                                             Officer:          Tracy Jones
                                             Direct Telephone: (07) 5449 5228
                                             Response Address: Locked Bag 72
                                                               Sunshine Coast Mail Centre QLD 4560
                                             Email:            [email protected]
                                             Our Reference:    23649 DA
                                             Your Reference:   01090
19 August 2009

Melda Investments Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567



Dear Madam

                          Change to an Existing Approval
                                  Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 17 August 2009 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:              23649 DA
    Street address:              37 Douglas Street, Sunshine Beach
    Real property description:   Lot 322 RP 48111
    Planning Scheme:             The Noosa Plan

2        DECISION DETAILS

Council on 30 June 2005 decided to issue the following type of approval:-
     Material Change of Use - Non Conforming Dwellings
In relation to your request to extend the relevant period for the above development approval, Council
on 17 August 2009 decided to:
A.        Extend the relevant period until 30 June 2013
B.        Approve to change conditions 1 & 13
C.        Issue a Change to an Existing Approval.

3        RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.




                                                                                        Page 1 of 11
Full text of the other 10 pages

Page 2

                                                                                    2003/221156



4    ASSESSMENT MANAGER CONDITIONS

Land Use
1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are labelled: Proposed Residence – Lot
     322 Douglas Street: Site Plan, Garage Floor Plan, Ground Floor Plan, First Floor Plan, Lower
     Roof Plan, Upper Roof Plan, Sections A & B, Section C, Elevation 1, Elevations 2 & 4,
     Elevation 3, Douglas Street Elevations, Lane Elevations and Northeast Elevation; numbered:
     A-01B, A-02B, A-03B, A-04A, A-05A, A-06B, A-07B, A-08A, A-09A, A-10A, A-11A, A12A,
     A13A, dated 1/12/2003 and A16A dated Nov 2004 and as amended, prepared by Middap
     Ditchfield Architects Pty Ltd and as may be amended by these conditions.
2.   The development must be undertaken and operated in a manner that causes no detrimental
     effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
     lighting nuisance or other emissions.
3.   The open space and setback areas are to be landscaped in accordance with Council’s Policy
     on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
     qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
     the premises being occupied and maintained at all times thereafter. The landscape plan is to
     clearly indicate and include: -
     3.1.    1 x 100 Litre native coastal tree to be planted in the setback area in the southeast
             corner at the front of the subject site;
     3.2.    1 x 100 Litre native coastal trees to be planted in the setback area in the northwest
             corner of the subject site. The length of the pool is to be reduced to accommodate this
             species;
     3.3.    Screening vegetation in the form of native coastal trees and shrubs with understorey
             plantings is required to be planted in the setback areas, to include a mix of plant
             species ranging up to 45 litres;
     3.4.    The two large mature paper bark trees in the southern corner of the subject site are to
             be retained and protected;
     3.5.    An arborist’s report shall be submitted with the application for Operational Works
             addressing the retention of the above trees.
4.   All fencing shall be setback at least 1 metre from the front property boundary, with at least half
     of the fencing setback 2 metres. The area of land between the fence and the front property
     boundary shall be densely landscaped to screen any fencing from the street.
5.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use. These landscape
     plans required to be submitted are to denote areas of existing vegetation or existing trees
     proposed or required to be retained.
6.   Cleared vegetation is to be suitably processed by one of the following methods and removed
     from the site:-
     6.1.    Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
             loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
             minimum of 10 metres between edges of heaps.
     6.2.    Disposal for firewood.
     6.3.    Disposal for landscaping purposes.


                                                                                     Page 2 of 11

Page 3

                                                                                     2003/221156

      6.4.    Transport to alternative site for breaking down materials provided that all necessary
              permits have been obtained to allow the alternate site to be used for this purpose.
      6.5.    The disposal method for clearing works is to be submitted in conjunction with an
              application for a Development Permit for Operational Work. The Applicant is advised
              that other methods may be considered provided full details of the method are
              submitted.
      6.6.    The Applicant is advised that burning off is an unacceptable method of disposal.
7.    The northeastern wall of the building is to incorporate a mixture of materials including timber
      boards and pre-cast concrete wall panel.
8.    All hot water systems installed shall be either solar systems; electric heat pump systems; or
      gas systems (LPG or natural).
9.    Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
      thus remaining as open structures.
10.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
11.   Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
12.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
13.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 30 June 2013, unless an application to extend the currency is approved by
      Council.
14.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
Building Services
15.   An identification survey of the subject site is to be carried out by a Licensed Surveyor and is to
      be submitted to Council at the time of foundation inspection or immediately thereafter. Such
      survey shall set out the boundaries of the site and the position of the buildings on the site.
16.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of the work confirming compliance with the
      maximum building height above natural surface, required by the provisions of the Planning
      Scheme.
17.   The plans submitted for a Development Permit for building works on each allotment are to
      comply with the following: -
      17.1.   The maximum height of each garage within 0.75 metres of the applicable side
              boundary shall not exceed 4.5 metres.
      17.2.   The mean height as above shall not exceed 3.5 metres.


