Skip to the record
Accept no substitutions.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

 Insert on
Noosa   report title here
           Weyba
  InsertStudy
Flood    project name
  Insert job reference
5101/19-03




  Prepared for
  Northbrook Corporation Pty Ltd

  16 September 2013
Full text of sections 2 to 79 (of 130)

Section 2

Noosa on Weyba
Flood Study



                                                                                                                     Cardno (Qld) Pty Ltd
                                                                                                                      ABN 57 051 074 992
                                                                                                    Level 11 Green Square North Tower
                                                                                                                     515 St Paul’s Terrace
                                                                                                               Fortitude Valley Qld 4006
                                                                                                      Locked Bag 4006 Fortitude Valley
                                                                                                             Queensland 4006 Australia
                                                                                                               Telephone: 07 3369 9822
                                                                                                                Facsimile: 07 3369 9722
                                                                                                          International: +61 7 3369 9822
                                                                                                                [email protected]
                                                                                                                     www.cardno.com.au




Document Information
Prepared for                       Northbrook Corporation Pty Ltd
Project Name                       Noosa on Weyba
File Reference                     O:\5101-19-03\wp\R1v4 Flood Study\Flood Study v4.doc
Job Reference                      5101/19-03
Date                               16 September 2013



Document Control
Version            Date                    Author                                Author        Reviewer                               Reviewer
                                                                                 Initials                                             Initials
       1           23 October 2012         Nadia Guterres                        NG            Michael Della                          MD

       2           29 October 2012         Nadia Guterres                        NG            Michael Della                          MD

       3           19 April 2013           Nadia Guterres                        NG            Michael Della                          MD

       4           16 September 2013       Nadia Guterres                                      Michael Della




"© 2013 Cardno All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno
and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on
any media to any person without the prior written consent of Cardno.”




Northbrook Corporation Pty Ltd                               Version 4                                                 16 September 2013
Flood Study v4 2.doc                                   Commercial in Confidence                                                   Page ii

Section 3

Noosa on Weyba
Flood Study




Table of Contents
1         Introduction                                                                      1
2         Site Description                                                                  2
3         Hydraulic Modelling                                                               3
          3.1          Available Flood Modelling                                            3
          3.2          TUFLOW Model                                                         3
                       3.2.1     Summary                                                    3
                       3.2.2     Topography and Grid Size                                   3
                       3.2.3     Roughness Values                                           4
                       3.2.4     Model Inflows                                              4
                       3.2.5     Boundary Conditions                                        4
                       3.2.6     Model Runs                                                 5
                       3.2.7     Time Step                                                  7
                       3.2.8     Existing Structures                                        7
          3.3          Model Calibration                                                    9
4         Hydrologic Model                                                                11
          4.1          Rational Method                                                     11
                       4.1.1    Sub-catchments                                             11
                       4.1.2    Times of Concentration                                     11
                       4.1.3    Rainfall Intensity                                         11
                       4.1.4    Fraction Impervious                                        11
                       4.1.5    Runoff Coefficient                                         11
                       4.1.6    Resultant Peak Flows                                       12
          4.2          WBNM Model                                                          12
                       4.2.1    Summary                                                    12
                       4.2.2    Developed Case                                             13
          4.3          PMF Inflows                                                         15
5         TUFLOW Calibration                                                              16
          5.1          February 2012 Event                                                 16
6         Existing Case Results                                                           18
          6.1          Peak Water Levels                                                   18
          6.2          Peak Flows                                                          18
          6.3          Peak Velocities                                                     18
7         Proposed Development                                                            19
          7.1          Proposed Development                                                19
          7.2          Proposed Structures                                                 19
                       7.2.1   PMF Trafficability Requirements                             20
                       7.2.2   Structure Details                                           20
          7.3          Proposed Stormwater Treatment                                       21
8         Developed Case Results                                                          22
          8.1          Peak Water Levels                                                   22
          8.2          Peak Flows                                                          23
          8.3          Peak Velocities                                                     23

Northbrook Corporation Pty Ltd                         Version 4            16 September 2013
Flood Study v4 2.doc                             Commercial in Confidence             Page iii

Section 4

Noosa on Weyba
Flood Study



          8.4              Sensitivity Analysis                                                                                                                    24
                           8.4.1     Waterway Corridor Revegetation                                                                                                24
                           8.4.2     Culvert Blockage                                                                                                              24
                           8.4.3     Severe Culvert Blockage                                                                                                       24
          8.5              Proposed Emergency Evacuation Routes                                                                                                    26
9         Flood Storage                                                                                                                                            27
          9.1              Reduction in Flood Storage                                                                                                              27
          9.2              Flood Impact of Cumulative Filling                                                                                                      28
10        Conclusion                                                                                                                                               30


Tables
Table 3-1              TUFLOW Model Runs ................................................................................................................... 6
Table 4-1              Bransby Williams Time of Concentration Calculations ............................................................... 11
Table 4-2              Rational Method Peak Flows ...................................................................................................... 12
Table 4-3              WBNM Sub-catchments – Existing Case .................................................................................... 12
Table 4-4              Comparison to Rational Method Flows ....................................................................................... 13
Table 4-5              WBNM Sub-catchments – Developed Case ............................................................................... 14
Table 4-6              100 Year ARI Local Peak Flows ................................................................................................. 14
Table 4-7              PMF Rainfall ................................................................................................................................ 15
Table 5-1              Survey Levels Compared to the TUFLOW Results .................................................................... 16
Table 8-1              Sensitivity Analysis – Culvert Blockage ...................................................................................... 25
Table 9-1              Flood Storage within Lot 11 ........................................................................................................ 27
Table 9-2              Cumulative Flood Impact ............................................................................................................ 28




Figures
Figure 1               Site Location
Figure 2               WBNM Sub-catchments
Figure 3               TUFLOW Model Setup
Figure 4               TUFLOW Comparison Points
Figure 5               Existing Case DEM
Figure 6               100 Year ARI Existing Case Peak Water Level (Local and Regional)
Figure 7               100 Year ARI Existing Case Peak Depth (Local and Regional)
Figure 8               100 Year ARI Existing Case Peak Velocity (Local and Regional)
Figure 9               10 Year ARI Existing Case Peak Water Level (Local and Regional)
Figure 10              2 Year ARI Existing Case Peak Water Level (Local and Regional)
Figure 11              February 2012 Flood Event – Peak Water Level
Figure 12              100 Year ARI Existing Case Peak Water Level with Climate Change
Figure 13              Proposed Development Plan
Figure 14              Evacuation Routes
Figure 15              Developed Case DEM
Figure 16              100 Year ARI Developed Case Peak Water Level (Local and Regional)
Figure 17              100 Year ARI Developed Case Peak Depth (Local and Regional)
Figure 18              100 Year ARI Developed Case Peak Velocity (Local and Regional)
Figure 19              10 Year ARI Developed Case Peak Water Level (Local and Regional)

