Town Planning Report and Appendices - Cooroibah

Attached to the e-mail Changed MCU application addition of OPW Application MCU16/0099 & OPW16/0218.

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

    Specific Outcomes            Probable Solutions          Compliance


caused;                                               The facility is designed to
                                                      operate in compliance with
b) unacceptable risks to the                          the mandatory standard for
environment or to personal                            human exposure to EME–
and public safety are unlikely                        currently      the     Radio
to be caused; and                                     communications
                                                      (Electromagnetic Radiation
c) public access is restricted
                                                      Human Exposure) Standard
to meet workplace, health
                                                      2003. Further detail is
and safety requirements.
                                                      provided in Section 8.11.1
                                                      of this report and an EME
                                                      Report associated with this
                                                      site    is    attached    in
                                                      Appendix E.

                                                      The proposed facility will
                                                      not require the installation
                                                      of lighting.

                                                      Noise      and      vibration
                                                      emissions associated with
                                                      the proposed facility will be
                                                      limited to the construction
                                                      phase.    Noise    generated
                                                      during    the    construction
                                                      phase will be of short
                                                      duration and will be in
                                                      accordance      with      the
                                                      standards outlined in the
                                                      Environmental      Protection
                                                      Regulation     1998      and
                                                      Environmental      Protection
                                                      (Noise)     Policy     1997.
                                                      Construction works will only
                                                      occur between the hours of
                                                      7.00am and 6.00pm.

                                                      There will be some low level
                                                      noise from the ongoing
                                                      operation of air conditioning
                                                      equipment associated with
                                                      the outdoor cabinets, once
                                                      installed. Noise emanating
                                                      from the air conditioning
                                                      equipment       is     at    a
                                                      comparable     level    to   a
                                                      domestic air conditioning
                                                      installation,      and     will


                                                                                  99
Log in to download the original file

Town Planning Report and Appendices - Cooroibah.pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.