- 29 -
Performance outcomes Acceptable outcomes Response
AO3.2 Where there is no available reticulated water R3.2
supply, the premises has: i. Not relevant as complies with AO3.1
1 an accessible dam, swimming pool or water tank
available for fire fighting purposes with an onsite
water volume of not less than 5,000 litres; and
2 a water supply outlet pipe 50 millimetres in
diameter fitted with a standard fire brigade fitting
connected to the water supply (other than where
the water supply is in a swimming pool or dam).
Editor’s Note—Water supply capacity for fire fighting
purposes is in addition to water supply capacity for
other uses and activities on the premises.
Essential Community Infrastructure
PO4 Essential community AO4.1 Development involving essential community R4.1
infrastructure is able to function infrastructure is not located within a medium or high i. The development does not involve Essential Community
effectively during and bushfire hazard area. Infrastructure
immediately after bushfire events.
OR
AO4.2 Where located in a medium or high bushfire R4.2
hazard area, development involving essential i. The above report clearly demonstrates based on the QFES
community infrastructure is designed to function and SPP Natural Hazards, Risk and Resilience Bushfire
effectively during and after a bushfire event in hazard mapping that the proposed development footprint in
accordance with a Bushfire Hazard Management not within or within 100 metres of a bushfire hazard area.
Plan.
Editor’s Note— PSP8 Natural Hazards provides
guidance for assessing bushfire hazard risk and
preparing a bushfire hazard management plan.
Hazardous Materials
PO5 Public safety and the AO5 Hazardous materials are not manufactured or R5
environment are not adversely stored in bulk in a bushfire hazard area. i. The proposed development will not involve the storage or
affected by the impacts of manufacture of any hazardous material.
bushfire on hazardous materials
manufacturing or storing in bulk.
RFA18-048 – 22 - RACV NOOSA RESORT – ECO-CABINS - BUSHFIRE HAZARD ASSESSMENT AND MITIGATION PLAN
ROB FRIEND & ASSOCIATES PTY LTD 18TH OF JULY 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 7A - Bushfire Hazard Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.