Northbrook Corporation Pty Ltd                                             Version 4                                                           16 September 2013
Flood Study v4 2.doc                                                 Commercial in Confidence                                                            Page iv

Section 5

Noosa on Weyba
Flood Study



Figure 20              2 Year ARI Developed Case Peak Water Level (Local and Regional)
Figure 21              100 Year ARI Developed Case Peak Water Level with Climate Change
Figure 22              Flood Level Impact – Design Event 1 (100 Year ARI Local)
Figure 23              Flood Level Impact – Design Event 2 (50 Year ARI Local)
Figure 24              Flood Level Impact – Design Event 3 (20 Year ARI Local)
Figure 25              Flood Level Impact – Design Event 4 (10 Year ARI Local)
Figure 26              Flood Level Impact – Design Event 5 (5 Year ARI Local)
Figure 27              Flood Level Impact – Design Event 6 (2 Year ARI Local)
Figure 28              Flood Level Impact – Design Event 7 (1 Year ARI Local)
Figure 29              Flood Level Impact – Design Event 8 and 9 (100 Year ARI Storm Surge)
Figure 30              Flood Level Impact – Design Event 10 (100 Year ARI Regional)
Figure 31              Flood Level Impact – Design Event 11 (50 Year ARI Regional)
Figure 32              Flood Level Impact – Design Event 12 (20 Year ARI Regional)
Figure 33              Flood Level Impact – Design Event 13 (10 Year ARI Regional)
Figure 34              Flood Level Impact – Design Event 14 (5 Year ARI Regional)
Figure 35              Flood Level Impact – Design Event 15 (2 Year ARI Regional)
Figure 36              Sensitivity Analysis – Impact of Revegetation of Waterway Corridor
Figure 37              Sensitivity Analysis – Impact of Culvert Blockage (20%)
Figure 38              Sensitivity Analysis – Impact of Culvert Blockage (100%)
Figure 39              Developed Case PMF (Local) Peak Depth
Figure 40              Developed Case PMF (Local) Peak Depth



Appendices
Appendix A                Concept Development Plan
Appendix B                Noosa River Flood Study Cross-sections
Appendix C                Sunshine Coast Regional Council Defined Flood Levels
Appendix D                Rainfall Intensities
Appendix E                February 2012 Flood Survey Levels
Appendix F                Peak Water Levels
Appendix G                Peak Flows
Appendix H                Peak Velocities
Appendix I                Regional Flood Assessment of Cumulative Fill
Appendix J                Response to Information Request




Northbrook Corporation Pty Ltd                            Version 4                           16 September 2013
Flood Study v4 2.doc                                Commercial in Confidence                            Page v

Section 6

Noosa on Weyba
Flood Study




1                      Introduction
This report has been updated in response to the Request for Information (RFI) from Sunshine Coast
                            th
Regional Council dated 28 February 2013. The responses to this request are contained within the report.
We have provided an index in Appendix J, which locates the responses to the relevant RFI items within the
report for ease of reference.
The subject site encompasses the following lots:
The J & K Hofmann land:
      Lot 7 on RP46782           1.99 ha
      Lot 2 on RP160983          93.1 ha
      Lot 2 on SP179590          12.5 ha
      Lot 53 on SP163571         110.0 ha
The Northbrook Pty Ltd land:
      Lot 1667 on M3772          44.4 ha
      Lot 11 on RP893393         40.7 ha
      Lot 12 on RP893393         0.61 ha
It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used as parks and lake buffer zone and the remaining 77 percent of the site dedicated as green space and
conservation areas. The concept master plan for the development is shown in Appendix A.
The aim of this report is to:
      determine the relevant flood levels for the site, including local and regional flood events for use in
       master planning, to ensure that all lots and roads have sufficient flood immunity;
      look at the potential impact of development on peak flood levels and flows for neighbouring areas;
      determine mitigation strategies that would be required to reduce any impact on neighbouring areas;
      determine the appropriate flood levels for the site taking into account climate change, i.e. increased
       rainfall intensity and a rise in sea level of 0.8 metres;
      size culvert crossings to ensure that the site is accessible during a Probable Maximum Flood (PMF)
       event, as requested by Council; and

                                                                     th
       address issues raised in the RFI from Council, dated the 28 February 2013.
Measures to improve flood levels and access for lots located on the neighbouring Lake Entrance Boulevard
are also proposed.
Regional flood modelling has been conducted of the Noosa River in Mike 11. The results of this study are
outlined in the Noosa River Flood Study (JWP, 1995). This modelling was recently updated by Council to
use Version 2010 of Mike 11 and was run for several more storm durations. The cross-sections used in this
modelling are shown in Appendix A. This modelling does not include the local tributaries located within or
adjacent to the site, and is therefore not of sufficient quality to use to determine flood levels throughout the
site. This regional flood modelling does however take into account the impact of storm surge.
The flow patterns and interactions between the different creeks and Lake Weyba are quite complex and so
the software used for this analysis was TUFLOW, which is a two and one dimensional flood model.
Since the original application was made the locations of the road crossings across Keyser Creek have been
modified. This has addressed some of the concerns from the RFI.



Northbrook Corporation Pty Ltd                      Version 4                                  16 September 2013
Flood Study v4 2.doc                          Commercial in Confidence                                   Page 1

Section 7

Noosa on Weyba
Flood Study




2                      Site Description
The J & K Hofmann land is bounded by Hollett Road to the south, Eenie Creek to the north and it includes
lots on both sides of Walter Hay Drive. Tributaries of Eenie Creek run through or adjacent to these lots. The
site is currently used for rural purposes and the majority of the site is densely vegetated with sections that
have been cleared for grazing purposes. The site is relatively steeply sloped, and the tributaries are well
defined, except for the area just to the north of Hollett Road where the ground is fairly flat and flows disperse
over a wide area.
The Northbrook Pty Ltd land is located to the south-east of the J & K Hofmann land and is bounded by
Tidswell Road to the west and Lake Weyba to the east. The site is currently used for rural purposes. The
majority of Lot 11 has been cleared with sections of remnant vegetation. A tributary of Lake Weyba,
historically known as Keyser Creek, is located within Lot 11, and drains from south to north. Keyser Creek,
within Lot 11 is relatively flat and low lying with levels ranging from 0.7 to 1.1 mAHD. A track located in an
existing council road reserve along the northern boundary of the site currently acts as a bund controlling
outflows. It has a minimum level of 1.14 mAHD. At the southern boundary of the site the level of Keyser
Creek rises sharply to a minimum level of around 1.8 mAHD. The western section of Lot 11 is relatively flat
with a grade of around 1 percent and levels from 0.7 to 6.5 mAHD. The central section of Lot 11 drains
towards Keyser Creek and is generally more steeply sloped with levels up to 14.5 mAHD. The eastern
section of Lot 11 drains towards Lake Weyba and is generally steeply sloped with a grade of around 5
percent, and levels from 0.5 to 14.5 mAHD.
Lake Weyba is connected to Noosa River via Weyba Creek.




