eyed Wt Application Details - IDAS form 1 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) You MUST complete ALL questions unless the form indicates otherwis. e. Incomplete forms or forms without all 4 necessary information and documentation will result in your application not being a Properly made application. For ail development applications, you must: . complete this form (Application details - IDAS form 14 ) * complete any other forms relevant to your application * " provide any mandatory Supporting information identified on the forms as being required to accompany your application. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. Applicant details (note: the applicant is the person responsible for making the application and need not be the =: Owner of the land. The applicant is responsible for ensuring the information Provided on all IDAS application forms is Correct. Any development permit or Preliminary approval that may be issued aS.a Consequence of this application will be issued to the applicant.) ‘ Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another applicant” button below. Nameis (individual or company name in full) PILE.IT PTY LTD | For companies, contact name EMMA REED Postal address PO BOX 299 NOOSAVILLE 4566 Contact phone number 07 54743480 @ Mobile number (non-mandatory) 0408137526 Fax number (non-mandatory) 07 54743480 lt e-mail address (non-mandatory) [email protected] [1. What is the nature of development Proposed? (tick aii applicable boxes) . . ; (1s materia! change of use of premis¢s [building work X] operational work 0 reconfiguring a lot era K Infrastructure and Planning mo Gain. . ee
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 19 pages
Page 2
HLL
2. What type of approval is being sought?
—X] development permit
[J preliminary approval
(1 both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
—] No
{]_ Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify.each lot in a separate row) .
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Street Address Lot on pl an
description
Local government area
Unit | Street Street name and official ‘Post |) ot No.| Plan type (e.g. Logan,Cairns)
No. | No. suburb/locality name code ‘| and plan no. |:
SHOREHAVEN DRIVE SUNSHINE COAST
NOOSAVILLE 4566 472 | RP868305 | REGIONAL COUNCIL
["] Street address / lot on plan
ml Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
1 95
Coordinates (note: place each set of
coordinates in a separate row) Zone Datum Local government
reference area (If applicable)
Easting Northing Latitude | Longitude
[1 Gpaga
(J wess4
(FJ other
5. Total area of the premises on which the development is proposed (indicate hectares or m?)
720m2
6. Current use/s of the premises (e.g: vacant land, house, ‘apartment building, cane farm, etc.)
1 |HOUSE
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
NEW TIMBER JETTY
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 3
ooo
8. ls owner's consent required for this application? (refer to notes at the end of this form for more information)
a)
Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land MIKE AND PAM BLENKINSOP
We, the above-mentioned owner/s of the land, consent to the making of this application.
4 Ly.
Signature of owner/s of the land Klan 2 7 / Mb wy
4
: I fi 7
A
L
7
Pate 4 | ‘Lie
v
Table E
Name of owner/s of the land
(| The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
gO By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of f this form for more information) . 4
XX} No (J Yes - complete table G
10. identify if any of the following apply to the premises (tick applicable box/es)
{adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
[1] _ on strategic port land under the Transport Infrastructure Act 1994 - complete table |
L] _ ina tidal water area - complete table J
Table H Name of water body, watercourse or aquifer
1 |NOOSA WATERS CANAL
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
IX]No ["]Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 4
LOO 12. Does the proposal include new building work or operational work on the premises? (including any services) : . [[JNo_ §&] Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted 13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the end of this form for more information) [KX] No - Go to question 15 OD Yes 15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of the Sustainable Planning Act 2009? i] No LJ Yes - provide details below 16. List below all of the forms and supporting information that accompany this application (include all IDAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question does not apply for applications made online using Smart eDA) Method of lodgement to . Description of attachment or title of attachment assessment manager 1 |FORM6 over the counter 2 |CHECKLIST over the counter 3. | JOHN NORDEN PLANS over the counter 17. Applicant's declaration &X By making this application, | declare that all information in this application is true and correct (note: it is unlawful to provide false or misleading information). Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 5
LIL Notes for compieting this form Question 8: « Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. * Owner's consent is not required for a mobile and temporary ERA. Question 9: ¢ Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: . ¢ The Building and Construction Industry (Portable Long Service Leave) Act 1997 prescribes when the portable long service leave levy is payable. e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: ¢ The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. ¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qgleave.qlid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au. Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required by Parliament. This information may be stored in a departmental! database. The information collected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY O Date received tols\ 2 Reference numbers lo } 3 Le NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To: Council. | have been engaged as the private certifier for the . building work referred to in this application. Date of BSA Certification Building Name - arn engagement license number classification/s Application Details - IDAS form 1 Version 1.0 18 December 2009 14
Page 6
LiL
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
a QLeave Project [Amount ., {form sighted by|Name of officer who
Description of the work Number paid ($) Date paid assessment sighted the form
manager
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 7
nee Aeneas cSoEMgatem oni
