Council archive · source document
10/0366 - Op Works - Jetty [As Published] · 142010.366
Sunshine Coast Checklist - Applications Involving Planning Regional Council Assessment and Operational Works Assessment RECEIPT OF IDAS APPLICATIONS AT TEWANTIN OFFICE This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter to determine if properly made. (This may not always be possible and can be further checked) i. APPLICATION. FORMS __. . = * J 1.1. Form 1 required for all application & Forms 2-32 1.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include 4 payment of appropriate fee. (Do not receipt at this stage) 1.1.2 In the case of an MCU or Op Works below the high-water mark, owner’s consent is required. 1 1.1.2.1 if there are multiple owners, the consent of each owner is required.. 1.1.2.2 _ If the owner of the land is a company, either ACN No, Company name (clearly indicated by signatory) or Company Seal required. IDAS ASSESSMENT. “CHECKLIST. i 2.1 Ensure that relevant checklist/s have been completed with regard to referrals = __—— (if applicable, not. mandatory) oe ee ee [4] — 2.2 Ensure correct IDAS Forms are provided where required for referral (ie most common are Form ‘tf for Assessable Vegetation, Form 24 for Contaminated land and Form 28 for Prescribed Tidal Works) ‘3. ENVIRONMENTALLY. RELEVANT. ACTIVITIES = 3.1. Ensure that Part G is completed if EPA referral is required. 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. (Refer Healthly Places for fees) 47 FORM 2~ REQUEST.TO._GHANGE APPROVAL 4.1 Ensure that relevant items have been checked and/or completed including information regarding applicant details along with owners consent if not current ‘owner of land as shdwn on Council records. If over multiple properties on one or more sites, consent of Body Corporate is required. &__ PLANS = " = 5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational | Works) accompany the application. In addition ensure that each set is complete. i ) 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. : , ‘6. SUPPORTING INFORMATION 6.1 Ensure that generally at feast 6 copies of any report accompanies the application (5 for Reconfiguration | and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping _ FEE _ Se 7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, accompanies the application or has been paid. « Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty ¢ Operational Works Assessment Operational Work not including Jetties Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. T g:Manduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0366 - Op Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.