Northbrook Corporation Pty Ltd                     Version 4                                    16 September 2013
Flood Study v4 2.doc                         Commercial in Confidence                                     Page 2

Section 8

Noosa on Weyba
Flood Study




3                      Hydraulic Modelling
3.1                    Available Flood Modelling
Regional flood modelling has been conducted of the Noosa River in Mike 11. The results of this study are
outlined in the Noosa River Flood Study (JWP, 1995). This modelling was recently updated by Council to
use Version 2010 of Mike 11 and was run for several more storm durations. The cross-sections used in this
modelling are shown in Appendix A. This modelling does not include the local tributaries, including Eenie
Creek and Keyser Creek, and is therefore not of sufficient quality to use to determine flood levels throughout
the site. This regional flood modelling does however take into account the impact of storm surge. The flood
search certificate for the site is provided in Appendix B. These flood levels are taken from the updated
regional flood modelling. The levels are:
      100 year ARI = 2.09 mAHD
      20 year ARI = 1.53 mAHD
      10 year ARI = 1.45 mAHD
A storm tide study of the Noosa River has recently been conducted. However, at the time of writing, the final
results of this analysis were not available from Sunshine Coast Regional Council (SCRC). The storm tide
levels used as tailwater conditions in the Noosa River Flood Study (JWP, 1995) were:
      100 year ARI = 1.8 mAHD
      20 year ARI = 1.5 mAHD
The peak 100 year regional flood level was a combination of 100 year Average Recurrence Interval (ARI)
inflows and the 20 year ARI storm surge (per comm. Geoff Newell, SCRC). The 30 hour storm was the peak
regional flood event for Lake Weyba.

3.2                    TUFLOW Model
3.2.1                  Summary
The flow patterns and interactions between the different creeks and Lake Weyba are quite complex and so
the software used for this analysis was TUFLOW, which is a two and one dimensional flood model. The
model extent included Eenie Creek and its tributaries, Keyser Creek, Lake Weyba and Weyba Creek. Lake
Weyba and Weyba Creek were modelled in 1D using the Mike 11 cross-sections from the regional flood
model, and trimmed where necessary to avoid duplication of storage. The model extended downstream to
Section Weyba 6.5, which is located at Weyba Road. The remaining area used Aerial Laser Survey (ALS)
obtained from the Department of Environment and Heritage Protection (DEHP), formerly DERM.
The TUFLOW model was validated against the February 2012 flood event which resulted in significant
inundation of properties along Lake Entrance Boulevard.
TUFLOW Version 2011-09-AF iSP was used in the analysis.

3.2.2                  Topography and Grid Size
The digital terrain model (DTM) created in 12d used ALS data obtained from DEHP. This data was part of a
larger dataset obtained for the SCRC in 2008/09 by Schlencker Mapping Pty Ltd using LiDAR technology.
The reported accuracy of this data is:
Vertical data:
Spatial Accuracy: 0.15m @ 67 % CI
Horizontal data:
Spatial Accuracy: 0.2 @ 67 % CI


Northbrook Corporation Pty Ltd                          Version 4                            16 September 2013
Flood Study v4 2.doc                              Commercial in Confidence                             Page 3

Section 9

Noosa on Weyba
Flood Study



The permanent waterbodies, as shown on aerial photography, of Eenie Creek and Keyser Creek were
manually defined in TUFLOW as minimum z shapes. This was necessary to reduce some triangulation
errors in the DEM which created false blockages across the waterway and created instabilities in the results.
Similarly other flow blockages in the tributaries, caused by triangulation errors, were removed by inserting
gully lines. The ALS data of the waterway does not penetrate the water surface, and so the storage and flow
capacity below this level is not included. This may result in an overestimation of the minor flood levels.
However, the impact is expected to be negligible for the major flood events.
The grid size used in TUFLOW was 5 metres. This is a grid size typical of urban areas and results in surface
levels at 2.5 metre intervals being used in the modelling.
For the developed case DTM, the earthworks model created in 12d was overlaid onto the existing surface
grid and re-exported.

3.2.3                  Roughness Values
The Manning’s n roughness values used in the 1D sections of Lake Weyba and Weyba Creek were kept at
the same values as those used in the Mike 11 modelling. The values varied at different sections but were
typically:
      n = 0.025 for waterway areas; and
      n = 0.10 for dense vegetation.
The Manning’s n roughness values used in the 2D grid were:
      n = 0.03 for waterway areas;
      n = 0.12 for dense vegetation;
      n = 0.20 for urban areas;
      n = 0.05 for grass areas with a few trees; and
      n = 0.04 for roadway crossings
A sensitivity analysis was conducted with a roughness value of 0.15 for dense vegetation areas. This
resulted in an increase in 100 year ARI peak water levels of around 100 to 150mm along Eenie Creek and
around 50mm along Keyser Creek. The impacts in Keyser Creek were not as great due to the low velocities
in this area.
The roughness values used in TUFLOW are shown in Figure 3.

3.2.4                  Model Inflows
The inflows into the TUFLOW model were taken from a WBNM model, which was compared to peak flows
using the Rational Method. The location of the inflows is shown in Figure 3. The TUFLOW inflows were
either inserted as 2D SA inflows, 2D boundary inflows or 1D inflows. The catchment delineation in the area
surrounding the site was different to that used in the regional flood modelling as there was insufficient detail
in the regional modelling. The developed case inflows were modified as required due to the increase in
impervious area and changes in catchment delineation. Further detail of the WBNM model is given in
Section 4.
For the climate change scenario, the inflows were increased by 20 percent to account for an intensification of
rainfall. This is the amount specified by the Inland Flooding Study (DERM, 2010) for the planning year 2090.

3.2.5                  Boundary Conditions
For local flood events the initial water level and tailwater level was set at Mean High Water Springs (MHWS)
as recommended by SCRC. The MHWS level at Munna Point, which is the closest permanent tidal datum, is
0.36 mAHD (Maritime Safety Queensland, 2012). This lower tailwater level ensures that the impact of
development is not drowned out. A sensitivity analysis was run using a tailwater level equal to Highest
Astronomical Tide (HAT) of 0.68 mAHD. This resulted in an increase in 100 year ARI peak water levels of
around 10mm, which was not considered significant.


