Original source · versioned page text
Information Request Response_OPW24-0142 17092025
Figure 2: Proposed Minor adjustments to Staging
Importantly, the overall intent and sequence of delivery remains consistent with the higher order
approval, with the following key observations provided:
• Driveway and Access: It continued to be intended that the main driveway will be constructed
in accordance with required civil engineering specifications and staged to suite project
delivery. This ensures compliance with Council’s requirements for safe and orderly access to
each stage of the proposed development;
• Carparking: appropriate allocation of sealed carparking will be provided for each stage, with
clear allocation for client, visitor and accessible (PWD) spaces. The total parking provisions
with the proposed amended staging matches the scale of development at each stage;
• Bushfire Setbacks: it continued to be intended that a 10m bushfire risk setback (hatched) will
be provided in accordance with Council’s bushfire management requirements;
• Stormwater and Wastewater: Vegetated swales, water storage to each tent, and staged
upgrades to the EP20 wastewater treatment plant are included, demonstrating compliance
with water quality and environmental protection standards;
• Tourist Villas/Glamping Tents: The number, location, and maximum size of tourist villas
remains the same, with no intensification beyond what was approved;
• Ancillary Facilities: Manager’s residence, pool, BBQ pavilion, bin enclosure, and internal
pathways continued to be intended and staged appropriately
P: 07 5452 5207
E: [email protected]
Level 1, 9 First Avenue, Maroochydore Qld 4558
PO Box 1043 Maroochydore Q 4558
Page 5 of 8 innovativeplanningsolutions.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.