24-7-19 Attachment F Rev Stormwater Mgmt Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (22.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
18 July 2019



Table of Figures
Figure 1 – Proposed Development                                                        5
Figure 2 – Site Location                                                               6
Figure 3 – Treatment Plan                                                              13



Table of Tables
Table 1 – Existing and Developed Peak Flows                                            10
Table 2 – MUSIC Rainfall Runoff Parameters (Commercial)                                11
Table 3 – Pollutant Export Parameters (Commercial)                                     12
Table 4 – Water Quality Objectives                                                     12
Table 5 – Percentage Based Load Reduction Results                                      14


Table of Appendices
Appendix 1 Architectural Plans                                                         19
Appendix 2 Site Survey                                                                 20
Appendix 3 Mpn Plans                                                                   21
Appendix 4 Bioretention Basin Maintenance Checklist                                    22




Excellence with Economy in Engineering                                                 4
l:\7000-7999\7700-7799\7700\reports\18-07-19 stormwater management plan_issue d.docx
Log in to download the original file

24-7-19 Attachment F Rev Stormwater Mgmt Plan.pdf · 22.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.