20240510_NSC_Cover letter_M1717P_ Civil OPW minor change (2) · OPW12/0095.03

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

.




This minor change to the civil operational works approval seeks to reconcile the previous endorsed ‘generally in accordance’
changes to the car parking layout and incorporate the additional 7 visitor car spaces, as shown in Figure 1 above.
Accordingly, the approved engineering plan package endorsed as part of the generally in accordance plans has been
updated to include the 7 additional visitor car spaces.

It should also be noted that the applicant is also updating the approved plan package for the related MCU and Landscaping
operational works approvals.

Requested change and justification
To assist council with the assessment of the proposed minor change to the development approval, we have outlined the
consequential changes to the existing endorsed GIA plan package (the most recent set of plans) to reflect the proposed
change to development approval. For completeness, a copy of the original decision notice is attached for Council’s
reference (Refer to Attachment D).
.
The proposed amendments to conditions are shown as strike throughs (deletions) or bold - type (additions).

The following table identifies the latest amendments to the latest set plans endorsed as generally in accordance with the
approval (Council ref: OPW12/0095.02) and to be incorporated into section 5 Approved Plans of the decision notice.

    Plan No.               Rev      Plan/Document Name                            Date
    M1717E5-L01            A        Construction Staging Plan, prepared by        28 February 2018
                                    JFP Consulting Engineers
    M1717E5-EW01           C        Earthworks Layout Plan, prepared by JFP       4 May 2018
                                    Consulting Engineers
    M1717E5-EW02           B        Earthworks Details Plan, prepared by JFP      27 April 2018
                                    Consulting Engineers
    M1717E5-R01            DF       Roadworks Layout Plan, prepared by JFP        8 June 2021 18
                                    Consulting Engineers                          April 2024
    M1717E5-R02            A        Roadworks Details Plan, prepared by JFP       28 February 2018
                                    Consulting Engineers
    M1717E5-R03            FH       Roadworks Intersection Details Plan,          8 June 2021 18
                                    prepared by JFP Consulting Engineers          April 2024
    M1717E5-R04            A        Roadworks Longitudinal Sections Swallow       28 February 2018
                                    Street, prepared by JFP Consulting
                                    Engineers
    M1717E5-R05            A        Roadworks Cross Sections Swallow Street,      28 February 2018
                                    prepared by JFP Consulting Engineers
    M1717E5-R06            B        Roadworks Longitudinal Sections Blue          10 January 2020
                                    Gum Street, prepared by JFP Consulting
                                    Engineers
    M1717E5-R07            A        Roadworks Cross Sections Blue Gum             28 February 2018
                                    Street, prepared by JFP Consulting
                                    Engineers
    M1717E5-R08            B        Roadworks Sections Silver Gull Boulevard,     27 April 2018
                                    prepared by JFP Consulting Engineers




JFP Ref: M1717E                                                                                                 Page 3


[OCR of page images]
This minor change to the civil operational works approval seeks to reconcile the previous endorsed ‘generally in accordance’
changes to the car parking layout and incorporate the additional 7 visitor car spaces, as shown in Figure 1 above.
Accordingly, the approved engineering plan package endorsed as part of the generally in accordance plans has been
updated to include the 7 additional visitor car spaces.

It should also be noted that the applicant is also updating the approved plan package for the related MCU and Landscaping
operational works approvals.

Requested change and justification

To assist council with the assessment of the proposed minor change to the development approval, we have outlined the
consequential changes to the existing endorsed GIA plan package (the most recent set of plans) to reflect the proposed
change to development approval. For completeness, a copy of the original decision notice is attached for Council’s
reference (Refer to Attachment D).

The proposed amendments to conditions are shown as strike throughs (deletions) or bold - type (additions).

The following table identifies the latest amendments to the latest set plans endorsed as generally in accordance with the
approval (Council ref: OPW12/0095.02) and to be incorporated into section 5 Approved Plans of the decision notice.

Plan No. Rev Plan/Document Name Date

M1717E5-L01 A Construction Staging Plan, prepared by 28 February 2018
JFP Consulting Engineers

M1717E5-EW01 Cc Earthworks Layout Plan, prepared by JFP_ | 4 May 2018
Consulting Engineers

M1717E5-EW02 B Earthworks Details Plan, prepared by JFP_ | 27 April 2018
Consulting Engineers

M1717E5-RO1 BF Roadworks Layout Plan, prepared by JFP SJune2024 18
Consulting Engineers April 2024

M1717E5-RO2 A Roadworks Details Plan, prepared by JFP 28 February 2018
Consulting Engineers

M1717E5-RO3 FH Roadworks Intersection Details Plan, Stune 2024 18
prepared by JFP Consulting Engineers April 2024

M1717E5-R04 A Roadworks Longitudinal Sections Swallow | 28 February 2018
Street, prepared by JFP Consulting
Engineers

M1717E5-ROS A Roadworks Cross Sections Swallow Street, | 28 February 2018
prepared by JFP Consulting Engineers

M1717E5-RO6 B Roadworks Longitudinal Sections Blue 10 January 2020
Gum Street, prepared by JFP Consulting
Engineers

M1717E5-RO7 A Roadworks Cross Sections Blue Gum 28 February 2018
Street, prepared by JFP Consulting
Engineers

M1717E5-RO8 B Roadworks Sections Silver Gull Boulevard, | 27 April 2018

prepared by JFP Consulting Engineers

JFP Ref: M1717E Page 3

Used in these records

About this file

File size
373 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20240510_NSC_Cover letter_M1717P_ Civil OPW minor change (2).pdf · 373 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.