                       AGENDA


         General Committee
              Meeting


              Monday, 14 March 2022

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-03-14 General Committee Meeting Agenda(PDF, 2MB).pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 28 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                               14 MARCH 2022




TABLE OF CONTENTS



ITEM                                                                    PAGE

1.     ATTENDANCE & APOLOGIES                                               3

2.     CONFIRMATION OF MINUTES                                              3

3.     PRESENTATIONS                                                        3

4.     DEPUTATIONS                                                          3

5.     ITEMS REFERRED FROM COMMITTEES                                       4

       1   MCU19/0089.02 & OPW19/0160.02 – MINOR CHANGE TO DEVELOPMENT
           APPROVAL FOR RETAIL BUSINESS TYPE 5 VEHICLE USES, RETAIL BUSINESS
           TYPE 2 SHOP AND OPERATIONAL WORKS – SIGNAGE AT 52 – 54 MARY
           STREET NOOSAVILLE                                                4

       2   NOOSA RIVER STAKEHOLDER ADVISORY COMMITTEE UPDATE                 4

6.     REPORTS DIRECT TO GENERAL COMMITTEE                                  5

       3   NOOSA NORTH SHORE FERRY REVIEW AND PROPOSED TENDER                5

       4   FINANCIAL PERFORMANCE REPORT – FEBRUARY 2022                    17

7.     CLOSED SESSION                                                29




                                                                  Page 2 of 29

Section 3

GENERAL COMMITTEE MEETING AGENDA                                          14 MARCH 2022


1.   ATTENDANCE & APOLOGIES




2.   CONFIRMATION OF MINUTES

     The Minutes of the General Committee Meeting held on 14 February 2022 be received and
     confirmed.




3.   PRESENTATIONS

     Nil.




4.   DEPUTATIONS

     Nil.




                                                                             Page 3 of 29

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                14 MARCH 2022


5.   ITEMS REFERRED FROM COMMITTEES


     PLANNING & ENVIRONMENT COMMITTEE


     1     MCU19/0089.02 & OPW19/0160.02 – MINOR CHANGE TO DEVELOPMENT
           APPROVAL FOR RETAIL BUSINESS TYPE 5 VEHICLE USES, RETAIL BUSINESS
           TYPE 2 SHOP AND OPERATIONAL WORKS – SIGNAGE AT 52 – 54 MARY
           STREET NOOSAVILLE
           (Planning & Environment Committee Agenda, 8 March 2022, Item 2, Page 25)
           Reason for referral – for further consideration.



     2     NOOSA RIVER STAKEHOLDER ADVISORY COMMITTEE UPDATE
           (Planning & Environment Committee Agenda, 8 March 2022, Item 4, Page 39)
           Reason for referral – for further consideration.



     SERVICES & ORGANISATION COMMITTEE

     Nil




                                                                                      Page 4 of 29

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                     14 MARCH 2022


6.    REPORTS DIRECT TO GENERAL COMMITTEE


3     NOOSA NORTH SHORE FERRY REVIEW AND PROPOSED TENDER

Author            Property Advisor, Denis Wallace
                  Corporate Services Department

Index             ECM/LEAS13/0040/59.05 Noosa River Ferry Services

Attachments       1.    AEC Review - Extracts of Benchmarked Cable Ferry Services
                  2.    AEC Review - Extract of Operating Models Available to Council
                  3.    AEC Review - Extracts of Recommended Operating Model
                        Opportunities & Risks


EXECUTIVE SUMMARY
This report provides feedback on the outcomes and recommendations of an independent review
of the Noosa North Shore Ferry service operating model. Council commissioned the review by
AEC Group economic consultants to inform its upcoming procurement process for the next service
commencing in 2024 following the expiry of the existing lease. The review benchmarked Noosa’s
existing service against other cable ferry operations in Eastern Australia, indicating it is one of the
most highly patronised and financially sustainable services in the country.
AEC assessed the range of operating models available to Council and recommends two primary
models, which involve the outsourced operation of the service and either Council owned or
contractor owned vessels. Market sounding indicates an active market appears to exist for both
these operating models.
Staff recommend the fully outsourced model is pursued through a new tender, as it retains the
demonstrated financial sustainability strengths of Noosa’s historic model, which have avoided
ratepayer subsidisation. This tender approach will allow competitive market responses from a
range of experience operators having different procurement opportunities for vessels.
A recommended tender process is outlined, which aims to award a contract in late-2022 for the
next service term commencing on July 1, 2024.

RECOMMENDATION
That Council note the report by the Property Advisor to the General Committee Meeting dated 14
March 2022 and agree to proceed to the tender process for a new ferry service to commence in
July 2024, based on the fully outsourced operating model identified as Option 2 and the
recommended tender approach outlined in the report.

REPORT
The purpose of this report is to provide feedback on the outcome of an independent review of the
Noosa North Shore Ferry service model and outline a recommended tender approach to procure
the next ferry service commencing in July 2024.
1.    Background
Council operates the Noosa North Shore Ferry service via a commercial lease agreement currently
held by Noosa North Shore Ferries Pty Ltd (NNSF). The service provides the primary vehicle
access to residents, workers and visitors to the Noosa North Shore.
In April 2019, Council considered a report providing a review of the ferry service and recommending
award of a lease extension available under the agreement with NNSF. Council decided to award

                                                                                         Page 5 of 29

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                14 MARCH 2022


a 3-year extension only at that time, rather the 5-year extension recommended by staff, and
resolved that “the remaining balance 2 year extension period to be further considered prior to the
lease expiry to allow Council to investigate opportunities for digital technology introduction”.
In August 2021 Council considered a report providing an update on the status of digital technology
investigations into opportunities, progress of an independent review of the service and seeking
agreement to award the balance 2-year lease extension to NNSF. Council agreed to award the
extension and NNSF’s lease agreement is now scheduled to expire on 30 June 2024.
2.                       Independent Ferry Review
Economic consultants, AEC Group, were commissioned in mid-2021 to undertake a broad review
of the Noosa North Shore ferry service to inform the upcoming service renewal process. AEC’s
review was completed in February 2022. Key extracts from the review are contained in this report,
and supporting attachments. However, the review in its entirety has not been attached to this report
due to the commercial-in-confidence nature of market responses and financial assessment which
may impact the upcoming service tender process.
AEC’s review addresses:
    The current ferry service model and operating environment
    Benchmarking of 17 existing cable ferry services in Eastern Australia
    Engagement with local stakeholders
    Market sounding of potential service providers
    Financial and non-financial evaluation of potential operating models
    Service level considerations for the future service
    Procurement process considerations and recommendations
Notable findings in the report include:
                        The existing Noosa River service is one of the busiest cable ferry services in Australia (if not
                         the busiest), servicing approximately 300,000 – 400,000 crossings annually. See annual
                         crossing history in Figure 1 below.

                          500,000


                          450,000


                          400,000


                          350,000


                          300,000
     Vehicle Crossings




                          250,000


                          200,000


                          150,000


                          100,000


                           50,000


                               -
                                                                                                                                                  2012/13




                                                                                                                                                                                2015/16




                                                                                                                                                                                                              2018/19
                                    2001/02

                                              2002/03

                                                        2003/04

                                                                  2004/05

                                                                            2005/06

                                                                                      2006/07

                                                                                                2007/08

                                                                                                          2008/09

                                                                                                                    2009/10

                                                                                                                              2010/11

                                                                                                                                        2011/12




                                                                                                                                                            2013/14

                                                                                                                                                                      2014/15




                                                                                                                                                                                          2016/17

                                                                                                                                                                                                    2017/18




                                                                                                                                                                                                                        2019/20

                                                                                                                                                                                                                                  2020/21




                                    Fig. 1 - Annual Vehicle Crossings (excluding freight vehicles)



                                                                                                                                                                                                        Page 6 of 29

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                 14 MARCH 2022


