Issue              Presence of CREVNT fauna within the development and/or impact area
                   The Clearing Contractor is responsible for conducting vegetation clearing in accordance
                   with this management plan.
                   The FSC / Ecologist is responsible for:
                        • Undertaking a pre-clearance survey and trapping program within two [2] weeks of
                            works commencing.
                        • Safely capturing fauna and releasing fauna into suitable habitat and under
                            suitable conditions, as per actions detailed in this FMP and all other relevant
                            project plans.
                        • Maintaining detailed records of fauna interactions and fauna habitats cleared.
                        • Preparing reports which detail any habitat cleared, including the number of
                            hollows, arboreal termitaria and hollow-recruitment trees, and fauna interactions,
                            and the outcome.
                   All personnel are responsible for upholding animal welfare by preventing and / or
                   minimizing the risk of distress, injury, illness, orphanage, predation or death of fauna.
Reporting and      The FSC / Ecologist is responsible for:
Auditing                • Providing the client with a Pre-Clearance Report detailing habitat features
                            identified and any necessary management actions.
                        • Providing the client with a Post-Clearance Report, detailing the clearing of any
                            native vegetation, including any fauna found and or relocated, and the details of
                            all habitat features removed during works.
                        • Maintaining fauna interactions and breeding place registers.
Corrective         In the event that practices are inconsistent with the strategies outlined in the KMP or this
Action             FMP, and any other relevant plans, the contractor should take the corrective steps and
                   report non-compliance to the relevant personnel and remedial actions put into place.




    5.2.        Vegetation Clearing
Clearing of native and non-native vegetation can result in the direct injury or death of fauna. Clearing
of the vegetation on Site can also damage fauna habitat within retained vegetation, particularly where
Frangipani vine (C. fragrans) extend from one tree to another and to sub-canopy layers.
Grubbing can have additional soil degradation impacts. Disturbing the soil by removing roots and
ground cover will leave it exposed to the elements and potentially increase erosion towards the
watercourse. Exposed soil can also change in structure, and sedimentation into the waterway can
alter water quality.
The clearing of non-native flora poses additional biosecurity risks through spread of existing weeds
and introduction of new species. A carrier is anything capable of moving biosecurity matter, such as
invasive plant seeds, attached to, or contained in the thing from one place to another. All types of
vehicles and machinery are capable of being carriers of invasive plants. Management actions to
minimise the risk of weed incursion at the Site are detailed in the Weed Management Plan prepared
by Native Foresters. This Plan (see Table 2) will focus on fauna and habitat removal during vegetation
removal and disturbance.
Table 2. Management Strategies - Vegetation Clearing
Issue              Fauna habitat removal during vegetation clearing
Management         Reduce direct and indirect effects on fauna and their habitat during the clearing
Objective          processes.




FAUNA MANAGEMENT PLAN | 142 Noosa Drive, Noosa Heads                                                       13

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Fauna Managment Plan.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.