* 2 : ps an - i
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
* complete Applicant details - IDAS form 1
. complete any other forms relevant to your application
oO * provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. :
This form can also be used for development on strategic portland under the Transport infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
(J building work - complete table A {X] operational work - complete table B
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
(] road works LJ stormwater {X) water infrastructure
Oo (] drainage Works (] earthworks {] sewerage infrastructure
{-] landscaping ( signage LJ clearing vegetation under the planning scheme
(J other - please specify below
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
[xX] development permit CJ preliminary approval (J both - specify below
!s the operational work necessary to facilitate the creation of new lots? (e.g. subdivision) -
XJ No (J Yes - specify the number of lots being created
Are there any current approvals associated with this application? (e.g. material change of use)
i] No 1] Yes - provide details below
Department of infrastructure and PETA)
Page 8
LUO 2. What is the dollar value of the proposed building work? (inc GST, materials and labour)| $ 14,640 Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 9
, CO 3. Confirm the following mandatory supporting information accompanies this application Confirmation of lodgement Method of lodgement All applications for operational works site plans drawn to scale which show the following: ¢ the location and site area of the land to which the application relates (relevant land) e the north point e the boundaries of the relevant land ¢ the allotment layout showing existing tots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, [XJconfirmed | over the counter building envelopes and existing or proposed open space (note: numbering is required for all lots) any existing or proposed easements on the relevant land and their function * any access limitation strips ¢ all existing and proposed roads and access points on the relevant fand a statement about how the proposed development addresses the local government's planning schemes and any other planning documents [XJ confirmed | over the counter relevant to the application Applications for operational works involving earthworks (filling and excavating) drawings showing: e existing and proposed contours * areas to be cut and filled * the location and level of any permanent survey marks or reference stations used as datum for the works [_] confirmed « the location of any proposed retaining walts on the relevant land and their height the defined flood level (if applicable) the defined fill level (if applicable) Applications for operational works involving roadworks drawings showing: existing and proposed contours e the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points ¢ information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) ¢ kerb fines including kerb radii (where not parailel to centreline) and tangent point changes (where not parallel to centreline) ¢ edge of pavement where kerb is not constructed L] confirmed position and extent of channelisation location and details of ail traffic signs, guideposts, guardrail and other street furniture pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycie paths location and details for access points, ramps and invert crossings changes in surfacing material Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 10
LU Confirmation of lodgement Method of lodgement Applications for operational works involving stormwater drainage drawings showing: e existing and proposed contours e drainage locations, diameters and class of pipe, open drains and easements Ci confirmed * manhole location, chainage and offset or co-ordinates and inlet and outlet invert levels e inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels Applications for operational works involving water reticulation drawings showing: e kerb lines or edge of pavement where kerb is not constructed ¢ location and levels of other utility services where affected by water reticulation works ~ pipe diameter, type of pipe and pipe alignment water main alignments (J confirmed water supply pump station details (if applicable) minor reservoir détails (if applicable) conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs Applications for operational works involving sewerage reticulation drawings showing: location of all existing and proposed services location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages . [confirmed design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable) eoeeosveeevete oe Applications for operational works involving street lighting drawings showing: e location of all light poles and service conduits location of ail other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment details of lighting levels LJ] confirmed Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 11
LILO of lodgemen Confirmation t Method of lodgement Applications for operational works involving public utility services drawings showing: any existing light poles and power poles any existing underground services details of proposed services alternation to existing services Liconfirmed Applications for operational works involving landscaping works e drawings showing: the location of proposed plant species a plant schedule indicating common and botanical names, pot sizes and numbers of plants planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences the proposed maintenance period irrigation system details C |confirmed Notes for completing this form: This form can also be used for development applications for building works or operational works assessable against the land use plan for Cairns airport land or Mackay airport !and. Whenever a planning scheme is mentioned, take it to mean the land use plan for the airport land. Privacy -please refer to your assessment manager for further details on the use of information recorded in this form. OFFICE USE ONLY Date Received Reference Numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 12