    Noosa’s service appears to be the only double cable ferry service in Australia, with this
     providing carrying capacity, traffic movement and maintenance scheduling advantages.
    Contractual models, crossing fees and carrying capacity vary widely across the
     benchmarked services. Most services are State-run, with only a few run by local
     governments. The majority of services are either heavily or fully taxpayer/ratepayer
     subsidised. Only the Noosa, Daintree and Jardine River services appear to run on cost-
     recovery basis. Extracts of the benchmarked services’ details are included in Attachment 1.
    A number of local governments are actively looking to transfer their ferry operations to State
     Government responsibility.
    The benchmarked operating models are predominantly via contractual agreement, with the
     responsible authority owning the vessel and the contractor operating the service. Only the
     Noosa North Shore and Moggill ferry services involve the contractor owning the vessel/s,
     though the Daintree River service also previously operated in this way.
    Only one benchmarked service provided a priority resident lane, being the Daintree River
     northern approach operated for 3 months of the year. Most services operate with remotely
     operated boom gates, there is limited video monitoring for queuing, payment methods are a
     mix of cash only and EFTPOS, and the majority use payments on-board the vessel.
    Benchmarked services include a range of resident concessions, with Noosa’s level of
     concession one of the highest.
    Stakeholder feedback themes included hours of operation, fees, payment options, crossing
     infrastructure and Cooloola Recreation Area visitation pressures. These inform AEC’s
     service level and procurement recommendations. Some stakeholders requested their
     feedback remain confidential.
    QPWS indicates it is seeking to address sustainable visitation for the Cooloola Recreation
     Area and observed that “peak period loads are where impacts are most evident and potential
     management measures may include influencing a ‘spread’ of total annual visitation to
     transfer a percentage of peak usage to under-utilised times and/or sites”.
    Market sounding indicates an active market appears to exist for both the own-and-operate
     and operate-only contracting models.
Importantly, AEC’s financial modelling points to sufficient revenue and return for the service to
continue to contribute to Council’s general revenue and avoid ratepayer subsidisation under the
recommended operating models, which are discussed further below.
AEC identifies 10 different operating options, being combinations of council-owned and contractor-
owned vessel models under different fee and revenue share arrangements - see extract in
Attachment 2. AEC recommends Council considers two primary models outlined below. An
extract of AEC’s assessment of the associated risks for both options is included as Attachment 3.
Option 1. Council owned and contracted operations under a fixed fee for service plus revenue
share - on the basis that Council has access to cheaper capital to fund the vessel purchases, the
fixed fee component reduces the revenue fluctuation risk for the contractor, and the revenue share
component provides a financial incentive for the contractor to ensure that vehicles are transported
in an expedited and efficient manner.
This option sees Council procure its own vessels and outsource the operation of the service.
Identified strengths are Council’s lower cost of finance and ability to enter into a shorter-term
contract for the operation. Weaknesses of this option are Council’s lack of expertise and capacity
to procure and maintain vessels and the asset management and maintenance imposts that would
transfer to Council for marine infrastructure, which is not an existing area of its core business.
There is also greater potential for less contractor oversight and maintenance of Council-owned
vessels.
Option 2. Contractor owned and operated under a fixed fee for service plus revenue share - on the
basis that Council does not have the capability to design and procure suitable vessels for the

                                                                                     Page 7 of 29

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                        14 MARCH 2022


contractor, the fixed fee component reduces the revenue fluctuation risk for the contractor, and the
revenue share component provides a financial incentive for the contractor to ensure that vehicles
are transported in an expedited and efficient manner.
This option sees the contractor provide its own vessels for it to operate the service, consistent with
Council’s approach for the full history of its involvement in the service. Identified strengths are the
ability to seek timely, competitive market responses for the supply and maintenance of the vessels,
greater contractor oversight of its own ferries and leveraging of available expertise of existing
operators. Weaknesses of this option are the need for longer contract terms, which limit future
contracting alternatives.
Proceeding to a tender for the fully outsourced operating model in Option 2 is recommended by
staff, as it retains the demonstrated strengths of Noosa’s outsourced model, which have avoided
ratepayer subsidisation, and would allow competitive market responses from a range of
experienced operators having different procurement opportunities for new or existing vessels.
A key element to the new service arrangement is adaptability; in particular to accommodate long-
term changes to technology, demand, legislation or environmental conditions. Provisions for future
adaptability are proposed via a draft Service Agreement contract prepared by King and Company
solicitors, which will form part of the tender package.
3.    Recommended Tender Approach
Staff recommend Council proceeds to tender for the fully outsourced service model identified as
Option 2 above. Indicative tender details are proposed as follows:

 Service                                    Supply and Operation of Vehicle Ferries
 Contract Type                              Service Agreement
 Term                                       10 - 20 years
 Option                                     5 years
 Commencement Date                          1 July 2024
 Payment Structure                          Fixed fee + revenue share
 Minimum Vessel Sizes                       2 x 10 vehicle ferries
 Operating Hours                            Per existing times but subject to variation by agreement
                                            should need arise
 Responsibility for Setting Crossing Fees   Council
 and Concessions
 Mandatory Service Components               Electronic payments, Service Plan, Insurances
 Tender Response Period                     3 - 4 months
The Service Plan listed above will be a key tender component requiring submitters to extensively
detail their proposed service provision systems, methods and processes, together with proposed
improvements over the current service. The Service Plan will provide opportunities to identify
market driven innovation and consider new queue management approaches, technology or
infrastructure needs.
Proposed tender assessment weighting criteria are as follows:
 Criteria                                            Weighting
 Price                                                40%
 Service Plan                                         30%
 Track Record and Capacity                            12.5%
 WH&S and Quality Systems                              5%
 Contribution to Local Economy                         5%
 Environment and Sustainability                        7.5%
Timing for the tender is expected to involve:
 Tender release                             May 2022
 Tender close                               August 2022
 Report to Council on the tender outcome    October 2022
 Potential tender award                     November/December 2022

                                                                                            Page 8 of 29

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                   14 MARCH 2022


Given the importance of the contract, staff intend to engage an independent probity advisor to
support and monitor the tender process.
Previous Council Consideration
Ordinary Meeting, 19 August April 2021, Item 6, Page 17
That Council note the report by the Manager Property to the Services & Organisation Committee
Meeting dated 10 August 2021 regarding the Noosa North Shore Ferry lease and:
A.    Agree to award the remaining 2-year lease extension to Noosa North Shore Ferries Pty Ltd;
      and
B.    Agree to consider a further report at Council’s February 2022 round of Council meetings
      regarding proposed ferry service operating models, contractual arrangements and tender
      process for the purpose of proceeding to procure a new ferry service operation commencing
      1 July 2024.
Ordinary Meeting, 18 April 2019, Item 4, Page 11
That Council note the report by the Property Advisor to the Services & Organisation Committee
Meeting dated 9 April 2019 and:
A.    Note the operator’s request for a 5-year extension to the existing ferry lease;
B.    Subject to obtaining the operator’s agreement, agree to only extend the lease for 3 years
      from 1 July 2019 to 30 June 2022 at this time, with the remaining balance 2 year extension
      period to be further considered prior to the lease expiry to allow Council to investigate
      opportunities for digital technology introduction; and
C.    Request staff further investigate opportunities for a simplified concession system, as outlined
      in the report.
Finance
The existing ferry lease agreement with NNSF operates on a revenue share basis and is current
until 30 June 2024. The current service agreement provides a return which contributes to Council’s
general revenue. The service arrangement and fee structures applied by Council has ensured the
ferry service has historically never needed ratepayer subsidisation, with the return achieved
offsetting general rate revenue requirements to support Council in meeting its financial
sustainability targets.
AEC’s financial analysis across a range of modelled scenarios suggests an ongoing ability to
maintain the revenue-positive outcome for the service. Though, given the desired service
improvements sought, such as electronic payment options and queue management, there is
potential for increased contractor costs that would erode current revenue levels. Revenue and
crossing fee implications will be considered as part of the tender assessment process and will be
reported to Council.
Risks & Opportunities
The report seeks a timely Council determination in the lead up to the expiry to the current ferry
lease agreement. The timeline detailed in Section 3 above seeks to allow sufficient time for a
successful tenderer to procure new vessels if required (18 months). There would be risks in the
event of a lapsed agreement or the need to proceed to an alternate procurement process.
The recommended tender process seeks to leverage the expertise of an identified field of potential
tenderers to obtain competitive market responses from experienced operators.
Council is a member of the Teewah Cooloola Working Group, which has sought to address the
issue of sustainable use levels for the area. Potential for future permit limits on Noosa North Shore
visitors are noted in the QPWS feedback above. Under the current lease agreement, such revenue
impacts are predominantly borne by Council. Similarly, the proposed fixed fee component to be
tendered for the new service would be intended to provide financial surety to the contractor.

                                                                                        Page 9 of 29

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                      14 MARCH 2022


Consultation
External Consultation - Community & Stakeholder
AEC Group
King and Company Solicitors
Teewah Landowners Association*
North Shore Residents Association*
Queensland Parks & Wildlife Service*
Beach Road Holiday Homes*
Noosa North Shore Resort*
Noosa North Shore Ferries*
*Via consultant stakeholder engagement
Internal Consultation
Departments/Sections Consulted:

    Chief Executive Officer   X   Community Services                      X   Corporate Services
    Executive Support             Director                                x   Director
                                  Community Development                   x   Financial Services
                                  Community Facilities                        Fleet
                                  Libraries & Galleries                       ICT
                                  Local Laws                              x   Procurement
                              x   Waste & Environmental Health            x   Property
                                                                              Revenue Services

    Executive Services            Environment & Sustainable Development       Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 10 of 29

Section 11

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 11 of 29

GENERAL COMMITTEE MEETING AGENDA                                          14 MARCH 2022

 ATTACHMENT 1. AEC Ferry Review - Extracts of Benchmarked Cable Ferry Services

   Table 3.1. Cabled Service Benchmarking Sample
    Tlie madi)     State Ferry Service  State                 SSPE Ted
   DantesRiver | OLD [Hibbard       | NSW [Spoons          | NSW
   lane Rver   | OLD | Lawence        | NSW [Unmare         | NSW
   Noggil___|     QLD | Lower Poriand | NSW | Webbs Greek   | NSW
   perowra Waters | NSW [worteke     | nw [wisemars         | NSW
   sonbeh Pont  | ASW |Sackilo       | NSW [Wyman          | NSW
   Bune Pont    | NSW | Setomré Point | NSW
   Source. AEC