Northbrook Corporation Pty Ltd                      Version 4                                  16 September 2013
Flood Study v4 2.doc                          Commercial in Confidence                                   Page 4

Section 10

Noosa on Weyba
Flood Study



The 100 year ARI local flood event was also run in combination with storm surge as a tailwater condition, to
check the 100 year ARI levels throughout the site. The 100 year ARI local flows were combined with the 20
year ARI storm surge level of 1.5 mAHD. The 20 year ARI local flows and the 100 year ARI storm surge
level of 1.8 mAHD were also run. The Noosa River Flood Study (JWP, 1995) estimates that both of these
combinations are equivalent to a 100 year ARI event. The 100 year ARI inflows with the 20 year ARI storm
surge resulted in the highest peak water levels throughout the site.
For the regional flood events the initial water level and tailwater level were set as the hydrograph from the
Mike 11 model at Weyba 6.5 for the 30 hour event. The hydrographs were scaled to match the reported
peak levels from the upgraded modelling. The peak tailwater levels adopted were:
      100 year ARI = 2.04 mAHD (20 year ARI storm tide tailwater);
      50 year ARI = 1.76 mAHD (10 year ARI storm tide tailwater);
      20 year ARI = 1.52 mAHD (5 year ARI storm tide tailwater);
      10 year ARI = 1.39 m AHD (HAT tailwater);
      5 year ARI = 1.33 m AHD (HAT tailwater); and
      2 year ARI = 1.26 m AHD (HAT tailwater).
For the climate change scenario a sea level rise of 0.8m was adopted, as recommended by the Queensland
Coastal Plan (2012) for the year 2100. The tailwater level for the 100 year ARI local event was therefore set
at 2.3 mAHD, which is the current 20 year ARI storm surge level plus 0.8 metres. An equivalent 100 year
ARI event (as indicated in the Noosa River Flood Study) is considered to be the 20 year ARI local flows with
a 100 year ARI storm surge level. This scenario, which had a tailwater level of 2.6 mAHD, was therefore
also modelled. The impact of sea level rise on the regional flood event, which would then be adopted as the
tailwater condition, was not available. However, given that the local flood levels throughout the site are
typically higher than the regional flood levels, it was not considered necessary to model this event.
For the Probable Maximum Flood (PMF) event, a tailwater condition of 2.68 mAHD was adopted. This is the
1000 year ARI storm surge level as defined by the Queensland Climate Change and Community
Vulnerability to Tropical Cyclones (2004) report. This is the tailwater condition currently being used by
Council to define the PMF event. It should be noted that the Noosa River Flood Study used the 100 year
ARI storm surge level in combination PMF river inflows as the PMF event. Therefore the current PMF
scenario is a conservative assumption.

3.2.6                  Model Runs
The model runs conducted for the analysis are listed in Table 3.1 below. The local flood events were run for
a range of storm durations. The peak events were the 1.5 and 24 hour events, with the shorter duration
event resulting in peaks only in upstream parts of the model. However, for the 24 hour event the peak
generally occurred between 2.5 and 4 hours, which was similar to the calculated times of concentration for
the catchments (refer Section 4.1).
The regional flood event has a time of concentration around 30 hours (per comm. Geoff Newell, SCRC).
Therefore for the 100 year ARI regional storm event, the coincident local event (which has a time of
concentration of around 3 hours) is approximately equal to the 1 year ARI local storm event. It was therefore
decided to use the 30 hour local storm and run it concurrently with the 30 hour regional storm as it resulted in
higher regional flood levels.




Northbrook Corporation Pty Ltd                     Version 4                                   16 September 2013
Flood Study v4 2.doc                         Commercial in Confidence                                    Page 5

Section 11

Noosa on Weyba
Flood Study



Table 3-1              TUFLOW Model Runs

     Model Run                   Local Inflows                 Tailwater Level       Resultant ARI
      Number                                                                              (y)
 Local Events - MHWS
            1                    100 year ARI                      MHWS                  100
            2                     50 year ARI                      MHWS                   50
            3                     20 year ARI                      MHWS                   20
            4                     10 year ARI                      MHWS                   10
            5                     5 year ARI                       MHWS                   5
            6                     2 year ARI                       MHWS                   2
            7                     1 year ARI                       MHWS                   1
 100 Year ARI Local Event – Storm Surge
            8                     20 year ARI               1.8 mAHD – 100 year          100
                                                                 storm surge
            9                    100 year ARI            1.5 mAHD - 20 year storm        100
                                                                 surge
 Regional Events
           10                  100 year, 30 hour             Regional 100 year,          100
                                                                  30 hour
                                                            (peak of 2.04 mAHD)
           11                   50 year, 30 hour              Regional 50 year,           50
                                                                  30 hour
                                                            (peak of 1.76 mAHD)
           12                   20 year, 30 hour              Regional 20 year,           20
                                                                  30 hour
                                                            (peak of 1.52 mAHD)
           13                   10 year, 30 hour              Regional 10 year,           10
                                                                  30 hour
                                                            (peak of 1.39 mAHD)
           14                   5 year, 30 hour               Regional 5 year,            5
                                                                  30 hour
                                                            (peak of 1.33 mAHD)
           15                   2 year, 30 hour               Regional 2 year,            2
                                                                  30 hour
                                                            (peak of 1.26 mAHD)
 Probable Maximum Flood
           16                        PMF                   2.68 mAHD - 1000 year         PMF
                                                                Storm Surge
 Climate Change
           17                    20 year ARI –              2.6 mAHD – 100 year        100 (CC)
                               increased by 20%              storm surge + 0.8m

           18               100 year ARI - increased      2.3 mAHD - 20 year storm     100 (CC)
                                    by 20%                      surge + 0.8m


The initial water levels in TUFLOW were set to equal the downstream tailwater condition. The existing dam
located within the Hofmann site was assumed to be full prior to the start of the storm events.



Northbrook Corporation Pty Ltd                               Version 4                               16 September 2013
Flood Study v4 2.doc                                   Commercial in Confidence                                Page 6

Section 12

Noosa on Weyba
Flood Study



The modelled PMF event addresses local flooding only. The regional Noosa River PMF event will result in
the peak water levels for Lake Weyba and the downstream section of the site. Council has advised that the
latest PMF level for Lake Weyba is 4.23 mAHD (per comm. Geoffrey Newell). This flood level will therefore
also need to be referenced when defining road levels that will be used as emergency evacuation routes.

3.2.7                  Time Step
The time step adopted in the modelling was 3 seconds for the 2D area and 1 second for the 1D area. For
TUFLOW modelling it is recommended that the 2D time step not be less than a quarter of the grid size,
which would be 1.25 seconds in this instance. A model requiring a smaller time step can indicate
instabilities.
The resultant continuity error in the TUFLOW modelling was around 0.15 percent, which indicates that the
model was very stable.

3.2.8                  Existing Structures
The existing culvert crossings of Lake Entrance Boulevard and Aspera Place were entered into the model as
1D structures. The details of the culvert crossings were taken from SCRC online mapping. Where no
information was available for the invert levels or sizes, the details were taken from site inspection. The
photographs below show the culvert crossings in this area.




