Council archive · source document
Attachment 5 - Fauna Managment Plan · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
• The location and contact details of veterinary clinics and wildlife carers are to
be kept in an accessible location on Site in the event that an animal is injured
on or in the vicinity of the Site and no FSC is present (for example, during
construction). Advice must be sought from the FSC or a wildlife carer prior to
disturbing the animal.
• Invasive and introduced fauna are to be managed ethically by the FSC. This
may include taking the animal to the nearest veterinary clinic for euthanasia.
• Detailed records of fauna interactions and incidents will be maintained by the
FSC and will be included in the Post-Clearance Report.
After works:
• Installation of nest boxes is required to compensate for the loss of hollows.
Nesting boxes are to be installed at a ratio of 2:1 (two [2] boxes per hollow
removed or a minimum of ten [10] boxes; further details are provided in
Section 5.6).
Performance 1. Zero disturbance must occur outside the permitted impact area.
Indicators 2. Mortality and disturbance of fauna should be prevented.
Responsible RACV is held accountable for:
Personnel • Ensuring a suitably qualified FSC is present for all vegetation clearing.
The Project Manager is responsible for:
• Working with the FSC to manage any animal welfare issues identified (e.g.,
active nests).
• Ensuring all personnel are reminded of their responsibility to uphold animal
welfare by preventing and / or minimizing the risk of distress, injury, illness,
orphanage, predation, or death of fauna.
• Ensuring all personnel understand that fauna is not to be handled by anyone
except the licensed FSC (or advice must be sought if no FSC is on Site
following clearing).
• Ensuring that clearing works cease temporarily if an animal is injured, to allow
the FSC time to assess the level of injury and determine the next steps
required.
The Clearing Contractor is responsible for:
• Communicating clearly and effectively with the FSC, by use of radio, hand
signals or other agreed upon methods.
• Working carefully and under the assumption that fauna or their habitat may be
concealed within vegetation.
• Working with the FSC to manage any animal welfare issues identified.
• Ceasing vegetation clearing while the FSC is managing fauna. The contractor
may seek advice from the FSC on which works may continue to be
undertaken, if any.
The FSC / Ecologist is responsible for:
• Capturing and relocating fauna. Unimpeded passage must be available for
any fauna not captured to allow for safe self-dispersal away from Site.
• Maintaining detailed records of fauna interactions and fauna habitats cleared,
and preparing reports.
Reporting and The FSC / Ecologist is to provide RACV with a Post-Clearance Report which details
Auditing fauna management actions and outcomes.
Corrective Action In the event that practices are inconsistent with the strategies outlined in this FMP, the
contractor should take the corrective steps and report non-compliance to the relevant
personnel.
In the event of a fauna-vehicle collision, existing measures to increase driver
awareness, and lessen risk of collision will be reviewed.
FAUNA MANAGEMENT PLAN | 142 Noosa Drive, Noosa Heads 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Fauna Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.