  Table 3.4. Annual Cabled Service Capacity and Usage
   Ferry Service     Vehicle  Vehicles Notes
                     eT sr-Tel ay
   Noosa North Shore  2x10 | 407,282 | 2020-21
   Daintree River | 27     | 335,946 | Estimate based on 2020-21 ticket sales
  Moggi           | 20 | 180,000 | Estimate based on 500 vehicles per day in 2015-16
   Berowra Waters | 15     | 276,000 | Estimate based on 23,000 vehicles per month
   Bombah Point   | 6 =| na          | Nodata
   Buns Point     ‘| 1 | na. [No dat
   Hibbard        | 15 | na. | Nodata
   Jardine River  | 6 | na. | Nodata
   iawence         [18 | ne            [Noo
   Lower Portland  | 4 | 26,000 | Estimate based on 509 vehicles per week in February 2019
   re
  Sackville       | 15 | 185,000 | Estimate based on more per day than per week for Lower Portland
   Settlement Point | 21   | 450,000 | Estimate provided by Port Macquarie Hastings Council
   speows       ps [na                 [Nadas
   umara        pe [na                 [No
   Webbs Creek    | 24     | ln        No data
  Wisemans         | 24 | na. | Nodata
 wma             p39       [na         [Not
  Source: Consultation with ferry providers, online cata sources

                                                                            Page 11 of 29

Section 12

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 12 of 29

GENERAL COMMITTEE MEETING AGENDA                                                    14 MARCH 2022

  Table 3.5. Ownership and Operating Mode! by Cabled Service
                pomacteenet emmwows                    [ex [ean
  Shore                                                  Fernes Pty Lid       Pty Lid
   Bums Point  | SetfOperated      | Balina Shire Councit__| Ballina Shire Counci__| Balina Shire Counci
   Daintree River | Contractual Agreement _| Douglas Shire Counct | Douglas Shire Counci__| Entrada Travel Group
   sent             [Sometime [Cond                     [Come               [pyle
                                    Council              Council              Pty Lid
   seer        [Stoned             [Rigenacanat        | tapers     Comet | Repora cama
                                    Regional Counci      Regional Council     Regional Council
  Lower Portland | Contractual Agreement | The Hills Shire/ Hawkesbury City Council | Tono Services Pty Lid
                                    Hawkesbury City
                                     Councils
  Scere ron [nent ne               |                    [Con                [pw
                                    Council              Council              Pry Lid
  Beromra Water                                                                Tono Services Ply Lid
   an                                                                          sone
   Lawrence __| Contractual Agreement _| Transport for NSW _| Transport for NSW __| Tono Services Pty Lid
    w=                                                                         =
                                     & Main Roads
  Mortiake                                                                    Macca Ferries Pty Lid
   Sackvite    | Contractual Agreement | Transport for NSW | Transportfor NSW | Tono Services Pty Lid
   =                                                                           —
   Ummarra     | Contractual Agreement | Transpot or NSW | Transport terNSW | Tono Seviees Ply Li
 Webbs Greek   | Contractual Agreement | Transport for NSW | Trareportfor NSW | Tono Services Ply Lid
   Wisemans    | Contractual Agreement | TransportforNSW | Traneportfor NSW  | Tone Services Ply Lid
   a            enone
                                                                              Pty Lid
 Source: NSW Tenderfink, consultation with ferry providers, online data sources

                                                                                       Page 12 of 29

Section 13

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 13 of 29

GENERAL COMMITTEE MEETING AGENDA                                                         14 MARCH 2022

 Table 3.10. Payment Methods by Cabled Service
   Ferry Service      Vetaiis of Payment Methods
   LocalGovernment Authorities
                      * Cash payment only with silver coins not accepted
 Noosa North Shore | Payment is made upon boarding the vessel
                      * Minor tnalling of EFTPOS has been undertaken since 2020
                      « EFTPOS payment only
   5   Point          * EFTPOS payment infrastructure utilising CBA Albert EFTPOS tablets
                      * Payment is made at the ferry cabin after boarding the vessel
                      * Noissues reported with EFTPOS
                      « EFTPOS and cash payments available
                      « Ferry tickets are purchased at the ticket booth on the southem side or on board the ferry
                      © EFTPOS can drop out on the ferry and may take 1-2 minutes per transaction and as such all
  Daintree River        transactions are processed at the ticket booth on the southern side either upon entering or exiting
                        the ferry to avoid delays
                      « All vansactions are processed on board the ferry outside of ticket booth operating hours
                      e Cash p      is are required when the EFTPOS is down
                      « EFTPOS and cash payments available
                      « EFTPOS payment infrastructure utilises Square readers connected to the ferry operator's smart
  Hibbard +             phone — there were concerms with traditional mobile EFTPOS terminals in rain/adverse weather
  Settlement Point      conditions which is why the Square option was selected
                      * Payment is made upon boarding the vessel
                      * 20-30 second  processing time per vehicle for EFTPOS
                      « EFTPOS and oniine payments only
  eee                 * Payment and proof of purchase is provided at the Jardine Ferry Roadhouse prior to boarding
                      « Cash payment only
                      * Payment is made upon boarding the vessel
 Bombah Point         ¢ No reason provided for cash only, but given its location access to existing infrastructure, limited
                       mobile coverage within a national park, and limited patronage and level of service provided may
                        be reasons    EFTPOS is not provided
                      * Bookings not taken as vessel operates as an on-demand service
  Moaaill             « Cash payment only
                      « Payment is made upon boarding the vessel
                      « Contractor was unable to be contacted to provide insight into why the service is cash only
Source: Consullation with ferry providers, online data sources

                                                                                           Page 13 of 29

Section 14

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 14 of 29

GENERAL COMMITTEE MEETING AGENDA                                                        14 MARCH 2022

   ATTACHMENT 2.       AEC Ferry Review — Extract of Operating Models Available to Council

    Table E.1. Available Ferry Service Operating Models
      eee tle eee              Description
     Council Operated with    e Council owns the vessels and associated infrastructure and equipment.
     Own Resources             e Council is responsible for resourcing the service with its own staff.
                              e Council owns the vessels and associated infrastructure and equipment.
             ee                e Council pays the contractor a vanable payment based on a set share of the revenue
                                received from users of the service.
      Cont    10     .         e Council owns the vessels and associated infrastructure and equipment.
     Fixed Fee for Service _  ® Council pays a fixed amount to the contractor for an agreed level of service irrespective of
                                the revenue received.
      Cont    ie     :    ;    ¢ Council owns the vessels and associated infrastructure and equipment.
      Fd tuste Sacintae       e Council pays a tower fixed base amount to the contractor for an agreed level of service,
     Sienna                     plus a variable payment based on a set share of the revenue received from users of the
                                 service,
     Contracted Operations with | « Council owns the vessels and associated infrastructure and equipment.
     Minimum Fee for Service  « Council quarantees the payment of a minimum amount to the contract for an agreed level
     plus Revenue Share         of service, plus a variable payment based on a set share of the revenue received from
     Above a Certain Threshold  users of the service above a certain threshold.
     Fully Outsourced         e Contractor owns the vessels and associated infrastructure and equipment.
     Operation with Fixed     ¢ Contractor sets prices (potentially with set restrictions during the contract term) and pays
     Annual Payment to Council   Council a fixed annual fee.
                              « Contractor owns the vessels and associated infrastructure and equipment.
     Revenue Share            e Council pays the contractor a variable payment based on a set share of the revenue
                                received from users of the service.
                               e Contractor owns the vessels and associated infrastructure and equipment.
      Fixed Fee for Service    e Council pays a fixed amount to the contractor for an agreed level of service irrespective of
                                the revenue received.
                               e Contractor owns the vessels and associated infrastructure and equipment.
     Fixed Fee for Service plus | e Council pays a lower fixed base amount to the contractor for an agreed level of service,
     Revenue Share              plus a variable payment based on a set share of the revenue received from users of the
                                 service.
         5          Servi      e Contractor owns the vessels and associated infrastructure and equipment.
       usin ae                 e Council guarantees the payment of a minimum mount to the contract for an agreed level
     Above @ Carlain Threshold   of service, plus a variable payment based on a set share of the revenue received from
                                users of the service above a certain threshold.
    Source: AEC

                                                                                           Page 14 of 29

Section 15

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 15 of 29

GENERAL COMMITTEE MEETING AGENDA                                                                              14 MARCH 2022

                                ATTACHMENT 3.            AEC Ferry Review — Extract of Recommended Operating Models Opportunities & Risks