Photo 1                Lake Entrance Boulevard – Crossing 1




Northbrook Corporation Pty Ltd                          Version 4                         16 September 2013
Flood Study v4 2.doc                              Commercial in Confidence                          Page 7

Section 13

Noosa on Weyba
Flood Study




Photo 2                Lake Entrance Boulevard – Crossing 2




Photo 3                Aspera Place Crossing




Northbrook Corporation Pty Ltd                          Version 4            16 September 2013
Flood Study v4 2.doc                              Commercial in Confidence             Page 8

Section 14

Noosa on Weyba
Flood Study




The structures were:
      Lake Entrance Boulevard Crossing 1 – 3/2100 by 1800mm RCBC (upstream IL = 0.6 mAHD,
       downstream IL = 0.55 mAHD, length = 23.7m);
      Lake Entrance Boulevard Crossing 2 – 4/2700 by 900mm RCBC (upstream IL = 1.19 mAHD,
       downstream IL = 1.18 mAHD, length = 22.3m);
      Lake Entrance Boulevard Crossing 3 – 2/750mm RCPs (upstream IL = 1.038 mAHD, downstream IL =
       0.816 mAHD, length = 37.1m); and
      Aspera Place Crossing – 10/1800mm RCPs (upstream IL = 2.40 mAHD, downstream IL = 2.30 mAHD,
       length = 20m).
The road height levels were taken from the DTM.
The third crossing of Lake Entrance Boulevard appears to be deliberately undersized so as to divert flows
through the waterway crossing of Aspera Place, and reduce flooding of downstream areas along Lake
Entrance Boulevard.
A 450mm low flow pipe was included underneath Hollett Road. The surveyed invert level of this culvert was
6.53 mAHD.
Typical entry and exit losses of 0.5 and 1.0 respectively were assumed for the culverts, unless specified
otherwise.
No blockage of the existing culverts was assumed.
The Walter Hay Drive bridge was modelled as a 2D structure based on plans obtained from the Department
of Main Roads.
No structures were included in the 1D section of the model as the model ended upstream of Weyba Road.
The recent bridge crossing of Weyba Creek at Eenie Creek Road was not included as it was not in the Mike
11 model. The bridge crossing is not expected to have a significant impact on peak flood levels as the
bridge deck is well above peak flood levels, there is a large spacing between piers, and there are low flow
velocities in this area.

3.3                    Model Calibration
                                                                               th
The results of the TUFLOW model were compared to the flood event of the 24 of February 2012. SCRC
had debris levels surveyed around Lake Entrance Boulevard following this event. The rainfall was quite
spatially varied. The closest gauges at Tewantin and Upper Doonan recorded 196mm and 109mm
respectively over a 210 minute period. The rainfall applied to the WBNM sub-catchments were weighted
based on their location relative to the gauges.
The intensity frequency duration (IFD) analysis of this rainfall event at the two gauges is shown below in
Image 1.




Northbrook Corporation Pty Ltd                   Version 4                                 16 September 2013
Flood Study v4 2.doc                       Commercial in Confidence                                  Page 9

Section 15

Noosa on Weyba
Flood Study




                               100
  Rainfall Intensity (mm/hr)




                               10
                                 0.125                       0.25                      0.5                               1                        2                            4

                                                                                                                 Hours
                                         1 Year ARI   2 Year ARI    5 Year ARI   10 Year ARI       20 Year ARI       50 Year ARI   100 Year ARI       Tewantin Gauge   Upper Doonan Gauge



Image 1                                       IFD Analysis of February 2012 Event


The above image shows that the rainfall recorded at the Tewantin gauge had an ARI of more than 100 years
for storm durations between 1 and 3 hours, which is similar to the times of concentration of the sub-
catchments. The rainfall recorded at the Upper Doonan gauge had an ARI of approximately 5 years. This
highlights the spatial variability of rainfall intensity during this event. As the site and its contributing
catchments are located between these two gauges it is likely that the resultant ARI would be less than 100
years.




Northbrook Corporation Pty Ltd                                                                       Version 4                                                           16 September 2013
Flood Study v4 2.doc                                                                           Commercial in Confidence                                                           Page 10

Section 16

Noosa on Weyba
Flood Study




4                      Hydrologic Model
4.1                    Rational Method
4.1.1                  Sub-catchments
The catchment areas were delineated using a combination of LiDAR data from DEHP, the digital 25 metre
grid DTM of South-East Queensland provided by DEHP and the catchment boundaries used in the Noosa
River Flood Study. The resultant sub-catchments are shown in Figure 1. The delineation of the Eenie
Creek and Keyser Creek tributaries of Lake Weyba was much more detailed than that conducted for the
regional flood study, and so comparison of the resultant peak flows from these catchments is not
appropriate.

4.1.2                  Times of Concentration
The times of concentration were calculated at several points for different tributaries using the Bransby
William’s Equation, which is the preferred method of QUDM (2007) for rural catchments less than 500
hectares. A summary of the calculations is shown below in Table 4-1. The total time of concentration for the
two creeks draining towards Lake Weyba was around 3 hours.
Table 4-1              Bransby Williams Time of Concentration Calculations

        Sub-                 Contributing    Stream Length     Equal Area       Tc
     catchment                Catchment           (km)           Slope         (min)
                                 Area                             (%)
                                 (ha)
        EC_A2                   230.29           2.53              1.54        78.1
        EC_B2                   349.48           4.44              3.62        110.8
        EC_C1                   72.48            2.08              1.89        69.0
        EC_E4                   285.22           2.50              1.34        77.6
        EC_F6                   76.58            1.41              1.53        48.8
        KC_I2                   139.68           1.75              1.65        56.1
        KC_H2                   246.54           2.49              1.31        79.0
  All catchments               1643.33           7.58              2.64        172.7
    draining to
   Eenie Creek
   and Keyser
       Creek



4.1.3                  Rainfall Intensity
The rainfall intensities were taken from Noosa using AUSIFD. The resultant rainfall intensities are shown in
Appendix C.

4.1.4                  Fraction Impervious
The fraction impervious values for the sub-catchments were taken from the values used for the Noosa River
Flood Study. The lake was assumed to be fully impervious.

4.1.5                  Runoff Coefficient
The runoff coefficient for each sub-catchment was calculated from QUDM. Based on the rainfall intensity a
10 year runoff co-efficient for fully pervious areas of 0.70 was adopted.




Northbrook Corporation Pty Ltd                            Version 4                         16 September 2013
Flood Study v4 2.doc                                Commercial in Confidence                         Page 11

Section 17

Noosa on Weyba
Flood Study



4.1.6                  Resultant Peak Flows
The resultant 100 year ARI peak flows for the sub-catchments are shown in Table 4-2.
Table 4-2              Rational Method Peak Flows

       Sub-                 Contributing        Fraction         10 Year Runoff            100 Year ARI      100 Year ARI
    catchment                Catchment         Impervious          Coefficient                Rainfall        Peak Flow
                                                                                                                   3
                              Area (ha)                                                      Intensity          (m /s)
                                                                                              (mm/hr)
        EC_A2                  230.29                0.025             0.705                   88.5              47.9
        EC_B2                  349.48                0.062             0.712                   74.1              61.4
       EC_C1                   72.48                 0.050             0.710                   94.4              16.2
        EC_E4                  285.22                0.024             0.705                   88.8              59.5
        EC_F6                  76.58                 0.002             0.700                  113.5              20.3
        KC_I2                  139.68                0.050             0.710                  104.9              34.7
       KC_H2                   246.54                0.028             0.706                   88.1              51.1



