Original source · versioned page text
24-7-19 Attachment F Rev Stormwater Mgmt Plan
The original of this document is very large (22.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn18 July 2019
BIORETENTION BASIN MAINTENANCE CHECKLIST
Inspection Frequency 1 to 6 Monthly Date of Inspection
Location
Description
Asset ID
Site Visit by
Inspection Items Y N Actions Required (Details)
Sediment accumulation at inflow points?
Litter within basin?
Erosion at inlet or other key structures?
Traffic damage present?
Evidence of waste dumping?
Vegetation condition satisfactory (health,
weeds etc)?
Watering of vegetation required?
Replanting required?
Mowing required?
Clogging of drainage points (sediment or debris)?
Evidence of ponding?
Damage/Vandalism to structures present?
Surface clogging visible?
Filling of surface required?
Drainage System inspected?
Resetting of system required?
Excellence with Economy in Engineering 23
l:\7000-7999\7700-7799\7700\reports\18-07-19 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.