    Option 1 — Council Owned Vessels
              NOOSA NORTH SHORE FERRY REVIEW                                                                                                                                   AEC TH
       Model       feyesen tans                                                                       ene                                                                                th) eee
        Contracted Operations with Fixed Fee for Service plus Revenue Share
      Operational/    Council utilises a contractor with the requisite ferry / marine industry experience to Less flexibility to adapt to current and future Council plan and strategy adoption requiring Medium (M32)
      Service         operate the service.                                                              negotiation and potential compensation should contractual requirements not be clear or
      Delivery        Technology improvements to improve the customer experience (EFTPOS, booking       need to be amended.
                      systems, etc.) can be advanced via conditions in the new contract.                Ongoing customer and or political enquiries / complaints relating to the ferry operation. Medium (M28)
                     Council will remain to some extent at arm's length regarding the ferry operation and day-
                      to-day issues.
                      Council can, via conditions in the new contract, ensure the contractor handles the day-
                      to-day customer service enquiries / complaints relating to the ferry operation.
                      Contractor performance monitoring against service benchmarks / KPI's will be able to be
                      conditioned in the new contract.
                     Contractor has a strong incentive to move as many vehicles as possible during the day.
       Govemance/     Procuring a contractor with the required expertise in the marine / ferry regulatory Council does not have the capability to design and procure suitable vessels for the Extreme (E88)
       Legal/         environment and operations will mitigate some legal and regulatory exposure.      contractor.
       Regulatory     Contractor re'ationship management and performance will be guided via the new     Legitimate contractors are dissuaded from tendering under a fixed fee for service plus Medium (M52)
                      contract terms and conditions.                                                    revenue share model given associated financial risks.
                      Council still has an opportunity to undertake business planning to guide future contract Contractual renegotiation and financial compensation associated with potential State High (H72)
                      management performance.                                                           Government imposed permits/restrictions.
                      Ferry marketing and communicaton can be delegated to the contractor via new contract fe Council is exposed to ICT security breaches if technology obligations are not passed on High (H72)
                     conditions.                                                                        to the contractor.
       Human          Council will avoid the need to directly employ and manage staff under existing local Contractor may not be able to find suitable resources.                      Medium (M32)
       =
                      intemal services and Property branch management.
      Financial/      Tendered prices will exclude a commercial return on capital component civen Council The upfront capital investment required in new / upgraded ferry infrastructure results in Medium (M32)
       Economic       would be purchasing lhe ferries.                                                  deferral / delay of olliet priviily projects in Council's capilal plan.
                     Upside revenue fluctuation benefits resulting from increased crossing volumes above Financial exposure from reduced crossing volumes compared to budget forecast,   High (M40)
                     budget forecast will be shared with the contractor, but annual price increases do not including exposure to any State Government imposed permits/restrictions.
                     need to be shared with the contractor if a unit-based system based on the contract year Current fees may nct be sufficient to maintain Council’s retum from the ferry operation High (H60)
                     fees is established (as per the current contract).                                due to increased tender prices and capital costs associated with new ferry acquisitions.
                      Financial efficiencies achieved by the contractor via employing staff under non-local Contractor will tender a revenue share arrangement based on conservative demand High (H60)
                      government awards should be re‘lected in tendered pricing.                        estimates to reduce financial risk over the course of the contract term.
       ~                                                                                                Selatan
                      ensure appropriate asset service levels are maintained.                           management planning, establishment and delivery of annual preventative and reactive
                                                                                                        maintenance regimes, renewals forecasting, etc.).
       5           a                                                                                    ete
      Reputational                                                                                      outcomes and additional Council / Property branch staff pressure and workloads.
                                                                                                                  Page 15 of 29

Section 16

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 16 of 29

GENERAL COMMITTEE MEETING AGENDA                                                                          14 MARCH 2022

 Option 2 — Contractor Owned Vessels
           NOOSA NORTH SHORE FERRY REVIEW                                                                                                                                          3
                                                                                                                                                                            AEC >

    Fixed Fee for Service plus Revenue Share
   Operational/    Council utilises a contractor with the requisite ferry / marine industry experience to Less flexibility to adapt to current and future Council plan and strategy adoption requiring Medium (M32)
   Service        operate the service.                                                              negotiation and potential compensation should contractual requirements not be clear or
    Delivery       Technology improvements to improve the customer experience (EFTPOS, booking       need to be amended.
                   systems, etc.) can be advanced via conditions in the new contract.                Ongoing customer and or political enquiries / complaints relating to the ferry operation. Medium (M28)
                   Council will remain to some extent at arm’s length regarding the ferry operation and day-
                   to-day issues.
                   Council can, via conditions in the new contract, ensure the contractor handles the day-
                   to-day customer service enquiries / complaints relating to the ferry operation.
                   Contractor performance monitoring against service benchmarks / KPI's will be able to be
                   conditioned in the new contract.
   Govemance/      Procuring a contractor with the required expertise in the marine / ferry regulatory Legitimate contractors are dissuaded from tendering under a fixed fee for service plus Medium (M52)
    Legal/         environment and operations will mitigate some legal and regulatory exposure.      revenue share mode! given associated financial risks.
   Regulatory      Contractor relationship management and performance will be guided via the new     Contractual renegotiation and financial compensation associated with potential State High (H72)
                   contract terms and conditions.                                                    Govemment imposed permits/restrictions.
                   Council still has an opportunity to undertake business planning to guide future contract Council is exposed to ICT security breaches if technology obligations are notpassedon —_— High (H72)
                   management performance.                                                           to the contractor.
                   Ferry marketing and communication can be delegated to the contractor via new contract
                   conditions.
    Human          Council will avoid the need to directly employ and manage staff under existing local Contractor may not be able to find suitable resources.                      Medium (M32)
    Resources      govemment awards / Council’s enterprise agreement conditions, reducing pressure on
                   intemal services and Property branch management.
   Financial/     Council will avoid the need for significant upfront capital funding required to procure new Je Financial exposure from reduced crossing volumes compared to budget forecast, High (M40)
    Economic       / upgraded ferry infrastructure (not currently included in 10-year capital investment including exposure to any State Goverment imposed permits/restrictions.
                  forecasts).                                                                        Current fees may not be sufficient to maintain Council's retum from the ferry operation § Extreme (E88)
                  Upside revenue fluctuation benefits resulting from increased crossing volumes above due to increased tender prices and capital costs associated with new ferry acquisitions.
                  budget forecast will be shared with the contractor, but annual price increases do not Contractor will tender a revenue share arrangement based on conservative demand High (H60)
                   fees is established (as per the current contract).
                   Financial efficiencies achieved by the contractor via employing staff under non-local
                   govemment awards should be reflected in tendered pricing.
   Asset           Asset management responsibilities will reside with the contractor.                ‘Asset sweating’ and resulting potential performance failures if contract conditions are High (H72)
                                                                                                     not explicit regarding asset management responsibilities.
   Political/                                                                                        Direct political intervention / adverse decision resulting in sub optimal commercial High (H60)
   Reputational                                                                                      outcomes and additional Council / Property branch staff pressure / workloads.

                                                                                                             Page 16 of 29

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                               14 MARCH 2022


4         FINANCIAL PERFORMANCE REPORT – FEBRUARY 2022

Author                Financial Services Manager (Acting), Pauline Coles
                      Corporate Services Department

Index                 ECM/ Subject / 22.09 – Monthly Financial Performance Report

Attachments           1.       Statement of Income and Expenditure (Profit & Loss and Capital)
                      2.       Statement of Financial Position
                      3.       Statement of Cash Flows
                      4.       Summary of Materials and Services Expenditure


EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 28 February 2022 is positive with
operating revenues outperforming forecast and operating expenditure below budget. The YTD
budget and actual operating position is high reflecting revenue associated with the second annual
rates and charges levied in January. This will degrade through to June as expenditure is incurred
for service delivery. The Capital revenues are in line with forecast with capital expenditure behind
due to the timing of project delivery.

     YTD Financial Performance Summary
                                       Budget            Actual        Variance     Variance
                                                                                                  Status
                                          $m                $m              $m            %
     Operating Revenue                    $97.8           $99.3              $1.6       1.6%     On Track
     Operating Expense                    $70.1           $68.8              $1.3       1.8%     On Track
     Operating Position                   $27.3           $30.5              $3.2      11.6%
     Capital Revenue                      $12.5           $12.8              $0.4       3.1%     On Track
     Capital Expenditure*                 $24.8           $20.6              $4.2      16.9%   Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.

Figure 1: Actual Performance Compared to Budget

 $120
                           $97.8       $99.3
 $100

    $80
                                                                            $70.3    $68.8

    $60

    $40

    $20

     $-
                       Operating Revenue                               Operating Expenditure
                                    YTD Budget ($m)          YTD Actual ($m)


                                                                                                 Page 17 of 29

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                            14 MARCH 2022


Council’s performance against key measures of financial sustainability has been calculated as at
February 2022. These indicators enable the reader to assess Council’s success in managing its
budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                                     Current
                                     Target                          Actual YTD             Status
                                                     Budget
 Operating Surplus Ratio             0-10%            -0.6%             30.8%              On Track
 Net Financial Liabilities Ratio      <60%           -12.7%            -58.2%           Above Target
 Cash Cover Ratio                  3 months         8.8 months      14.2 months         Above Target
 Asset Sustainability Ratio          > 90%           130.1%             51.0%              On Track


RECOMMENDATION
That Council note the report by the Financial Services Manager (Acting) to the General Committee
Meeting dated 14 March 2022 outlining February 2022 year to date financial performance against
budget, including changes to the financial performance report with the inclusion of key financial
sustainability indicators.

