RETAINING WALL TO SIDE
BOUNDARY DOES NOT
REQUIRE PIERS.
STEP FOOTING AS REQUIRED.
3509 x |O00 DEEP MIN. BORED PIERS
@ [500 CRS. MAX. 4/NI2 + RO LIGS
@ 400 CRS. -TYPICAL.
S/R Pm
x Rs 8
© a
|S 0
-
O
3
>
a
O
Edge of Patio 5
Stairs
Lo
[ Stairs
oO
Q
qn
y
Top of Rendered Walt
| ———
Bui lai Ng Above
Tmber
Top of Rock Walt
GENERAL NOTES
SCOPE
Only items specitically detailed on these drawings are
Included In tne engineers responsibility.
These drawings shall be read in conjunction with all
architectural “and other consultants drawings and
specifications. Discrepancies shall be reférred to
the engineer for direction before proceeding with the work.
DIMENSIONS
All dimensions and levels shall be verified by the contractor
before work is commenced. The engineers drawings shall
not be scaled. All dimension in mm Unless Noted Othernise.
DUE CARE
During construction, the contractor/ouilder shall be responsible
For maintaining the structure and all surrounding properties or
bulldings in a Stable condition and ensuring no part nill be
over stressed during construction activities.
WORKMANSHIP
Workmanship and materials are to be in accordance with the
relevant SAA codes (including all amendments) and any
governmental statutory requirements except where varied
the contract documents. Construction is not to commence
until building approval has been granted.
SERVICES
The builder is responsible For locating all existing and nen
services and shall be responsible for any damage to the
same. Any existing or proposed services within 6.0m of the
of the structure to be reported in writing to the engineer
before construction commences.
ARTICULATION OF BRICKWORK
All masonry shall be articulated in accordance with TN6l
(Cement & ‘Concrete Construction.)
BRITTLE FLOOR COVERINGS
Where brittle Floor coverings (such as tiles) are to be used,
extra measures are requiréd to control the effects of
concrete shrinkage. One or more of the Following methods
may be used:
- reinforcement in affected panels to be increased to Fq2.
- a flexible bedding system to be used.
- delay installation of floor coverings.
SITE MAINTENANCE AFTER CONSTRUCTION
The owner Is responsiole For the maintenance of the site
and should be Familiar with the performance and maintenance
requirements set out in the CSIRO publication |O-dl ‘Guide to
Home Owners on Foundation Maintenance and Footing Performance.
LOADBEARING MASONRY NOTES
( EXCLUDING AAC. MASONRY )
CONCRETE
WORKMANSHIP AND MATERIALS.
All workmanship and materials For concrete and
reinforcement shall be in accordance with AS 3600-2001
and associated codes.
CONCRETE STRENGTH FOOTINGS: N20
COVERS UNO.
The minimum cover (in mm) to reinforcement shall
be as follows:
TOP BOTTOM SIDE
FOOTINGS: 30 50 40
REINFORCEMENT
Reinforcement symbols:
N_ - deformed bar to AS/NZS 4671 - 2001
R_ - Plan bar to AS/NZS 4671 - 200!)
RF - Fabric to AS/NZS 4671 - 2001
Welding (apart From tack welding) is not permitted.
All cut bars require an additional bar to be spliced
adjacent to cut bar.
NI2 bars shall have a minimum lap of 450mm
Nié lap - 600.
Trench mesh to have a minimum lap of 500mm.
Reinforcement shall be supported so as not to be
displaced during concreting. Slab mesh to be
supported on bar chairs af |OOOmm centres
both ways.
CONSTRUCTION JOINTS
Construction joints shall be made only where shown on
the drawings or where approved by the engineer.
PENETRATIONS
Condults and cables shall be placed under the top
steel in the middle third of the slabs and beams,
Holes and chases other than those shown shall not
be made in concrete members without prior approval
From the engineer.
FOOTINGS ¢ ON GROUND
GENERAL
Footings and slabs shall be constructed in accordance
with AS 2870.|-20ll.
The builder is responsible for plumbing and drainage in
regard to the footing 5 stem. These details shall be in
accordance with AS 2870,|-20ll.
SLAB ON GROUND
Top soil containing grass roots or other organic material
shall be removed'trom the area on which thé slab is to
rest.
Top Under slab Fill to be clean sand placed in 200 dee
200 SERIES BLOCKWORK A + OF Rock Wal |. All masonry Is to comply with the provisions and loose layers and compacted by copeated rolling wath an
recommendations of the SAA masonry code AS3100-2001 excavator and shall not exceéd 600.
RETAINING WALL AS PER eS tions oF th y ASS ti hall
DETAILS. Ss 2. Masonry units are to have an unconfined compressive New & existing underground trenches to be back filled with
De cle ° a strength (fluc) of 12 MPa or greater and comply with free draining gravel. Builder to ensure see page into trenches
relavant Australian Standards. does not pond over underlying solls.
pep > £ To of 3. Mortar to be class M4 Imported fill under slabs to be granular material or low plasticity
350 W x 500 D “Y fe} clayey gravel fill. Fill to be placed & compacted to 48% standard
x Timber ck Naty aryaereity ratio. In-Situ compaction tests'to be carried out during
STRIP FOOTING 5 B 4, Bed & perpend joints to be mortared across full width construction,
LBTM200 TOP & BIM. _ of brick or full width oF shell For hollow units.
