Info Request DAINFOREQ OPW15/0231 12961729 151218 102308
Officer :Mark Lewis Direct Telephone :53296290 Fax :53296501 Our Reference :MLEWIS:OPW15/0231 Your Reference :215 David Low Way 18 December 2015 Thomco No 2087 Pty Ltd PO Box 54 PEREGIAN BEACH QLD 4573 Dear Sir/Madam Information Request Sustainable Planning Act 2009 I refer to your application and advise that Council requires further information to satisfactorily assess the proposal. application details Application No: OPW15/0231 Proposal: Development Permit for Operational Work, Extraction or Filling - Earthworks, Stockpiling Fill Street Address: 215 David Low Way PEREGIAN BEACH QLD 4573 Real Property Description: Lot 77 SP 231615 information required The information requested is set out below: Issue The filling of the site has taken place at the rear in an apparent drainage area and in close proximity to the area to be dedicated as “Park” in the higher order approvals MCU13/0251 and 152010/627.02. The submitted plan indicating the “stockpile” does not include any dimensions to position the “stockpile” and it’s extents Information Required Provide a site plan showing the surveyed extent of fill and the proposed “Park” boundaries as required by the higher order approvals. The plan must also indicate those areas of fill to be relocated to the stockpile area. Provide a site plan that indicates the location and extent of the proposed “stockpile”. The “stockpile” must be located: where it will not have off-site drainage impacts, generally outside of the root zones of mature trees, and to protect as much of the existing vegetation as practicable. Provide an assessment by an RPEQ of the impacts of the fill: on the drainage capacity of the site any potential off-site impacts Issue The fill currently placed on-site is not controlled in regard to material and sediment and erosion control. Information Required Provide an assessment of the fill and site for acid sulphate soils. The assessment must be prepared by an RPEQ or suitably qualified person, and if acid sulphate soils are present provide an acid sulphate soil remediation management plan. Provide a sediment and erosion control plan for the current extent of fill, any retained fill and the “stockpile”. The plan must also include methods to control “dust” from the fill and “stockpile”. End of Information Request Under the provisions of the Sustainable Planning Act 2009, you have three options available in response to this Information Request. You may give the assessment manager (in this instance Council) and each referral agency (if any): all of the information requested; or part of the information requested together with a letter asking the assessment manager and each referral agency to proceed with the assessment of the application; or a letter; stating that you do not intend to supply any of the information requested; and asking the assessment manager and each referral agency to proceed with the assessment of the application. Please be aware that under Section 279 of the Sustainable Planning Act 2009 the applicant must respond to the Information Request within 3 months of the request or otherwise the application lapses. A response to the above is required to be submitted, prior to further assessment of the application. If any further matters arise as part of assessment of this application, you will be advised accordingly. Council prefers that all the information requested be submitted as one package. A preliminary assessment only of the application has been undertaken and during the formal decision stage, or as a result of public exhibition, other matters may arise. You may wish to follow the progress of this application online at www.noosa.qld.gov.au . The “PD Online” page can be accessed via "Quick Links" on the left hand side of the screen. A disclaimer will appear; upon clicking “agree”, a search for a development application or property address can be carried out. Should you have any further queries in relation to the above, please do not hesitate to contact Mark Lewis on the above number. Yours faithfully Mark Lewis COORDINATOR ENGINEERING [word/footer1.xml] Page 2 of 3 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 3 [word/header1.xml] OPW15/0231
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.