REPORT
Operating Revenue (YTD Benchmark 66.67%)
Council has received 91% ($99.3 million) of its operating revenue budget ($109.6 million).
Commentary on each revenue category is provided below.

 Category             Summary                   Comments
 Rates and Levies     $74.9 million (100%)         Waste utility charges $360k above YTD budget
                      of the annual budget          (101.7% or $13.5 million of $13.2 million annual budget
                      of $74.8 million has          earned)
                      been earned                  General rate (net of discounts) $219k below YTD
                                                    budget (99.8% or $56.1 million of $56.2 million annual
                                                    budget earned)
 Fees and             $6.4 million (77%) of        Plumbing application fees $142k above YTD budget
 Charges              the $8.2 million annual       (85.2% or $1.1 million of $1.3 million annual budget
                      budget has been               earned)
                      earned                       Local Laws fees $107k above YTD budget (81% or
                                                    $1.3 million of $1.6 million annual budget earned)
                                                   Property and Facility fees $99k above YTD budget
                                                    (76% or $310k of $408k annual budget earned)
                                                   Development assessment fees $97k above YTD
                                                    budget (73.3% or $1.7 million of $2.4 million annual
                                                    budget earned)
 Sale of Goods        $8.5 million (76%) of        Holiday Park sales $515k above YTD budget (84% or
 and Services         the $11.1 million             $2.6 million of $3.1 million annual budget earned) –
                      annual budget has             Positive revenue variances that hold through the
                      been received                 financial year will be offset in part by additional variable
                                                    operating costs
                                                   Waste management sale of recoverable materials
                                                    $265k above YTD budget (100% or $1.1 million of $1.1
                                                    million annual budget earned)
                                                   Waste disposal fees $63k above YTD budget (67% or
                                                    $2.7 million of $4.0 million annual budget earned)

                                                                                               Page 18 of 29

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                                        14 MARCH 2022


 Category              Summary                     Comments
                                                    Noosa Aquatic Centre revenue $63k above YTD
                                                      budget (71.5% or $1.2 million of $1.7 million annual
                                                      budget earned)
 Interest              $486k (73%) of the                 Interest revenues on cash invested will need ongoing
 Received              $670k annual budget                 monitoring to ensure returns on surplus funds are
                       has been earned                     maximised as investment rates begin to increase.
 Other Revenue         $1.9m (62%) of the                 Waste sulo bin recoveries below YTD budget $88k
                       $3.1 million annual                 (27.8% or $63k of $226k annual budget earned)
                       budget has been                    Holiday Park electricity recoupment below YTD budget
                       earned                              $79k. No revenue recouped YTD due to supplier
                                                           delays from COVID. Installation has now commenced
                                                           and is in implementation phase.
 Operating             $4.2 million (72%) of              Operating grants are in line with budget expectations
 Grants,               the $5.9 million annual             at this stage.
 Subsidies             budget has been                    50% ($1.2 million) of the financial assistance grant was
                       received                            again prepaid in June 2021 and may impact on
                                                           Council’s 2021/22 final operating position if the
                                                           prepayment approach is discontinued by the
                                                           Australian government.
 Unitywater            On track                           Unitywater distributions are fixed each year so little
 Distributions                                             budget variance risk

Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $9.0                                      $8.4
                                     $7.5                                 YTD Budget ($m)
  $8.0
                                                                          YTD Actual ($m)
  $7.0
                $6.4
         $5.8
  $6.0
  $5.0
                                                                                  $4.2 $4.2
  $4.0
                                                                                               $2.9 $2.9
  $3.0
  $2.0
                                                   $1.3 $1.3
                       $0.5 $0.5                                     $0.7 $0.6
  $1.0
  $0.0
                                                       Income
             Charges




                                                                         Other
                                      Goods &




                                                                                      Grants




                                                                                                  Unitywater
                                      Services
                                      Sales of




                                                        Rental
                          Interest
             Fees &




                                                                                                   Share of




Operating Expenditure (YTD Benchmark 66.67%)
Actual operating expenditure is currently 62% ($68.8 million) of full year budget ($110.1 million).
Detailed commentary for each expenditure category is provided below.

 Category              Summary                                   Comments
 Employee Costs        $23.6 million (62%) of the                   YTD under expenditure for permanent staff
                       annual budget of $38.1                        salaries and wages ($2.75 million) due to
                       million has been expended                     position vacancies, partially offset by additional
                                                                     spend on casual staff and external labour hire
                                                                     ($1.1 million).




                                                                                                               Page 19 of 29

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                                                        14 MARCH 2022


 Category                    Summary                                        Comments
 Materials and               $31.3 million (61%) of the                          Environment Services costs $304k below YTD
 Services                    $51.1 million annual budget                          budget (30.9% or $1.1 million of $3.6 million
                             has been expended.                                   annual budget spent) – COVID-19 impacts on
                                                                                  staff have delayed project delivery YTD.
                                                                                 Libraries & Galleries $256k below YTD budget
                                                                                  (47% or $860k of $1.8 million annual budget
                                                                                  spent) – timing of heritage programs and
                                                                                  operational contract services
                                                                                 Waste Management $216k below YTD budget
                                                                                  (62% or $7.1 million of $11.3 million annual
                                                                                  budget spent)
                                                                                 Development Assessment $190k below YTD
                                                                                  budget (48% or $807k of $1.6 million annual
                                                                                  budget spent) – timing of development appeal
                                                                                  costs.
                                                                                 Holiday Parks $446k above YTD budget (89%
                                                                                  or $1.5 million of $1.67 million annual budget
                                                                                  spent) – offset by additional revenue.
 Finance Costs               On track                                       Nil
 Depreciation                On track                                       Nil
 Other Expenses              On track                                       Nil

Figure 3: Operating Expenditure Position by Type

$35.0                              $31.9 $31.2
                                                                                YTD Budget ($m)
$30.0
            $24.5 $23.6                                                         YTD Actual ($m)
$25.0
$20.0
                                                                                       $13.1 $13.1
$15.0
$10.0
 $5.0
                                                        $0.7 $0.7                                            $0.2 $0.1
 $0.0
                                                            Finance Costs
                                        Materials




                                                                                           Depreciation
                 Employees




                                                                                                                Other




Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure at 28 February 2022 is outlined below:
 Expenditure                            Annual Budget                             YTD Budget              YTD Actual       YTD Variance
                                                  $m                                     $m                      $m
 Payment to Tourism Noosa                           $2.52                               $2.52                  $2.52                   -

 Economic Development                               $1.06                               $0.43                  $0.57             ($0.14)

 Total                                              $3.58                               $2.95                  $3.09             ($0.14)

All instalments payable under the Tourism Noosa agreement for the 2021-22 financial year have
been made. Note, the current agreement expires at 30 June 2022 but has been granted a 12
month extension to 30 June 2023.


                                                                                                                         Page 20 of 29

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                                       14 MARCH 2022


YTD Economic Development expenditure is below budget due to lower employee costs ($58k),
due the Branch Manager acting as Director of Environment & Sustainable Development for part of
the financial year. This has also impacted timing for delivery of initiatives under the Local Economic
Plan ($76k).
Tourism and economic development activity is funded through the general rate, with 5.8% of the
annual general rate committed towards tourism and economic development. Should actual general
rate revenue fall below budget, this does not impact Council’s contractual commitment to fully fund
all tourism and economic development activity. Any general rate revenue shortfall is funded
through other general revenue sources to ensure all planned activities are undertaken in full.
Capital Revenue
YTD capital revenue of $12.8 million received comprises cash contributions from developers ($1.7
million) and capital grants ($10.4 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the
timing of the receipt of developer contributions (both cash and contributed) is unpredictable.
Figure 4: Capital Revenue by Type
$12.0                                                      $10.4
                                           $9.9                       YTD Budget ($m)
$10.0
                                                                      YTD Actual ($m)
 $8.0

 $6.0

 $4.0
               $1.6          $1.7
 $2.0                                                                      $1.0                 $0.7

 $0.0
                                                   Subsidies




                                                                                  Contributed
                   Contribution




                                                    Grants /




                                                                                    Assets
                     Cash

                        s




Capital Program
Actual capital expenditure (excluding commitments) is $20.6 million (YTD budget $24.8 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate quarterly report by the Asset Planning Manager.

Figure 5: Capital Program Delivery Performance

$25.0
               $21.3
                                                                       YTD Budget ($m)
$20.0                       $17.7
                                                                       YTD Actual ($m)
$15.0

$10.0

 $5.0
                                            $2.1               $1.5
                                                                           $1.3             $1.3
 $0.0
                Capital works               Other capital                 Loan redemption




                                                                                                        Page 21 of 29

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                                    14 MARCH 2022


Cash Management and Investment Performance
Total cash on hand at the end of February was $106.1 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
including the financial assistance grant and other capital works grants, January rates payments
received, and unspent monies committed for funding capital projects which are underway and will
continue during the financial year.
The following pie charts present the mix of cash held at February 2022 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating




The following chart monitors the 12 month trend on total cash and the agencies invested. Payments
received in February from bi-annual rates generated a significant increase in cash, which have and
will be invested in short term QTC deposits in line with Council’s Investment Policy. The QTC cash
rate currently offers the best available short term investment rate when compared to rates being
offered by the commercial institutions.

