Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Town Planning Report and Appendices - Cooroibah

Attached to the e-mail Changed MCU application addition of OPW Application MCU16/0099 & OPW16/0218.

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Performance outcomes                       Acceptable outcomes                                              Response     Comment
                                           protected to prevent erosion or slumping, by ensuring:
                                           (1) the waterway bed is lined with the original top soil
                                                retained during the construction
                                           (2) materials that are pollutants (such as debris,
                                                chemicals, or construction material) are removed
                                                from the location and appropriately treated and
                                                disposed of as waste outside the strategic
                                                environmental area – for example to a managed
                                                landfill
                                           (3) temporary barriers are removed after use and the
                                                natural materials either returned to their original
                                                location in the strategic environmental area, or if not
                                                taken from the strategic environmental area,
                                                appropriately treated and disposed of as waste
                                                outside the strategic environmental area – for
                                                example to a managed landfill.
PO33 The works do not impede fish          AO33.1 Works (except temporary works required for less           N/A          Refer to Response AO32.1.
passage particularly during critical       than 20 business days) that are not drowned out regularly
periods that are important for breeding,   must contain a fish way, the design of which is approved
feeding, nursery and recruitment of        by the Department of Agriculture and Fisheries.
indigenous fish species.                   And
                                           AO33.2 Any fish way must be operational at all times             N/A          Refer to Response AO32.1.
                                           except where natural flows would have prevented fish
                                           passage.
                                           And
                                           AO33.3 In the case of drought, any fish trapped in the           N/A          Refer to Response AO32.1.
                                           impoundment must be rescued.
                                           And
                                           AO33.4 Vegetation and cover is retained or replaced to           N/A          Refer to Response AO32.1.
                                           pre-work levels and conditions.
                                           And
                                           AO33.5 All works are constructed during periods when             N/A          Refer to Response AO32.1.
                                           fish passage is least affected.
PO34 Development avoids or minimises       AO34.1 Development demonstrates best practice                    N/A          Refer to Response AO32.1.
any adverse impacts on environmental       environmental management to meet relevant
values and water quality objectives for    environmental values and water quality objectives of the
receiving waters (surface and              Environmental Protection (Water) Policy.
groundwater) on site or leaving a site     Or


State development assessment provisions                                    Module 5 — Fisheries resources          5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9                                                                                                                                                                   Page 23 of 24
Log in to download the original file

Town Planning Report and Appendices - Cooroibah.pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.