24-7-19 Attachment F Rev Stormwater Mgmt Plan
The original of this document is very large (22.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn18 July 2019
Existing Discharge Proposed Discharge
ARI Year
From Site (m3/sec) From Site (m3/sec)
2 0.196 0.192
5 0.271 0.249
10 0.310 0.306
20 0.359 0.355
50 0.390 0.369
100 0.435 0.413
Table 1 – Existing and Developed Peak Flows
5.3.3 Stormwater Quality Management Strategy
In order to satisfy the requirements of the State Planning Policy July 2017 for the adequate
treatment of stormwater runoff, natural treatment solutions have been provided to remove
hydrocarbons, suspended solids and nutrients prior to being discharged from site.
5.3.3.1 Potential Pollutants Generated
The pollutants that could be potentially generated as a result of the development use are as
follows:
Litter
Sediment
Nutrients (Nitrogen and Phosphorous)
Hydrocarbons (oils and grease)
Surfactants
Pathogens/Faecal Coliforms (bacteria and viruses)
The MUSIC computer modelling program developed by the Co-operative Research Centre for
Catchment Hydrology was used to predict the performance of the proposed stormwater treatment
train.
At this stage the pollutants modelled in MUSIC are Total Suspended Solids (TSS), Total
Phosphorous (TP) and Total Nitrogen (TN).
5.3.3.2 Rainfall
The rainfall data used in the model was based on the Bureau of Meteorology data from rainfall
station 40059 Cooroy Composite. The model was run for a 10-year period from 1 January 1973 to
31 December 1983. The modelling time step was 6 minutes.
5.3.3.3 Rainfall Runoff Properties
Excellence with Economy in Engineering 10
l:\7000-7999\7700-7799\7700\reports\18-07-19 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.