Figure 7: 12 Month Trend of Cash Invested by Agency
120,000,000


100,000,000


 80,000,000


 60,000,000


 40,000,000


 20,000,000


         -
             Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22

         Bendigo TD        Westpac TD     NAB TD     Suncorp TD     CBA TD     QTC      CBA Operating




                                                                                                        Page 22 of 29

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                 14 MARCH 2022


Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.

 Category                                                                                                                                                                         Comments
 Operating Surplus Ratio                                                                                                                                                           Intent: Identifies the extent to
                                       90%   82.6%
                                                                                                                                                                                    which revenues cover
                                       80%
                                                                                                                                                                                    operational expenses, to
                                       70%
                                                                                                                                                                                    ensure community equity is not
                                                          60.9%
                                                                                                                                                                                    degraded
                                       60%
                                       50%                          44.5%                                                                                                          Target: 0 – 10%
                                                                                                             39.0%
                                       40%                                     30.5%
                                                                                                                                                                                   Result: 30.8%
                                                                                                                        30.8%
                                       30%                                                                                                                                         Comment: The ratio is at the
                                                                                          18.3%
                                       20%
                                                                                                     8.3%
                                                                                                                                                                                    second peak for the year
                                       10%                                                                                                                                          following the issue of rates and
                                        0%                                                                                                                                          levies in January. This ratio will
                                      -10%                                                                                                                                          slowly decline as expenditure
                                              Jul        Aug        Sep        Oct        Nov        Dec        Jan        Feb        Mar        Apr        May        Jun          on operations occurs through
                                                                                                                                                                                    to the end of the financial year
                                                               Actual                                   Budget                                     Target                           at 30 June 2022.

 Cash Expense Cover                                                                                                                                                                Intent: Indicates how long
                                      16.0                                                                                                                                          council can continue paying its
                                                                                                                                                                       14.2         day-to-day expenses from
  Months (Cash to Cover Operations)




                                      14.0                                                           12.8
                                              12.2                                                              12.5
                                                                                                                           11.9       11.8
                                                                                                                                                                                    cash at bank without needing
                                                         11.6                                                                                               11.2
                                      12.0                          10.9
                                                                                          10.4
                                                                                                                                                 10.8                               additional cash flows
                                                                               10.1
                                      10.0                                                                                                                                         Target: > 3 months
                                       8.0                                                                                                                                         Result: 14.2 months
                                       6.0                                                                                                                                         Comment: Council is forecast
                                                                                                                                                                                    to remain above target for the
                                       4.0
                                                                                                                                                                                    financial year. Business as
                                       2.0                                                                                                                                          usual expenditure through to
                                        -            -          -          -          -          -          -          -          -          -          -          -          -     30 June 2022 will continue to
                                             Mar         Apr        May        Jun         Jul       Aug        Sep        Oct        Nov        Dec        Jan        Feb          diminish Council’s cash
                                                                                                                                                                                    holdings, albeit not below the
                                                          Actual                                                                  Minimum (>0 months)
                                                          Target (3 months)                                                       Maximum (6 months)                                target range of 3 – 6 months.

 Asset Sustainability Ratio                                                                                                                                                        Intent: Measures the extent to
                                      140%                                                                                                                         130.1%
                                                                                                                                                                                    which assets are being
                                                                                                                                                                                    replaced as their condition
                                      120%                                                                                                                                          degrades to ensure service
                                      100%
                                                                                                                                                                                    potential is maintained
                                                                                                                                                                        90%        Target: 90% of depreciation
                                      80%
                                                                                                                                                                                    budget spent on renewals
                                      60%                                                                              51.0%                                                        annually
                                                                                                            39.8%
                                                                                                 32.9%                                                                             Result: In line with budget
                                      40%                                            27.5%
                                                                           18.2%
                                                                                                                                                                                   Comment: The capital works
                                      20%
                                                     6.6% 10.3%                                                                                                                     program remains on track and
                                             0.9%                                                                                                                                   this ratio will continue to
                                       0%
                                             Jul         Aug        Sep        Oct        Nov     Dec           Jan    Feb        Mar        Apr        May        Jun              increase each month as
                                                                                                                                                                                    expenditure on renewals
                                                Actual Renewal Spend (%)                                   Target (%)                    Renewals Budget (%)                        occurs.




                                                                                                                                                                                                    Page 23 of 29

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                                                                                              14 MARCH 2022


 Category                                                                                                                                      Comments
 Net Financial Liabilities Ratio                                                                                                                Intent: Outlines the level that
                                                                                                                                                 net Council debt can be
               80%
                                                          60%
                                                                                                                                                 serviced by operating
               60%                                                                                                                               revenues. A ratio below zero
                                                                                                                                                 implies that liabilities are less
               40%
                                                                                                                                                 than cash (and other current
               20%                                                                                                                               assets) and there is adequate
                                                                                                                                                 borrowing capacity available if
                                    0%                                                                                                           needed.
   -20%                                                                                                                                         Target: less than 60%
                                                                                         -13%
                                                                                                                                                Result: -58%
   -40%
                                                                                                                                                Comment: Council has low
   -60%                                                                                                                                          debt levels and strong cash
                                                                                                                          -58%
   -80%
                                                                                                                                                 holdings.
                                                      Target                             Budget                         YTD Actual


 Investment Return                                                                                                                              Intent: Ensure appropriate
                                                                                                                                                 return on investment yield for
                                                                                                                                                 cash at bank.
                                                                                                                                                Target: 0.25% above current
                                                                                                                                                 Bloomberg commonwealth 10-
                                                                                                                                                 year bond rate yield (0.08%)
                                                                                                                                                Result: 0.33%
                                                                                                                                                Comment: Regardless of the
                                                                                                                                                 current levels of low long-term
                                                                                                                                                 bond and interest rates
                                                                                                                                                 Council’s investment return still
                                                                                                                                                 remains above target.
                                                                                                                                                  As investment rates increase
                                                                                                                                                  opportunities to maximise
                                                                                                                                                  returns on surplus funds will be
                                                                                                                                                  explored in line with Council’s
                                                                                                                                                  investment policy.
 Rates in Arrears                                                                                                                               Intent: Ensuring that the
                                                                                                                                                 amount of unpaid rates
                                           14.0%
   Percentage of Annual Rates in Arrears




                                                                                                                                                 remains sustainable and does
                                                                                                                                       11.7%
                                           12.0%                                                                                                 not negatively impact cash
                                                                                                  10.2%
                                                   9.5%                                                                                          flows
                                           10.0%
                                                                                                                                                Target: 5% industry
                                            8.0%           7.4%                                           7.3%
                                                                                                                 6.5%                            benchmark
                                                                  6.2%                                                   6.0%   5.8%
                                            6.0%
                                                                         5.7%
                                                                                5.2%
                                                                                         4.6%
                                                                                                                                                Result: 11.7%
                                            4.0%
                                                                                                                                                Comment: Rates arrears are
                                                                                                                                                 at its bi-annual peak following
                                            2.0%                                                                                                 the due date for the January
                                            0.0%
                                                                                                                                                 rates issue. This ratio will
                                                   Mar     Apr    May    Jun     Jul      Aug      Sep    Oct    Nov     Dec     Jan    Feb      continue to decline from the
                                                                                                                                                 high point in the cycle as
                                                                                Actual             Target                                        payments are received.
                                                                                                                                                 Recovery action may be
                                                                                                                                                 considered where appropriate.


Previous Council Consideration
Nil.



                                                                                                                                                                 Page 24 of 29

Section 25

GENERAL COMMITTEE MEETING AGENDA                                                          14 MARCH 2022


Finance
As above.
Risks & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks, Council uses various tools which include
monthly ongoing financial reporting to identify and address issues, conservative budgeting and
compliance with the Financial Sustainability Policy, regular budget reviews, effective liquidity
management to ensure sufficient fiscal flexibility, as well as the Reserves and Restricted Cash
policy requiring both a disaster management reserve and 3 months cash cover reserves to fund
emergent matters.
Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
        Substantial damage to or failure of Council infrastructure due to natural disaster or other
         emergent issue that may require significant unplanned investment;
        Closure of Council facilities due to ongoing Covid 19 restrictions;
        A prolonged IT system failure affecting Council’s ability to deliver services or issue rates
         notices;
        Economic conditions affecting ratepayers’ ability to pay rates;
        Market driven increases in construction and operational costs significantly above estimates;
        Labour and material shortages and delays.
Given the recent flooding event, assessments are currently underway to assess what impact this
may have on Council’s financial position and what disaster funding opportunities may available to
offset this expenditure.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

    X   Chief Executive Officer   X   Community Services                      X   Corporate Services
        Executive Support             Director                                X   Director
                                      Community Development                   X   Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

    X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
        Director                      Director                                    Director
        Community Engagement          Building & Plumbing Services                Asset Management
        Customer Service              Development Assessment                      Buildings and Facilities
        Governance                    Economic Development                        Civil Operations
        People and Culture            Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 25 of 29