4.2                    WBNM Model
4.2.1                  Summary
A WBNM model was set up of all the sub-catchments shown in Figure 1. The details of each sub-catchment
are shown in Table 4-3. The sub-catchments prefixed with EC stand for the Eenie Creek sub-catchments,
those prefixed with KC stand for Keyser Creek sub-catchments and those prefixed with LW stand for Lake
Weyba and Weyba Creek sub-catchments.
Table 4-3              WBNM Sub-catchments – Existing Case

      Sub-                   Area           Fraction            Sub-            Area               Fraction
   catchment                 (ha)          Impervious        catchment          (ha)              Impervious

      EC_A1                 165.89            0.00             EC_F7                6.27              0.00
      EC_A2                  64.39            0.09             EC_F8                3.68              0.00
      EC_A3                  27.42            0.56            EC_G1                 4.78              0.00
      EC_A4                  93.28            0.73            EC_G2                 2.45              0.00
      EC_A5                  24.87            0.21            KC_H1             31.34                 0.00
      EC_A6                 143.69            0.00            KC_H2             29.91                 0.00
      EC_B1                 299.10            0.05            KC_H3                 8.54              0.00
      EC_B2                  50.39            0.13            KC_H4             63.02                 0.00
      EC_C1                  72.48            0.05             KC_I1            97.15                 0.05
      EC_C2                  7.98             0.20             KC_I2            42.53                 0.05
      EC_D1                  5.30             0.45             KC_I3            14.48                 0.00
      EC_E1                 246.45            0.02             KC_I4            12.27                 0.00
      EC_E2                  24.50            0.05             KC_I5            10.33                 0.00
      EC_E3                  6.34             0.05            LW_62            222.49                 0.11
      EC_E4                  7.93             0.05            LW_63             99.73                 0.33
      EC_F1                  27.06            0.00            LW_64            997.21                 1.00
      EC_F2                  3.66             0.05            LW_65            1468.53                0.11
      EC_F3                  5.79             0.00            LW_69            156.53                 0.00



Northbrook Corporation Pty Ltd                                 Version 4                                           16 September 2013
Flood Study v4 2.doc                                     Commercial in Confidence                                           Page 12

Section 18

Noosa on Weyba
Flood Study



      Sub-                   Area        Fraction           Sub-             Area        Fraction
   catchment                 (ha)       Impervious       catchment           (ha)       Impervious

      EC_F4                  12.87          0.00           LW_70            138.55         0.33
      EC_F5                  9.55           0.00            LW_A                 6.84      0.00
      EC_F6                  17.65          0.00            LW_B                 3.85      0.00


An initial loss of 15mm and continuing loss of 2.5 mm/hr was assumed for pervious areas. An initial loss of
0mm and continuing loss of 0 mm/hr was assumed for impervious areas. These were the rainfall losses
adopted in the Noosa River RAFTS model.
The WBNM model was run for a range of storm durations to determine the peak flows. A lag factor of 1.3
was ultimately adopted for all sub-catchments. This is within the advised range of 1.3 to 1.8. The resultant
peak flows, compared to the Rational Method and the Noosa River RAFTS model, are shown in Table 4-4.
As this table shows the peak flows match fairly well with the Rational Method results. The peak flows were
compared to the RAFTS model for the 30 hour event, as this was the critical event for the regional flood
model and the RAFTS model was not run for the same range of durations as the WBNM model. The results
show a good correlation with the smaller catchments, but an overestimation of flows for the larger catchment.
Therefore the flows from the WBNM model are conservatively high when compared to this regional flood
model.
Table 4-4              Comparison to Rational Method Flows

       Sub-                 100 Year ARI Peak Flows              %
                                       3
    catchment                        (m /s)                 Difference
                            Rational        WBNM
      EC_A2                   47.9           46.0               -4.1
      EC_B2                   61.4           65.9               6.8
      EC_C1                   16.2           17.8               9.8
      EC_E4                   59.5           54.9               -7.7
       EC_F6                  20.3           19.5               -4.1
      KC_H2                   51.6           49.7               -3.8
       KC_I2                  34.7           30.2              -13.0
                           100 Year ARI Peak Flows 30
                                   Hour Event
                                        3
                                     (m /s)
                          Noosa River       WBNM
                            RAFTS
                            Model
      LW_65                  133.0           181.1             36.2
      LW_69                   24.6           25.0               1.6
      LW_70                   23.3           23.5               1.0



4.2.2                  Developed Case
For the developed case scenario the fraction impervious values were changed to represent the increase in
impervious area. A fraction impervious of 0.60 was used for standard residential areas, 0.70 for townhouses
and retirement villas and 0.80 for apartment buildings.
The properties of the developed case sub-catchments are shown in Table 4-5.                          The modified sub-
catchments have been bolded and italicised.




Northbrook Corporation Pty Ltd                              Version 4                                   16 September 2013
Flood Study v4 2.doc                                  Commercial in Confidence                                   Page 13

Section 19

Noosa on Weyba
Flood Study



Table 4-5              WBNM Sub-catchments – Developed Case

       Sub-                  Area        Fraction           Sub-                Area    Fraction
    catchment                (ha)       Impervious       catchment              (ha)   Impervious

      EC_A1                 165.89         0.00           EC_F7                 6.27      0.45
      EC_A2                  64.39         0.09           EC_F8                 3.68      0.46
      EC_A3                  27.42         0.56           EC_G1                 4.78      0.00
      EC_A4                  93.28         0.73           EC_G2                 2.45      0.70
      EC_A5                  24.87         0.21           KC_H1             31.34         0.00
      EC_A6                 143.69         0.00           KC_H2             29.91         0.03
      EC_B1                 299.10         0.05           KC_H3                 8.54      0.60
      EC_B2                  50.39         0.13           KC_H4             63.02         0.00
      EC_C1                  72.48         0.05            KC_I1            97.15         0.05
      EC_C2                  7.98          0.20            KC_I2            42.53         0.05
      EC_D1                  5.30          0.45            KC_I3            14.48         0.60
      EC_E1                 246.45         0.02            KC_I4            12.27         0.39
      EC_E2                  24.50         0.05            KC_I5            10.33         0.40
      EC_E3                  6.34          0.44           LW_62            222.49         0.11
      EC_E4                  7.93          0.05           LW_63             99.73         0.33
      EC_F1                  27.06         0.00           LW_64            997.21         1.00
      EC_F2                  3.66          0.25           LW_65            1468.53        0.11
      EC_F3                  5.79          0.60           LW_69            156.53         0.00
      EC_F4                  12.87         0.00           LW_70            138.55         0.33
      EC_F5                  9.55          0.47            LW_A                 6.84      0.55
      EC_F6                  17.65         0.04            LW_B                 3.85      0.42


The resultant peak local 100 year ARI flows for each WBNM sub-catchment are shown in Table 4-6 for the
existing and developed cases.
Table 4-6              100 Year ARI Local Peak Flows

