24-7-19 Attachment F Rev Stormwater Mgmt Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (22.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
18 July 2019



Land Use – Commercial                    Log10 TSS (mg/L)                   Log10 TP (mg/L)           Log10 TN (mg/L)


                                        Base             Storm             Base          Storm        Base         Storm
                                        Flow              Flow             Flow           Flow        Flow          Flow

Roof                Mean                    0             1.30                0          -0.89         0           0.37

                    Std. Dev.               0             0.38                0           0.34         0           0.34

Roads               Mean                 0.78             2.43              -0.6         -0.30        0.32         0.37

                    Std. Dev.            0.39             0.38              0.5           0.34        0.30         0.34

Ground              Mean                 0.78             2.16              -0.6         -0.39        0.32         0.37
Level/Open
Space               Std. Dev.            0.39             0.38              0.5           0.34        0.30         0.34
                                Table 3 – Pollutant Export Parameters (Commercial)

5.3.3.5 Water Quality Objectives
The Water Quality Objectives of the receiving waters for the proposed development have been
obtained from State Planning Policy July 2017. The State Planning Policy load reduction targets are
summarised in Table 4 below.


                                                WATER QUALITY OBJECTIVES


Total Suspended                                               Total                    Litter/Gross
                              Total Nitrogen
 Solids (TSS) %                                           Phosphorous                  Pollutants %          Oils/Grease
                            (TN) % Reduction
   Reduction                                            (TP) % Reduction                Reduction

                                                                                                       No visible films or
          80                           45                          60                      90
                                                                                                            odours

                               Table 4 – Water Quality Objectives
5.3.3.6 Treatment Plan
In order to achieve the Water Quality Objectives for the proposed development, it is proposed to
use natural treatment methods to treat the runoff prior to discharge from the site.

Stormwater runoff from the roof and suspended carpark will be captured in a new pit and pipe
network which will discharge to a bioretention basin located along the Northern boundary of the
site.

Runoff from the landscape areas at the front of the site will be treated by grassed swales.

Stormwater runoff from the courtyard area and carpark access driveway will bypass treatment.

Treated and detained water will discharge off site via a proposed stormwater connection to the
existing stormwater pits constructed as part of the masterplan ROL.




Excellence with Economy in Engineering                                                                                       12
l:\7000-7999\7700-7799\7700\reports\18-07-19 stormwater management plan_issue d.docx
Log in to download the original file

24-7-19 Attachment F Rev Stormwater Mgmt Plan.pdf · 22.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.