                                                                             - 29 -


    Performance outcomes                             Acceptable outcomes                                                 Response
                                   AO3.2 Where there is no available reticulated water        R3.2
                                   supply, the premises has:                                  i. Not relevant as complies with AO3.1
                                   1 an accessible dam, swimming pool or water tank
                                       available for fire fighting purposes with an onsite
                                       water volume of not less than 5,000 litres; and
                                   2 a water supply outlet pipe 50 millimetres in
                                       diameter fitted with a standard fire brigade fitting
                                       connected to the water supply (other than where
                                       the water supply is in a swimming pool or dam).
                                   Editor’s Note—Water supply capacity for fire fighting
                                   purposes is in addition to water supply capacity for
                                   other uses and activities on the premises.
Essential Community Infrastructure
PO4 Essential community            AO4.1 Development involving essential community            R4.1
infrastructure is able to function infrastructure is not located within a medium or high      i. The development does not involve Essential Community
effectively during and             bushfire hazard area.                                         Infrastructure
immediately after bushfire events.
                                   OR
                                   AO4.2 Where located in a medium or high bushfire           R4.2
                                   hazard area, development involving essential               i. The above report clearly demonstrates based on the QFES
                                   community infrastructure is designed to function              and SPP Natural Hazards, Risk and Resilience Bushfire
                                   effectively during and after a bushfire event in              hazard mapping that the proposed development footprint in
                                   accordance with a Bushfire Hazard Management                  not within or within 100 metres of a bushfire hazard area.
                                   Plan.
                                    Editor’s Note— PSP8 Natural Hazards provides
                                    guidance for assessing bushfire hazard risk and
                                    preparing a bushfire hazard management plan.
Hazardous Materials
PO5 Public safety and the           AO5 Hazardous materials are not manufactured or           R5
environment are not adversely       stored in bulk in a bushfire hazard area.                 i. The proposed development will not involve the storage or
affected by the impacts of                                                                       manufacture of any hazardous material.
bushfire on hazardous materials
manufacturing or storing in bulk.
                                RFA18-048 – 22 - RACV NOOSA RESORT – ECO-CABINS - BUSHFIRE HAZARD ASSESSMENT AND MITIGATION PLAN

ROB FRIEND & ASSOCIATES PTY LTD                                                                                                             18TH OF JULY 2023

Used in these records

About this file

File size
16.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 7A - Bushfire Hazard Assessment.pdf · 16.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.