      Sub-                 100 Year ARI Peak Flow          Sub-           100 Year ARI Peak Flow
                                      3                                              3
   catchment                        (m /s)              catchment                  (m /s)
                           Existing     Developed                         Existing     Developed
                            Case          Case                             Case          Case
      EC_A1                  34.5          34.5           EC_F7                 2.4       3.3
      EC_A2                  17.0          17.0           EC_F8                 1.6       2.1
      EC_A3                  12.9          12.9           EC_G1                 1.9       1.9
      EC_A4                  43.1          43.1           EC_G2                 1.1       1.5
      EC_A5                   8.9          8.9            KC_H1                 8.8       8.8
      EC_A6                  30.7          30.7           KC_H2                 8.5       8.8
      EC_B1                  58.3          58.3           KC_H3                 3.0       4.7
      EC_B2                  14.6          14.6           KC_H4                 15.4      15.4
      EC_C1                  17.8          17.8            KC_I1                22.8      22.8
      EC_C2                   3.4          3.4             KC_I2                11.8      11.8
      EC_D1                   2.8          2.8             KC_I3                4.7       7.5


Northbrook Corporation Pty Ltd                             Version 4                                16 September 2013
Flood Study v4 2.doc                                 Commercial in Confidence                                Page 14


[OCR of page images]
Noosa on Weyba

Flood Study

CJ) Gardno

 

Table 4-5 WBNM Sub-catchments — Developed Case

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sub- Area Fraction Sub- Area Fraction
catchment (Gey) Impervious catchment (ey) Impervious
EC_A1 165.89 0.00 EC_F7 6.27 0.45
EC_A2 64.39 0.09 EC_F8& 3.68 0.46
EC_A3 27.42 0.56 EC_G1 4.78 0.00
EC_A4 93.28 0.73 EC_G2 2.45 0.70
EC_A5 24.87 0.21 KC_H1 31.34 0.00
EC_A6 143.69 0.00 KC_H2 29.91 0.03
EC_B1 299.10 0.05 KC_H3 8.54 0.60
EC_B2 50.39 0.13 KC_H4 63.02 0.00
EC_C1 72.48 0.05 KC_I1 97.15 0.05
EC_C2 7.98 0.20 KC_I2 42.53 0.05
EC_D1 5.30 0.45 KC_I3 14.48 0.60
EC_E1 246.45 0.02 KC_I4 12.27 0.39
EC_E2 24.50 0.05 KC_I5 10.33 0.40
EC_E3 6.34 0.44 LW_62 222.49 0.11
EC_E4 7.93 0.05 LW_63 99.73 0.33
EC_F1 27.06 0.00 LW_64 997.21 1.00
EC_F2 3.66 0.25 LW_65 1468.53 0.11
EC_F3 5.79 0.60 LW_69 156.53 0.00
EC_F4 12.87 0.00 LW_70 138.55 0.33
EC_F5 9.55 0.47 LWA 6.84 0.55
EC_F6 17.65 0.04 LW_B 3.85 0.42

 

 

 

 

 

 

The resultant peak local 100 year ARI flows for each WBNM sub-catchment are shown in Table 4-6 for the
existing and developed cases.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table 4-6 100 Year ARI Local Peak Flows
PTT] 100 Year ARI Peak Flow Sub- 100 Year ARI Peak Flow
catchment catchment (m*/s)
Existing Developed Shite) Developed
Case Case Case (er-Ty-)

EC_A1 34.5 34.5 EC_F7 2.4 3.3
EC_A2 17.0 17.0 EC_F8 1.6 27
EC_A3 12.9 12.9 EC_G1 1.9 1.9
EC_A4 43.1 43.1 EC_G2 1.1 1.5
EC_A5 8.9 8.9 KC_H1 8.8 8.8
EC_A6 30.7 30.7 KC_H2 8.5 8.8
EC_B1 58.3 58.3 KC_H3 3.0 4.7
EC_B2 14.6 14.6 KC_H4 15.4 15.4
EC_C1 17.8 17.8 KC_I1 22.8 22.8
EC_C2 3.4 3.4 KC_l2 11.8 11.8
EC_D1 2.8 2.8 KC_I3 4.7 7.5

Northbrook Corporation Pty Ltd Version 4 16 September 2013

Flood Study v4 2.doc

Commercial in Confidence

Page 14

Section 20

Noosa on Weyba
Flood Study



      Sub-                 100 Year ARI Peak Flow                Sub-           100 Year ARI Peak Flow
                                      3                                                    3
   catchment                        (m /s)                    catchment                  (m /s)
                           Existing         Developed                           Existing           Developed
                            Case              Case                               Case                Case
      EC_E1                  48.7             48.7               KC_I4                4.1             5.7
      EC_E2                   7.6              7.6               KC_I5                3.6             4.9
      EC_E3                   2.5              3.3              LW_62                 47.2           47.2
      EC_E4                   3.0              3.0              LW_63                 33.0           33.0
      EC_F1                   7.8              7.8              LW_64              403.0             403.0
      EC_F2                   1.6              1.9              LW_65              230.0             230.0
      EC_F3                   2.2              3.3              LW_69                 32.9           32.9
      EC_F4                   4.3              4.3              LW_70                 43.6           43.6
      EC_F5                   3.3              4.8               LW_A                 2.5             3.7
      EC_F6                   5.6              5.8               LW_B                 1.6             2.1


For the developed case, for catchments E3, F7 and F8, off-line detention basins will be utilised to reduce
peak flows back to the existing case levels. Therefore for these sub-catchments the existing case inflows
were used in the TUFLOW modelling. The size of the detention basins required will be determined during
detailed design. The proposed culvert crossings will provide “on-line” detention of peak flows for other sub-
catchments. For the catchments draining directly towards Lake Weyba, detention basins are not proposed.
Bio-retention basins and swales will provide attenuation of minor flows. It should be noted that the minor
flow attenuation provided by the proposed rainwater tanks and bio-retention basins has not been included in
the analysis. Appropriate erosion and scour protection will be required on all outlets.

4.3                    PMF Inflows
The WBNM model was used to calculate the Probable Maximum Flood (PMF) flows utilising the Generalised
                                                                       2
Short Duration Method (GSDM) as the catchment area is less than 1000 km . A moisture adjustment factor
(MAF) of 0.85 was adopted and the catchment was assumed to be 100 percent rough. The resultant rainfall
depths for the PMP event are shown in Table 4-7.
Table 4-7              PMF Rainfall

 Duration (min)                       60             90          120         180             270       360
 Rainfall Depth (mm)                  350            448         517         626             747       832


The peak flows from the sub-catchments typically resulted from the 90 minute event and so this was used in
the analysis. It should be noted that in the downstream section of the model, the regional Noosa River PMF
levels event will dominate. The current PMF level in Lake Weyba is 4.23 mAHD.