Section 26

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 26 of 29

GENERAL COMMITTEE MEETING AGENDA                                                                      14 MARCH 2022

                                                                                                 ATTACHMENT 1

  Profit and Loss Statement
  Revenue
     Recurrent Revenue
     Rates, levies and charges                          74.704        74,755          74,209           154       100%
    Fees and charges                                     8.246         5,827           6,264          537        77%
    Interest received                                    670             476           436              10       73%
    Sale of Goods and major services                    11,004          7484           8,447           963       76%
    Sale of contract and recoverable works                 23              -              0              0        1%
     Rental & lease income                               1,885          1,343          1,334           (10)      71%
    Other income                                         1.244          606            605             (81)      40%
     Grants, subsidies, contributions and donations      5,925          4.240          4,243             3       72%
    Unitywater Distributions                             5,650         2.044          2,044               -       52%
                                                       109,530        ‘97.766        99,333           1,567      31%
  Expenses
     Recurrent Expenses
    Employee benefits                                   BAX           24,478         23,615            864       62%
    Materials and services                              51,081         31,851         31,222          628        61%
    Finance costs                                        1114           724            736             (12)      66%
    Depreciation                                       19,589          13,060         13,061           (2)       67%
    Other expenses                                       23              158            130             28        56%
                                                       110,161        70,272         68,765           1,507       62%
Operating Result YT
  Summary of Capital Expenditure and Funding
  Capital Funding
     Capital cash contributions and infrastructure charges 1,397        1,565          1,717           152       123%
     Contributed assets                                  1,500          1,011          688            (322)      46%
     Capital grants and subsidies                      18,963          0,875         10,433           568         55%
     Cash / revenue                                    22.860          13,332         9,305          (4,027)     41%
    New loan borrowings                                 4.850              -              -               -       o%
    Other capital revenue                                   -              -              -               -       o%
Total Capital Funding                                  9ST           5B              AY
  Capital Expenditure
     Contributed assets                                  1,500          1,011          6388           (322)      46%
     Capital works - constructed assets                42440           21,34         17,740         (3,504)      42%
     Capital works - other capital                      4342            2,141          1,537          (605)       35%
     Loan redemption                                     1,297          1,207          1,297              -      100%
     anes aes                                               -              -            831            881       o%

                                                                                                         Page 26 of 29

Section 27

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 27 of 29

GENERAL COMMITTEE MEETING AGENDA                                                        14 MARCH 2022

                                                                                  ATTACHMENT 2

  Current Assets
       Cash and cash equivalents                           65,875            106,201           68,895
       Trade and other receivables                          10,286            11,998            7,467
      Inventories                                             144               153               144
      Contract Assets                                            -             487                487
       Other current assets                                 3,425              3,099            4.955
                                                           79,730            121,939           81,948
       Non Current Assets held for sale                          -                 -                 -
 Total Current Assets                                      79,730            121,939           81,948
  Non Current Assets
       Trade and other receivables                         53,761            49 468            49 468
       Other non current Assets                                  -                 -                 -
      Investments                                          88,040            92.434            92,434
      Investment property                                    3,000             2,900            2,900
       Property, plant and equipment                      999,038           959,076           952,579
       Right of Use Assets                                     89                869               89
       Intangible assets                                    2,925              2,771             3,036
 Total Non Current Assets                                1,146,853         1,106,737         1,100,506
TotalAssets |                                           4,226,584         1,228,676         1,182,454
  Current Liabilities
       Trade and other payables                              7,334            14,817           10,468
       Contract Liabilities                                  4,377            4.377             4377
      Borrowings                                              946                 4               955
       Lease Liablities                                        25               25                 25
      Provisions                                             8,103             5,121            4947
      Other                                                  3,998             2.943            2,898
 Total Current Liabilities                                 24,783            27,279            23,669
  Non Current Liabilities
      Borrowings                                           24,390            20,258            20,258
       Lease Liabilities                                       66                66                66
      Provisions                                            16,555            16,555           16,555
 Total Non Current Liabilities                              41,011           36,879            36,879
Totalliabilities:                                          6579               ATER            60,5497

  Community Equity
       Asset Revaluation Surplus                           126,129           108,561           108,473
       Retained Surplus / (Defeciency)                           -                 -                 -
       Shire Capital                                     1,034,661         1,013,432          999,512
       Current Year Net ity                                      -          54517              1,905

                                                                                           Page 27 of 29

Section 28

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




                                    Page 28 of 29

GENERAL COMMITTEE MEETING AGENDA                                                                      14 MARCH 2022

                                                                                              ATTACHMENT 3

Cash flows from operating activities
     Cash Flows from Operating Activities
      Receipts from Customers                                            04.649            92,273              93,975
      Payments to Suppliers and Employees                                (20,066)       __(55.466)   _ (84.528)
                                                                           4,582           36,807               9.447
      Investment and Interest Revenue Received                             3,270             1,495              3.401
      Rental Income                                                        1,873             1,334              1,365
      Non Capital Grants and Contributions                                 5,887             4,243              6,085
     Income Tax Equivalent Received                                        1,200             1,088              1,450
      Income from Equity investments                                       1,850              847               1,600
     Payments:
      Borrowing Costs                                                          -                 -             (2,498)
      Interest Expense                                                      (516)              (86)              (131)
     ‘Net Cash Inflow(Outfiow) from Operating Activities ==               48.446            5.72B             20,719
Cash Flows from Investing Activities

     Proceeds of Sale of Property, Plant and Equipment                         -               103               217
     Grants, Subsidies, Contributions and Donations                      20,360             12,150             13,679
     Payments:
      Payments of Property, Plant and Equipment                          (45,953)          (19,138)           (22,721)
      Payments for Intangible Assets                                        (829)             (361)            (1,385)
      Net Movement in Loans and Advances                                       -               125               125
     Net Cash Inflow/(Outflow) from Investing Activities ==             (26.422)            7.22)            (10,085),
Cash Flows from Financing Activities

     Proceeds from Borrowings                                              4,859                 -              2,500
     Payments:
      Repayment of Borrowings                                              (736)            (1,288)            (1,263)
     ‘Net Cash Inflow(Outfiow) from Financing Activities =                 AZB            (299)                 1.287
    Net Increasel(Decrease) in Cash andCashEquivalentsheld =             (4153)            37.9061. TT
    Cash and Cash Equivalents at the beginning of the reporting period    70,028           68,894              57,023

