Land Use – Commercial Log10 TSS (mg/L) Log10 TP (mg/L) Log10 TN (mg/L)
Base Storm Base Storm Base Storm
Flow Flow Flow Flow Flow Flow
Roof Mean 0 1.30 0 -0.89 0 0.37
Std. Dev. 0 0.38 0 0.34 0 0.34
Roads Mean 0.78 2.43 -0.6 -0.30 0.32 0.37
Std. Dev. 0.39 0.38 0.5 0.34 0.30 0.34
Ground Mean 0.78 2.16 -0.6 -0.39 0.32 0.37
Level/Open
Space Std. Dev. 0.39 0.38 0.5 0.34 0.30 0.34
Table 3 – Pollutant Export Parameters (Commercial)
5.3.3.5 Water Quality Objectives
The Water Quality Objectives of the receiving waters for the proposed development have been
obtained from State Planning Policy July 2017. The State Planning Policy load reduction targets are
summarised in Table 4 below.
WATER QUALITY OBJECTIVES
Total Suspended Total Litter/Gross
Total Nitrogen
Solids (TSS) % Phosphorous Pollutants % Oils/Grease
(TN) % Reduction
Reduction (TP) % Reduction Reduction
No visible films or
80 45 60 90
odours
Table 4 – Water Quality Objectives
5.3.3.6 Treatment Plan
In order to achieve the Water Quality Objectives for the proposed development, it is proposed to
use natural treatment methods to treat the runoff prior to discharge from the site.
Stormwater runoff from the roof and suspended carpark will be captured in a new pit and pipe
network which will discharge to a bioretention basin located along the Northern boundary of the
site.
Runoff from the landscape areas at the front of the site will be treated by grassed swales.
Stormwater runoff from the courtyard area and carpark access driveway will bypass treatment.
Treated and detained water will discharge off site via a proposed stormwater connection to the
existing stormwater pits constructed as part of the masterplan ROL.
Excellence with Economy in Engineering 12
l:\7000-7999\7700-7799\7700\reports\18-07-19 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.