Original source · versioned page text
8. Engineering Report and Plans
The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 54, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Tile No: 1
WARNING: This document is confidential and may also be privileged. Confidentiality nor privilege is not waived or destroyed by virtue of it being
transmitted to an incorrect addressee. Unauthorised use of the contents is therefore strictly prohibited. Any information contained in this
document that has been extracted from our records is believed to be accurate, but no responsibility is assumed for any error or omission.
Optus Plans and information supplied are valid for 30 days from the date of issue. If this timeline has elapsed, please raise a new enquiry.
Sequence Number: 206354844 Date Generated: 15 Dec 2021
For all Optus DBYD plan enquiries –
Email: [email protected]
For urgent onsite assistance contact 1800 505 777
Optus Limited ACN 052 833 208
Plans generated 15 Dec 2021 by Pelicancorp TicketAccess Software | www.pelicancorp.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.