contribution amounts under the current Council policies and requirements is outlined in the
table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $193
PSP20 – Pathway Trunk Network Contributions $243
TOTAL Contribution Amount = $436
Please note, that these amounts are all subject to variations in the Consumer Price
Index, All Groups Brisbane from June 2008 until the date of payment.
All contributions must be paid prior to the issue of a commencement of the use.
Page 2 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002238.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 157 KB (small file)
- File type
No other editions are linked here.