Issue           Fauna habitat removal during vegetation clearing
                             o This limb will then be placed outside of the impact area to allow the fauna
                                  to emerge of its own accord.
                    • Where possible, hollow logs and/or branches are to be salvaged for use in nest
                         box or habitat creation. Hollow logs unsuitable for salvage should be placed in
                         retained areas to provide terrestrial habitat.
                    • Hives of native bees (genus Tetragonula (syn Trigona) and/or Austroplebeia) are
                         to be salvaged for relocation into retained vegetation.
                    • Trees are to be felled “inwards” to avoid damaging surrounding retained
                         vegetation. Clearing contractors must be aware of canopy overlap and vines or
                         other links between retained and removed vegetation.
                    • All trees to be removed will be rechecked by a FSC (or arborist under supervision
                         of an FSC) prior to and after felling, to ensure there is no fauna present.
                    • All trees that are to be stockpiled for more than 24hrs must be re-checked by a
                         FSC prior to mulching to ensure no fauna have relocated into the pile.
                    • Ensure machinery, any vehicles, clothing and footwear is free of soil and plant
                         material before leaving Site, or stepping into outside vehicles, to avoid spreading
                         invasive seeds/materials.
                    • Ensure that washdown Sites are away from watercourses and drains—this will
                         help prevent the spread of invasive plants and will avoid grease and detergents
                         polluting nearby water.
                After works:
                    • Fauna should not be left on an isolated ‘island’.
                    • Cleared vegetation should be piled thoughtfully; kept away from waterways and
                         without causing damage to the surrounding habitat.
                    • Cleared vegetation must be stored in a way that will not disturb fauna movement.
                    • Large rocks and logs should be placed nearby to provide shelter for fauna.
Performance     1. Zero disturbance must occur outside the permitted impact area.
Indicators      2. Disturbance of fauna should be avoided, where possible, or minimized.
                3. Mortality of fauna must be prevented.
                4. Suitable habitat within areas not scheduled for clearing must remain functional and
                    stable.
Responsible     RACV is held accountable for:
Personnel           • Ensuring all contractors have read and are able to comply with this management
                         plan.
                The Project Manager is responsible for:
                    • Ensuring contractor compliance with plans pertaining to the project.
                    • Ensuring a suitably qualified FSC undertakes a pre-clearance survey to identify
                         habitat features and reduce fauna load within two [2] weeks of clearing works.
                         This is to include a fauna trapping program.
                    • Ensuring a suitably qualified FSC is present for all vegetation clearing.
                    • Ensuring habitat connectivity is maintained through corridors of retained
                         vegetation.
                    • Ensuring weed hygiene practices are adhered to.
                    • Implementing adaptive management for any weeds identified during works, as
                         necessary.
                The Clearing Contractor is responsible for conducting vegetation clearing in accordance
                with this management plan.
                The FSC / Ecologist is responsible for:
                    • Undertaking a pre-clearance survey within two [2] weeks of works commencing.
                         This is to include a trapping program.
                    • Safely capturing fauna and releasing fauna into suitable habitat and under
                         suitable conditions, as per actions detailed in this FMP and all other relevant
                         project plans.
                    • Maintaining detailed records of fauna interactions and fauna habitats cleared.




FAUNA MANAGEMENT PLAN | 142 Noosa Drive, Noosa Heads                                                    15

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Fauna Managment Plan.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.