                                                                                      Page 3 of 11

Page 4

                                                                                  2003/221156

      17.3.   The side walls of the garages and the alcoves, closer than 0.75 metre from a side
              boundary shall be of “maintenance free” construction to comply with the requirements
              of Part 11 of the Queensland Development Code.
      17.4.   The rooftop pergolas shall remain unroofed and unenclosed at all times.
Land Development
Vehicle Access
18.   A vehicular access driveway to serve each allotment shall be constructed from the Douglas
      Street frontage of the site to a maximum width of 3.5 metres.
19.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any level difference. Should any driveways be
      constructed to grades that do not comply with AS2890.1-2004, Council will require that the
      driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
Carparking
20.   Carparking shall be provided within the sites as shown on the stamped approved plans.
21.   A minimum of 2 covered carpark spaces shall be provided on each site.
22.   The carparking areas shall be designed to comply with the provisions of AS 2890.1-2004 for
      user class 1A with a minimum head clearance (headroom) at any point of 2.2m.
Vegetation Protection
23.   Vehicular pavements within the drip zone of any existing trees to be retained or new trees to
      be planted shall be designed as a pervious pavement (such as grass paving cells or similar),
      as this will allow water that falls on this surface to penetrate to the trees root system. The
      pavement shall be constructed so as not to damage the tree or their root system and in this
      regard temporary fencing shall be provided around the trees during construction to help
      protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of
      the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
      Operational Works.
Roadworks Contributions (Local Road Network)
24.   A roadworks contribution of $627 towards the future upgrading of the local road network shall
      be paid to the Council prior to obtaining a Development Permit for Operational Works. This
      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
      March 2005 until the date of payment.
Frontage Works
25.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Douglas Street frontage of the site in accordance with Planning Scheme Policy PSP1
      Landscaping Guidelines. Grass shall be couch, free of weeds.
26.   A new 1.2m wide concrete path shall be constructed along the Douglas Street frontage of the
      site in accordance with Council’s design standards and to an alignment that protects any
      significant vegetation or any underground services.
27.   All paths shall be designed and constructed to ensure pedestrian safety using non-slip
      materials and to produce an evenly graded surface finish.

                                                                                  Page 4 of 11

Page 5

                                                                                       2003/221156

28.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
29.   A pathway contribution of $168 towards external major pathways, in accordance with Planning
      Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
      to obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the date of
      payment.
Stormwater Drainage
30.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
      be discharged to Council’s kerb & channel street drainage system in Douglas Street. Plans of
      the drainage design shall be prepared by a Registered Professional Civil Engineer and
      submitted to Council prior to obtaining a Development Permit for Operational Works. The
      maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
31.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
32.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
33.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
Earthworks
34.   If any filling works are required on site, it shall be carried out in accordance with Section 3.8 of
      Council’s Engineering Design Standards Manual and so as not to cause the additional
      ponding of water on any adjoining lands or the blockage of, or interference with, any natural
      watercourses.
      This may require the design and construction of drainage pipes and/or an overland flow-path
      within the development site that caters for drainage from the adjoining sites for a design storm
      with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
      Water encompassing the drainage pipes or overland flow-path will also be required. In this
      regard a Development Permit for Operational Works shall be obtained.
      Should evidence be provided to Council indicating that no additional ponding of stormwater will
      occur on the adjoining properties the requirement for the drainage pipes, overland flow-path
      and easement shall not apply.
35.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. Fences that are affected shall be
      replaced prior to Final Building Approval. In this regard any fences to be replaced shall be
      clearly shown on the plans submitted for Operational Works approval.
Erosion and Sediment Control
36.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.


                                                                                       Page 5 of 11

Page 6

                                                                                     2003/221156

      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.