                                                                                                         Page 28 of 29

Section 29

GENERAL COMMITTEE MEETING AGENDA   14 MARCH 2022




7.    CLOSED SESSION

     Nil




                                    Page 29 of 29

GENERAL COMMITTEE MEETING AGENDA                                                       14 MARCH 2022

                                                                                  ATTACHMENT 4

    Materials and services
    Advertising and Marketing                   27            184         140           14      62%
    Administration Supplies and Consumables     751          482          439          42       59%
    Audit Expenditure                            174           1
5	1	1	2	4	5	1681	962	30	22	96	12
5	1	1	2	4	6	1912	963	31	27	82	(1)
5	1	1	2	4	7	2068	962	41	22	81	7%
4	1	1	2	5	0	356	985	1760	47	-1	
5	1	1	2	5	1	356	999	262	22	96	Communications
5	1	1	2	5	2	563	985	52	47	93	and
5	1	1	2	5	3	625	999	26	22	94	IT
5	1	1	2	5	4	1178	985	63	47	77	634
5	1	1	2	5	5	1420	985	54	47	94	522
5	1	1	2	5	6	1663	999	48	22	91	612
5	1	1	2	5	7	1885	985	63	47	80	(31)
5	1	1	2	5	8	2061	999	55	22	96	90%
4	1	1	2	6	0	356	1025	1760	48	-1	
5	1	1	2	6	1	356	1036	154	22	95	Commission
5	1	1	2	6	2	518	1036	57	22	59	Paid
5	1	1	2	6	3	1170	1025	68	47	75	1.218
5	1	1	2	6	4	1411	1025	63	47	0	7B4
5	1	1	2	6	5	1652	1026	55	47	84	997
5	1	1	2	6	6	1870	1026	78	47	95	(213)
5	1	1	2	6	7	2061	1039	55	23	95	82%
4	1	1	2	7	0	356	1061	1760	48	-1	
5	1	1	2	7	1	356	1072	154	29	66	Consultancy
5	1	1	2	7	2	517	1073	106	22	95	Services
5	1	1	2	7	3	1158	1061	83	47	70	1.279
5	1	1	2	7	4	1656	1062	54	47	94	795
5	1	1	2	7	5	1882	1062	66	47	94	(136)
5	1	1	2	7	6	2060	1076	56	22	94	62%
4	1	1	2	8	0	340	1096	1776	52	-1	
5	1	1	2	8	1	340	1096	122	47	95	Contract
5	1	1	2	8	2	465	1096	111	47	96	Services
5	1	1	2	8	3	1140	1101	100	46	79	24,287
5	1	1	2	8	4	1391	1101	83	46	73	14,547
5	1	1	2	8	5	1626	1101	88	47	90	14,236
5	1	1	2	8	6	1883	1100	62	46	68	252
5	1	1	2	8	7	2061	1113	55	22	94	59%
4	1	1	2	9	0	356	1134	1760	65	-1	
5	1	1	2	9	1	356	1150	171	25	41	Contriputions,
5	1	1	2	9	2	532	1136	136	48	92	Donations,
5	1	1	2	9	3	676	1136	152	48	96	Sponsorship
5	1	1	2	9	4	828	1136	52	48	95	and
5	1	1	2	9	5	880	1136	88	48	96	Prizes
5	1	1	2	9	6	1159	1137	72	48	60	3.471
5	1	1	2	9	7	1404	1136	72	48	93	3,059
5	1	1	2	9	8	1548	1140	6	59	90	|
5	1	1	2	9	9	1625	1135	86	48	86	3,170
5	1	1	2	9	10	1882	1134	60	48	84	(111)
5	1	1	2	9	11	2061	1150	55	22	61	91%
4	1	1	2	10	0	340	1173	1776	51	-1	
5	1	1	2	10	1	340	1173	138	47	94	Electricity
5	1	1	2	10	2	1158	1176	83	47	86	1,729
5	1	1	2	10	3	1394	1176	80	47	90	1,147
5	1	1	2	10	4	1631	1177	80	47	95	1,132
5	1	1	2	10	5	1917	1190	31	22	90	15
5	1	1	2	10	6	2060	1190	56	22	91	65%
4	1	1	2	11	0	352	1210	1764	52	-1	
5	1	1	2	11	1	352	1210	94	47	23	intemal
5	1	1	2	11	2	449	1210	68	47	88	Fleet
5	1	1	2	11	3	524	1210	75	47	96	Costs
5	1	1	2	11	4	602	1210	48	47	93	and
5	1	1	2	11	5	653	1210	103	47	80	Extemal
5	1	1	2	11	6	755	1210	75	47	83	Plant
5	1	1	2	11	7	829	1210	60	47	96	Hire
5	1	1	2	11	8	1170	1215	69	46	88	1,668
5	1	1	2	11	9	1394	1215	83	47	75	1,073
5	1	1	2	11	10	1643	1213	67	47	91	1,156
5	1	1	2	11	11	1904	1213	48	47	57	7)
5	1	1	2	11	12	2060	1227	56	22	85	69%
4	1	1	2	12	0	356	1249	1760	49	-1	
5	1	1	2	12	1	356	1260	85	23	95	Grants
5	1	1	2	12	2	438	1247	63	47	84	Paid
5	1	1	2	12	3	504	1247	31	47	94	to
5	1	1	2	12	4	540	1247	141	47	93	Community
5	1	1	2	12	5	684	1247	178	47	80	Organisations
5	1	1	2	12	6	1158	1249	83	47	89	1,939
5	1	1	2	12	7	1406	1250	68	47	92	1,152
5	1	1	2	12	8	1631	1251	83	47	96	1,232
5	1	1	2	12	9	1885	1251	63	47	69	(80)
5	1	1	2	12	10	2060	1264	56	22	89	64%
4	1	1	2	13	0	344	1287	1772	47	-1	
5	1	1	2	13	1	344	1287	138	47	90	Insurance
5	1	1	2	13	2	1178	1287	55	47	93	703
5	1	1	2	13	3	1419	1287	55	47	93	679
5	1	1	2	13	4	1651	1287	55	47	86	656
5	1	1	2	13	5	1902	1287	46	47	89	23
5	1	1	2	13	6	2061	1301	55	22	95	93%
4	1	1	2	14	0	356	1336	1760	39	-1	
5	1	1	2	14	1	356	1338	68	28	95	Legal
5	1	1	2	14	2	440	1337	122	29	95	Expenses
5	1	1	2	14	3	1170	1337	67	37	76	1,856
5	1	1	2	14	4	1406	1337	72	38	94	1,059
5	1	1	2	14	5	1660	1336	51	38	64	863
5	1	1	2	14	6	1902	1336	46	37	96	196
5	1	1	2	14	7	2060	1341	56	22	95	46%
4	1	1	2	15	0	356	1363	1760	48	-1	
5	1	1	2	15	1	356	1374	122	29	96	Operating
5	1	1	2	15	2	486	1375	89	22	96	Leases
5	1	1	2	15	3	582	1375	47	22	96	and
5	1	1	2	15	4	637	1374	94	23	92	Rentals
5	1	1	2	15	5	1186	1363	55	47	84	302
5	1	1	2	15	6	1427	1378	46	22	75	218
5	1	1	2	15	7	1655	1364	56	47	90	233
5	1	1	2	15	8	1897	1364	51	47	85	(15)
5	1	1	2	15	9	2060	1378	56	22	88	77%
4	1	1	2	16	0	356	1411	1760	33	-1	
5	1	1	2	16	1	340	1407	126	34	95	Software
5	1	1	2	16	2	471	1407	54	34	95	and
5	1	1	2	16	3	527	1411	159	22	95	Maintenance
5	1	1	2	16	4	1157	1411	81	32	93	2,166
5	1	1	2	16	5	1406	1411	68	33	93	1,472
5	1	1	2	16	6	1643	1411	68	32	83	1,384
5	1	1	2	16	7	1906	1411	42	30	44	BE
5	1	1	2	16	8	2060	1415	56	22	96	64%
4	1	1	2	17	0	356	1440	1760	44	-1	
5	1	1	2	17	1	356	1448	222	28	49	Subecrptions
5	1	1	2	17	2	529	1440	49	41	96	and
5	1	1	2	17	3	585	1448	162	29	94	Registrations
5	1	1	2	17	4	1182	1440	55	40	84	369
5	1	1	2	17	5	1413	1440	61	40	92	289
5	1	1	2	17	6	1664	1440	50	40	40	32
5	1	1	2	17	7	1897	1440	51	44	17	(13)
5	1	1	2	17	8	2061	1451	55	23	32	82%
4	1	1	2	18	0	355	1483	1761	40	-1	
5	1	1	2	18	1	355	1483	81	39	92	Waste
5	1	1	2	18	2	438	1483	66	39	95	Levy
5	1	1	2	18	3	510	1488	125	29	96	Payments
5	1	1	2	18	4	1170	1484	68	39	82	1,460
5	1	1	2	18	5	1417	1484	57	39	89	373
5	1	1	2	18	6	1643	1484	68	39	89	1,057
5	1	1	2	18	7	1889	1483	59	39	68	(34)
5	1	1	2	18	8	2060	1488	56	23	92	73%
4	1	1	2	19	0	355	1514	1761	48	-1	
5	1	1	2	19	1	355	1525	262	29	94	Water
5	1	1	2	19	2	433	1511	52	47	95	and
5	1	1	2	19	3	492	1525	125	29	96	Sewerage
5	1	1	2	19	4	624	1525	105	29	96	Charges
5	1	1	2	19	5	1158	1514	83	47	94	1,090
5	1	1	2	19	6	1415	1514	55	47	41	697
5	1	1	2	19	7	1652	1515	54	46	79	531
5	1	1	2	19	8	1901	1515	47	47	90	166
5	1	1	2	19	9	2060	1528	56	23	94	49%
4	1	1	2	20	0	354	1561	1762	33	-1	
5	1	1	2	20	1	354	1562	33	22	93	All
5	1	1	2	20	2	394	1562	73	22	96	Other
5	1	1	2	20	3	473	1562	112	22	38	Materials
5	1	1	2	20	4	590	1558	52	34	96	and
5	1	1	2	20	5	641	1558	112	34	96	Services
5	1	1	2	20	6	1167	1561	73	33	73	5.706
5	1	1	2	20	7	1404	1561	71	33	79	2,870
5	1	1	2	20	8	1630	1561	81	33	75	2.205
5	1	1	2	20	9	1888	1561	63	31	96	664
5	1	1	2	20	10	2061	1565	55	23	74	39%
3	1	1	3	0	0	1145	1589	972	48	-1	
4	1	1	3	1	0	1145	1589	972	48	-1	
5	1	1	3	1	1	1145	1590	95	47	75	51,091
5	1	1	3	1	2	1380	1590	92	47	85	31,851
5	1	1	3	1	3	1625	1589	90	47	94	31,222
5	1	1	3	1	4	2061	1602	56	22	84	61%
3	1	1	4	0	0	260	2644	1983	715	-1	
4	1	1	4	1	0	260	2644	717	48	-1	
5	1	1	4	1	1	260	2644	47	48	85	7.
5	1	1	4	1	2	423	2647	337	35	96	
5	1	1	4	1	3	775	2647	202	35	96	SESSION
4	1	1	4	2	0	392	2765	43	31	-1	
5	1	1	4	2	1	392	2765	43	31	96	Nil
4	1	1	4	3	0	1954	3315	289	44	-1	
5	1	1	4	3	1	1954	3315	105	44	96	Page
5	1	1	4	3	2	2074	3315	49	35	96	29
5	1	1	4	3	3	2138	3315	43	35	96	of
5	1	1	4	3	4	2194	3315	49	35	96	29

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.