Referral Agency Response for DA6226 · MCU25/0022
ATTACHMENT 1 – REFERRAL AGENCY (ADVICE) RESPONSE
Powerlink Queensland supports this application subject to the inclusion of the following conditions in the
Assessment Manager’s Decision Notice.
No. Condition Timing Reason
1 The development must be carried out At all times. To ensure that the
generally in accordance with the reviewed development is carried out
plans detailed in Table 1. generally in accordance with
the plans of development
submitted with the application.
2 The statutory clearances set out in the At all times. To ensure that the purpose of
Electrical Safety Regulation 2013 must be the Electrical Safety Act 2002
maintained during construction and is achieved, and electrical
operation. No encroachment within the safety requirements are met.
statutory clearances is permitted.
3 Compliance with the terms and conditions of At all times. To ensure that the existing
the easement dealing no. shown in the rights contained in the
heading of this letter. registered easement dealings
are maintained.
4 Compliance with the generic requirements in At all times. To ensure that the purpose of
respect to proposed works in the vicinity of the Electrical Safety Act 2002
Powerlink Queensland infrastructure as is achieved, and electrical
detailed in the enclosed Annexure "A". safety requirements are met.
To ensure the integrity of the
easement is maintained.
Advice to Council and the Applicant
1. Powerlink have assessed the awning/shelter structure and determined that it is not permitted in its current
location on the easement. Consequently, it has been excluded from our referral response. Powerlink's
preference is to remove or relocate the structure to the side of the easement at such time as the vacant easement
is required for future transmission purposes.
Unfortunately, Powerlink have been unable to reach a feasible arrangement with the applicant that will uphold the
relocation or removal of the structure should ownership change prior to the removal being requested by
Powerlink. Until such time as a resolution can be reached, the structure will be recorded as an unapproved co-
use development of the transmission easement.
2. Should any doubt exist in maintaining the prescribed clearance to electrical infrastructure the applicant is obliged
under the Electrical Safety Act 2002 to seek advice from Powerlink.
3. In order for Powerlink to maintain and operate a safe and reliable supply of electricity, we require unrestricted 24-
hour access to our corridors and infrastructure.
We will require practical access (typically by 4WD vehicle – but to standard no less than existing) to the Powerlink
structures.
If it is envisaged that there will be any interference or alteration to our current access arrangements prior, during
or after the completion of your works, we require that the applicant contacts our Works Control Manager
Easements (Mr Ehren Wittmer – ph 0418 233 916) to formalise unrestricted 24-hour access arrangements.
33 Harold Street Virginia QLD 4014 Australia | PO Box 1193 Virginia QLD 4014 Australia
07 3898 4090 | | [email protected] | powerlink.com.au
Powerlink Queensland is the registered business name of the Queensland Electricity Transmission Corporation Limited. ABN 82 078 849 233
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response for DA6226.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.