General
37.   For the following classes of work associated with development, a Development Permit for
      Operational Works must be obtained prior to commencement of works relating to that class of
      work. The application may combine any or all of these classes of work:-
      37.1.   Access and/or Carparking.
      37.2.   Site Civil Works.
      37.3.   Stormwater Drainage.
      37.4.   Frontage Works.
      37.5.   Earthworks.
      37.6.   Excavation of materials to fill another site.
      37.7.   Landscaping.
38.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be
      submitted in conjunction with an application for a Development Permit for Operational Works.
      In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
      submitted in conjunction with any application for Operational Works.
39.   Digital detailed design drawings and calculations shall be submitted with any application for a
      Development Permit for Operational Works in respect of roadworks and stormwater drainage
      works. To avoid conflict with underground pipes or services, all existing and proposed
      services required by the development shall be shown on the plans.
40.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
41.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
42.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
43.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
44.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
      type of all services and structures. All of which shall be submitted to Council for checking and
      for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council




                                                                                     Page 6 of 11

Page 7

                                                                                    2003/221156




5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency      Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.    Plan / Document Name                      Date
 A-01B                             Site Plan - prepared by         Middap    1/12/2003
                                   Ditchfield Architects Pty Ltd
 A-02B                             Garage Floor Plan - prepared by           1/12/2003
                                   Middap Ditchfield Architects Pty Ltd
 A-03B                             Ground Floor Plan - prepared by           1/12/2003
                                   Middap Ditchfield Architects Pty Ltd
 A-04A                             First Floor Plan - prepared by Middap     1/12/2003
                                   Ditchfield Architects Pty Ltd
 A-05A                             Lower Roof Plan - prepared by Middap      1/12/2003
                                   Ditchfield Architects Pty Ltd
 A-06B                             Upper Roof Plan - prepared by Middap      1/12/2003
                                   Ditchfield Architects Pty Ltd
 A-07B                             Sections A & B - prepared by Middap       1/12/2003
                                   Ditchfield Architects Pty Ltd
 A-08A                             Section C - prepared by         Middap    1/12/2003
                                   Ditchfield Architects Pty Ltd
 A-09A                             Elevation 1 - prepared by Middap          1/12/2003
                                   Ditchfield Architects Pty Ltd
 A-10A                             Elevations 2 & 4 - prepared by Middap     1/12/2003
                                   Ditchfield Architects Pty Ltd
 A-11A                             Elevation 3 - prepared by Middap          1/12/2003
                                   Ditchfield Architects Pty Ltd
 A12A                              Douglas Street Elevations - prepared      1/12/2003
                                   by Middap Ditchfield Architects Pty Ltd
 A13A                              Lane Elevations - prepared by Middap      1/12/2003
                                   Ditchfield Architects Pty Ltd
 A16A                              Northeast Elevation - prepared by         Nov 2004
                                   Middap Ditchfield Architects Pty Ltd




                                                                                    Page 7 of 11

Page 8

                                                                                      2003/221156


7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Advice
1.    Approval of this development application will trigger an Infrastructure Charge in accordance
      with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of
      $1,716. This amount will subject to variations in the Consumer Price Index, All Groups
      Brisbane from March 2005 until the date of payment. An Infrastructure Charge Notice will be
      issued in accordance with Chapter 5 of the Integrated Planning Act 1997.
2.    Payment via credit card transaction will not be an acceptable method of payment for
      development contributions conditioned in this permit or for infrastructure charge notices issued
      separately.
3.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
      3.1. On a Sunday or public holiday, at any time; or
      3.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.
4.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for operational works over the site.
5.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
      it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
      course. On the spot fines apply for such offences
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.




                                                                                      Page 8 of 11

Page 9

                                                                                      2003/221156


8      PROPERTY NOTES

Not applicable

9      PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable

10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required             Subject of the required Development Permit
 Development Permit for Building Works           All Building Works

 Development Permit for Operational Works        Landscaping, car parking and access, frontage works,
                                                 stormwater drainage and filling of the site

11     SELF ASSESSABLE CODES

The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable

12     SUBMISSIONS

Not applicable
13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15     OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Decision Notice History
30 June 2005 -               Original Decision Notice.
17 August 2009 -             Extend the relevant period & approve a change to Conditions 1 & 13

Yours faithfully,




Tracy Jones

SENIOR DEVELOPMENT PLANNER
                                                                                      Page 9 of 11

Page 10

                                                                                                     2003/221156


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
                                                                    (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the               mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
   (4) If an application involves both impact assessment            any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                    Page 10 of 11

Page 11

                                                                                              2003/221156

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                             Page 11 of 11

Used in these records

About this file

File size
71 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Letter - Change to an Existing Approval [As Published].pdf · 71 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.