RO LIGS @ 400 CRS. a 5. All joints shall be tooled on external faces. FORMWORK ¢ PROPPING
--—_. 6. Bond pattern to be stretcher bond unless noted otherwise. Formvon Sosation Pos ea num AS 3610 - 2010 and shall
—_ .
J, Where required, hollow masonry units to be Filled with
15 MPa bbck grout! 4 Back prop after removal of of Formwork for 14 days
| — ——- Oe .
° / We 8. Cavity ties to be medium or heavy duty spaced at not rn
1 3 8 0 0 more than 600mm In each direction. (Durability classification R4) No npendedt sec ‘one ener loadin j shall be errected
4. At wall to wall interfaces (eg 'T' intersection), ties and props have been removed from those sections.
”n 1 / 1 S C 8 are to be spaced at an average of 300mm vertically
v t+ (400mm max.) with | row per intersecting leat.
% 2% 2 10, At inter-cavity mullions, ties to be both sides every
x 2 RETAINING WALL PLAN oe
Y — OOO ll. A slip joint using 'Alcor' or similar is to be Formed
between suspended concrete slaos/oeams and the
supporting brickwork under.
“2
SCALE |:100 @ A3 JOB DESCRIPTION DRAWING TITLE
APPROVED NEIL McKENZIE & ASSOCIATES PTY. LTD.
DRAWN DN. PROPOSED NEW RETAINING WALL | FOOTING PLAN ¢ STRUCTURAL NOTES
CONSULTING ENGINEERS 1B ARAKOON CRESCENT
CANAL» 14/699a SANDGATE ROAD CHECKED NM, CUNSHINE BEACH !
iss CLAYFIELD, QLD 4011 DESIGNED NM
MLE. AUST), R.P.E.Q 2097, NP.ERS BHONE: (67) 3862 1886
THIS DRAWING REMAINS THE PROPERTY OF FAX: (07) 3862 1397 APPROVED NM. CUENT DRAWING REVISION
No. |. REVISION DATE | DWN [NEIL McKENZIE [&) ASSOCIATES (©) Copyright EMAIL: [email protected] ONE Ale JOHN JAMESON wuueer QIT-304-0l NUMBER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
ys K——200 SERIES BLOCKWORK L8TM200 TOP & BTM. ROCK FACED a q NI2 @ 400 CRS. se R6 LIES @ 1000 CRS. x= = a NI2 @ 400 CRS. UP TO 1200 RETAINING & 1 T 5 NI2 @ 200 CRS. OVER 1200 RETAINNG © | | : | | 3 a = | | 8 3 | | a 8 \ | LINIO MAX. fF) T T | | | | | | 2 2 | | 3/NI2 'Z' BARS | | 8 R | | | | | | — | ! L8TM200 TOP ¢ BTM. , | RO LIS @ 1000 CRS, 350 LBTM200 TOP & BTM, RO LIGS @ 1000 CRS. 3500 BORED PIERS | | 600 @ |500 CRS. MAX. AINI2 + R6 LIGS @ 400 CRS. a — * BLOCKWWORK & REINFORCING AS PER SECTION A-A 3500 ‘ SCALE 1:20 @ A3 JOB DESCRIPTION DRAWING TITLE PEROD NEI; McKENZIE & ASSOCIATES PTY. U1D.[= T=" Tes, anew cn WN 14/6990 SANDGATE ROAD CHECKED NM. |6 ARAKOON CRESCENT, wie. ws@sePeo 2097, MPERS CLAYFIELD, QLD 4011 DESIGNED —_| NM SUNSHINE BEACH THIS ORAWING EWA NS THE PROPERTY oF PHONE: (07), 3862, 1886 APPROVED NM. CUENT DRAWING REVISION FAX: 07) 3862 1397 IM. No. | REVISION DATE | Dwn NEIL reeds east © Copyright EMAIL: mell@nelinckensie com.au DATE AUG JOHN JAMESON nuuer QIT-304-02 NUMER
Page 3
EXISTING RETAINING WALL ed a a L 4 Z ZZ 4 lo MAX (IN re HE 2 = 4 4 J LIN 10 MA > =F TETETET TETETET HI a = 7 a t Z a t | LIN IO MAX. cH TETETET TATE 2 TA & ES gor wk a L | \\ 3 | a“ TETETET TETETET CE | N B 5 APPROVED i QE 1506 A3 | JOB DESCRPTON DRAWING TITLE NEIL McKENZIE & ASSOCIATES PTY. L1D.[=—[2== Em ccnmowa [Eu WNC en CHECKED | NM. 1@ ARAKOON CRESCENT, 14/699a SANDGATE ROAD wie anh gece 2007 NPERS CLAYFIELD, QLD 4011 DESNED_| NN SUNSHINE BEACH THIS DRAWING (evans THE PROPERTY OF vai OP) “Be 8 ee APPROVED NM. CLIENT DRAWING REVISION REVISION DATE | DWN [NEIL McKENZIEN& ASSOCIATES (€) Copyright EMAIL: [email protected] DATE an JOHN JAMESON vue G@l1-304-03 NUMBER
Used in these records
20180106 - Structural Drawings.pdfRelated documentApplication case desk ↗
About this file
- File size
- 833 KB (small file)
- File type
No other editions are linked here.