ess IL Integrated Development Assessment System checklist fy mapa Operational Works - IDAS Checklist 4 (Sustainable Planning Act 2009, version 1.0, 18 December 2009) - This checklist only applies when the development application seeks approval for operational works. You should complete all questions unless the checklist indicates otherwise. All planning and development applications require applicants to complete the following: * Applicant details --IDAS form 14 . any forms or mandatory supporting information identified as forming part of your application. if you are unsure of any answers to questions, phone or visit your local government, or go to the Department of Infrastructure and Planning's website, www.dip.qid.gov.au. The checklist and relevant sections do not need to be completed for applications relating only to building work requiring assessment against the Building Act 1975. ‘Part 1 - General questions 1.1 Is the proposed operational work assessable under the planning scheme? —X] No e You must complete Building and operational work assessable against a planning scheme - IDAS (0 Yes form 6 ° Continue on to question 1.3 1.2 Is the proposed operational work assessable under any state planning regulatory provisions? ix] No ClYes_ |e Go to question 1.4 Go to question 1.9 1.9 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable? . [—X] No C Yes . It is recommended that you complete part 6 of this checklist. 1.10 Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the clearing of native vegetation? ><} No OO Yes ° It is recommended that you complete part 7 of this checklist. 1.11 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake? [—X] No . It is recommended that you complete part 8 (starting from question 8.8) of this checklist. CJ Yes e It is recommended that you complete part 8 (starting from question 8.1) of this checklist. BYE nize and. Planning Gain
Page 13
» Ff HOO 8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump water)? —XJNo . You must complete Taking artesian or sub-artesian water - IDAS form 12. (Yes . This application requires assessment by the Department of Environment and Resource Management as a concurrence agency. 8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking overland flow water (other than using a water truck to pump water)? —K] No ° Go to question 8.12. LJ Yes er is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to pump water)? , No . Go to question 8.14 CL Yes 8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump water)? 7 7 a Bo . —X] No . Go to question 8.19 ( Yes 8.19 Is the proposed operational work for the following? for the construction of a referable dam as defined under the Water Supply (Safety Yes - C1 No and Reliability) Act 2008 to increase the storage capacity of a referable dam by more than 10 per cent & Yes (0 No If yes to any of the above you must complete Referable dam - IDAS form 16. This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency and you must give DERM a copy of the application Section reference: e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4 . Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4 . Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11 ° Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering with subartesian water as assessable) Wild Rivers Act 2005, section 43A ° Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with artesian water) ° Relevant wild river declarations Operational works - IDAS checklist 4 Version 1.0 December 2009
Page 14
od LILIL Notes for completing this form: . Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be completed for all development applications to be considered. . The Sustainable Planning Act 2009 is administered by the Department of infrastructure and Planning. Privacy - please refer to the assessment manager for further details on the use of information recorded in this form. Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims ail liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form. Operational works - IDAS checklist 4 Version 1.0 December 2009
Page 15
Sunshine Coast Checklist - Applications Involving Planning Regional Council Assessment and Operational Works Assessment RECEIPT OF IDAS APPLICATIONS AT TEWANTIN OFFICE This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter to determine if properly made. (This may not always be possible and can be further checked) i. APPLICATION. FORMS __. . = * J 1.1. Form 1 required for all application & Forms 2-32 1.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include 4 payment of appropriate fee. (Do not receipt at this stage) 1.1.2 In the case of an MCU or Op Works below the high-water mark, owner’s consent is required. 1 1.1.2.1 if there are multiple owners, the consent of each owner is required.. 1.1.2.2 _ If the owner of the land is a company, either ACN No, Company name (clearly indicated by signatory) or Company Seal required. IDAS ASSESSMENT. “CHECKLIST. i 2.1 Ensure that relevant checklist/s have been completed with regard to referrals = __—— (if applicable, not. mandatory) oe ee ee [4] — 2.2 Ensure correct IDAS Forms are provided where required for referral (ie most common are Form ‘tf for Assessable Vegetation, Form 24 for Contaminated land and Form 28 for Prescribed Tidal Works) ‘3. ENVIRONMENTALLY. RELEVANT. ACTIVITIES = 3.1. Ensure that Part G is completed if EPA referral is required. 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. (Refer Healthly Places for fees) 47 FORM 2~ REQUEST.TO._GHANGE APPROVAL 4.1 Ensure that relevant items have been checked and/or completed including information regarding applicant details along with owners consent if not current ‘owner of land as shdwn on Council records. If over multiple properties on one or more sites, consent of Body Corporate is required. &__ PLANS = " = 5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational | Works) accompany the application. In addition ensure that each set is complete. i ) 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. : , ‘6. SUPPORTING INFORMATION 6.1 Ensure that generally at feast 6 copies of any report accompanies the application (5 for Reconfiguration | and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping _ FEE _ Se 7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, accompanies the application or has been paid. « Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty ¢ Operational Works Assessment Operational Work not including Jetties Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. T g:Manduse\administrative processes\application checklist.doc
Page 16
[DASiRErERRANWAGENCIESILRIGG Sate | “Se oem
pleaser cremicaDASIChecklistoor "
‘Department oO n Roads (Concurrence or Advice)
e State Controlled Road
Dept Environmental Resource & Management
Advice
e Acid sulphate soils
« Wetlands
e Conservation estate
Concurrence
e Clearing of native vegetation on freehold land ;
¢ Environmentally Relevant Activity (for non-devolved Council as EPA)
e Contaminated land
=» Environmental Management/Contaminated Land Register
= UXO .
