Performance outcomes Acceptable outcomes Response Comment
introduce fish (including non-endemic fish or noxious fish)
into an area where these species were not previously
found, and this would be more detrimental to the existing
fish community than the effect of the barrier.
Construction
PO30 The construction of waterway AO30.1 Work does not commence during times of Construction works will not commence during times of
barrier works does not limit the elevated flows. elevated flow but during periods of low rainfall or when the
movement or wellbeing of fish. And stream is dry. This will minimise the potential impacts
associated with scouring, erosion and sedimentation. In
addition, it will minimise impact to aquatic species that may
normally be located within the subject site when it is
inundated.
AO30.2 Excavation work in unbunded tidal areas is to be N/A The waterway is not tidal.
scheduled to occur within two hours either side of low tide.
And
AO30.3 In-stream work is scheduled for the driest time of Construction works will not commence during times of
the year. elevated flow but during periods of low rainfall or when the
And stream is dry.
AO30.4 In-stream construction is completed as quickly as Construction will be completed as quickly as possible. It is
possible to lessen the impact on fish and habitats, and anticipated that the works will take 2 weeks.
timed to minimise conflict with fish migrations.
And
AO30.5 Routes for the developments are planned to The alignment of the culvert replacement took into
minimise the impact on fish passage and fish habitat (for consideration a range of technical and environmental factors
example, roads and railways minimise crossings and and was found to provide the best solution.
avoid crossings in environmentally sensitive areas).
PO31 The development does not cause, AO31.1 Removal of stream-bank vegetation and Disturbance and removal is to be minimised.
or minimises direct or indirect disturbance to the natural banks and bed of the waterway
disturbance to the bed and banks is avoided or minimised.
adjacent to the approved footprint of And
works.
AO31.2 Disturbance to the outer bank of waterway beds Refer to Response AO31.1.
during work and while gaining access is minimised.
And
AO31.3 Heavy machinery is excluded from fragile areas No heavy machinery will enter the waterway, fragile areas or
and areas which host fisheries resources. areas which host fisheries resources.
And
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 21 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.