= Land recently used as a ‘notifiable activity’
= Industrial land changed to sensitive uses (eg school)
Coastal related development.
Koala habitat
Queensland Transport (Concurrence)
e Railway
. Public Passenger Transport
Energex or other responsible entity (Advice)
. Electricity Easements/Substations
DIP (Concurrence)
. SEQ Regional plan
VARIOUS
‘Department of Environmental Resource Management
For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.
Te: Vanduse\administrative processes\application checklist.doc
Page 17
Sunshine Coast LAND USE SECTION FEES Regional Council CIVICA TYPE RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520- Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - Code/lmpact MCU Consistent 521 Inconsistent 521 Assessment under Superseded Planning Scheme : §21 Modification to a Development Permit MOD DP 521 Extension of a Currency Period 521 - ~ Lot Reconfiguration RECONFIG 521 e Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW . . Half Hour 522 One Hour 522 ADVERTISING a + Purchase Advertised Applications §23 JETTIES . " Jetty Application Fee G 22 524 “Jetty Bond Lo. s00__ a5 54 : : . (Category 4) BONDS : : Performance Bond , 51 (Category 9) SEARCH FEE . e Search of Land Use Section file 412 - Liquor Licensing Request : 113 TOTAL $ Ip ZO NAME: e bie ey fore ADDRESS: fo BAY 1246 FILE NO: lol 26 DATE: Li [ 3 fe RECEIPT NO: i Steer "Signature of TP Officer: PD Sones AUTHORITY NO: d Le. GS. LPrrorweretoar. RB-. le/ 2010/ Poe /,
Page 18
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 > FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Page 19
_| $-0P . sammcecnory | POF Ob aw cage Ce) Vv z\ rraano on ‘ ua ONDRIOM INDAVT ~ oN =| = ONINVYS PYreT Py NV 1d SLIS g BS 8: ig OL0z HOR NOWHEY 8 F x : ava! penny | 'z 3 . 4 -<— i weuters 10504 tere ne . | * x -| a 908 509 Od | rum eon, a HOUVIN ALNNOD . jr ° & NS 2 ! Fmd ene, 1 eae een i ere t "* agivaeus MIN 000 See bt ZL¥ 107 —~ c pm - ‘SH sej}ejo0ssy 9 pipette i UsPJON UYOr ££ | . | W/L G17 Ala rue ! 3 - it gz SUILVM VSOON | iy Od JANG NSAVHSYOHS oo. an G6'ON ae WV GN ..ov3 SMaNOS cly 101 o T33LS 4 FINI. S OML ALLar aasodOud Gis asthe ge | dOSNIMN31¢8 c 8 aN is nee. is — “ONDIORO ScELE: Bor0 eanir a § te i § Oprcyiee 20 MS og uO ver LOT Dit ev4 3XALOZ9 OZLEZL ON CounOT] a3! woos ome ‘EHOLd suaating | BNO. 0. > Le OLS3TId ALLar wSOONM"! . : . . | pe surg wa ee cmon 2as:uu NAAWHAYOHS wacom 08 20% 00 HOM i i [| |! — & NOILVAA13 io! TT ws Mn | rt | : | ry | NOILVAJ14 | § ft 3009 ONMId - 6S1Z SV HLM wot fo Jt eee SONVGYOOOV NI G3TIVISNI 38 TIVHS S3id Ty ‘9 GUVZVH O1 G3LVFUL ONY QOOMGYVH G3A0UddY 3B TIVHS S31ld Ty ‘S3d OHV 990 Ta SLM WIN a GHVOr Ta — GHv 074 Ta 4030 TIWM 40 dOL OHV 00% Tu BAS GOO1d G3GNOITY WAND
Page 20
KOCKER:
76 x 38 HWD
1/76 x No14 TYPE 17
STAINLESS STEEL
SCREWS @ 460 CRS
WITH AS 2188 - PILING CODE
BreTONC AS
JETTYUSE: |
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS
WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec
2M16 88
200 x 75 HWD
eal ( 1 )
DETAIL
NOTES:
1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.
2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
STANDARDS FOR TIDAL WORKS.
3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.
No.95
SHOREHAVEN DRIVE
NOOSA WATERS
RABRINK PTY LTD T/A
w John Norden
& Associates
Ww AQN 010 263 877
SL
Suvctural / Chl Design Engineers
Pleas?
Poinciena Avenue
TRG
“too2 [=
Used in these records
10/0366 - Op Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.