Northbrook Corporation Pty Ltd                                   Version 4                                     16 September 2013
Flood Study v4 2.doc                                       Commercial in Confidence                                     Page 15

Section 21

Noosa on Weyba
Flood Study




5                      TUFLOW Calibration
5.1                    February 2012 Event
                          th
Following the 24 February 2012 flood event debris levels were surveyed by Council around Lake Entrance
Boulevard, located to the north of the site, which had several houses inundated. The survey levels are
shown in Appendix E. The surveyed levels compared to the TUFLOW results are shown in Table 5-1. The
Manning’s n roughness value for densely vegetated areas was increased to a 0.12 (refer Section 3.2) to
provide a closer match to the surveyed flood levels.
Table 5-1              Survey Levels Compared to the TUFLOW Results

                        Location              Survey          TUFLOW        Difference
                                            Debris Level       Result          (mm)
    Council Survey Levels
    Crossing of Lake Entrance Boulevard         4.19             4.19           0
    Lots on Lake Entrance Boulevard          3.56 to 3.67        3.58         ~ -40
    JFP Survey Levels
    Easement                                     2.8             3.22          420
    Eenie Creek                               1.3 to 1.4         2.97        ~ 1620
    Walter Hay Drive                             1.5             2.72         1220
    Lot 11                                    1.2 to 1.5     2.00 to 2.09     ~700


Within the lots along the south-east side of Lake Entrance Boulevard, the debris levels ranged from 3.56 to
3.67 mAHD. In this area the modelled flood level was 3.58 mAHD. On the other side of the road, a debris
level was recorded as 3.75 mAHD. The modelled flood level was 3.57m AHD, as it was downstream of the
other locations. At the creek crossing of Lake Entrance Boulevard the recorded debris level was 4.19
mAHD. The modelled flood level at this location was also 4.19 mAHD. The results of the TUFLOW model
were therefore considered to match very well with the recorded debris levels from Council.
Debris levels surrounding the site were also surveyed by JFP. The survey plan is attached in Appendix E.
                                  th                                                                    nd
The survey was taken on the 24 of April 2012, and the last significant rainfall event occurred on the 22 of
March 2012. The recorded debris level over the electrical easement was 2.80 mAHD. The modelled flood
level at this location for the February 2012 event was 3.22 mAHD. At the confluence of the local tributary
with Eenie Creek, the recorded debris levels were 1.3 and 1.4 mAHD. The modelled flood level was 2.97
mAHD. At Walter Hay Drive the recorded debris level was 1.5 mAHD and the modelled flood level was 2.72
mAHD. Within Lot 11 on RP893393 the recorded debris levels ranged from 1.2 to 1.5 mAHD. The modelled
flood levels were between 2.00 and 2.09 mAHD.
Compared to the JFP surveyed levels the results of the flood model are significantly higher. There are
several factors that could have influenced this discrepancy;
      The survey was conducted two months after the flood event, during which subsequent rainfall events
       may have washed away debris;
      The rainfall within the local catchments may have been less intense than recorded at the nearby
       gauges, which showed an extremely spatially varied rainfall pattern;
      The assumed tailwater and initial water level condition of MHWS may have been overly conservative
       and impacted on the flood levels of downstream areas;
      The existing dam may not have been full prior to the rainfall event and could have provided additional
       attenuation of peak flows; and
      The ALS data does not penetrate the water surface which can result in an overestimation of minor flood
       levels in TUFLOW.
Northbrook Corporation Pty Ltd                         Version 4                             16 September 2013
Flood Study v4 2.doc                             Commercial in Confidence                             Page 16

Section 22

Noosa on Weyba
Flood Study



It should be noted that the water surface profile required to match the Council debris levels with the JFP
debris levels would have been unrealistic. It was therefore considered that a calibration to the higher debris
levels was the most reasonable approach.
The resultant flood levels for the February 2012 event are shown in Figure 10. For the upstream areas of
Eenie Creek, the resultant modelled water levels were between the 50 and 100 year ARI levels. Within
Keyser Creek the resultant water levels were roughly equivalent to the 20 year ARI event.




Northbrook Corporation Pty Ltd                    Version 4                                   16 September 2013
Flood Study v4 2.doc                        Commercial in Confidence                                   Page 17

Section 23

Noosa on Weyba
Flood Study




6                      Existing Case Results
6.1                    Peak Water Levels
Figure 6 shows the existing case 100 year ARI peak water levels. It should be noted that this figure shows
the maximum extent of inundation from design events 1, 8, 9 and 10 and so includes all local and regional
flood events. The 100 year ARI peak water level with climate change is shown in Figure 12. The 10 and 2
year ARI peak water levels are shown in Figures 9 and 10 respectively.
The existing case peak water levels at the comparison points shown in Figure 4 are provided in Appendix F.
The 100 year ARI extent of inundation covers a significant portion of the Northbrook site, particularly the
western drainage channel which encompasses Keyser Creek. The existing case 100 year ARI local peak
flood levels in Keyser Creek within Lot 11 range from 2.09 to 2.17 mAHD. With the 20 year ARI storm surge
as a tailwater condition the 100 year ARI peak water level is between 2.16 and 2.23 mAHD. The 100 year
ARI regional peak flood levels range from 2.16 and 2.18 mAHD in this area. With the impact of climate
change the future 100 year ARI water levels in this area will be between 2.78 and 2.79 mAHD. Therefore
filling is required to ensure that the proposed lots in this area are not inundated.
The 100 year ARI peak flood levels within Eenie Creek and its tributaries also result from the 100 year ARI
local inflows combined with the 20 year ARI storm surge level. This demonstrates that storm surge events
dominate flood levels in the area.
The proposed development within the Hofmann site generally does not extend into areas which are
inundated in the 100 year ARI event, even with the impact of climate change. Only three lots in Precinct 3
Area I will require filling. These lots are located in an area that has existing levels of approximately 2.5
mAHD and above.
The existing case results demonstrated that the area around Lake Entrance Boulevard currently experiences
a significant amount of flooding. The second crossing of Lake Entrance Boulevard is un-trafficable during a
2 year ARI event, with a depth of flooding across the road of approximately 500mm. Access to the 70 lots
located to the south of this crossing is therefore restricted during a 2 year ARI event and above.
The existing Tidswell Road access track is also un-trafficable during a 5 year ARI event, which would prevent
access to the lot located to the south of Lot 11.
There are a few properties along Tidswell Road and Paradise Drive, located upstream of Lot 11, that are
currently inundated in local and regional flood events. It is therefore necessary to ensure that the proposed
development does not exacerbate these existing flooding issues.

6.2                    Peak Flows
The existing case peak flows at the comparison lines throughout the 2D section of the model shown in
Figure 4 are provided in Appendix G.

6.3                    Peak Velocities
The 100 year ARI peak velocities are shown in Figure 8. The existing case peak velocities at the
comparison points shown in Figure 4 are provided in Appendix H.
The peak velocities in the western drainage channel are quite low, with peak velocities typically around
0.2 m/s. The peak velocities in the tributary that drains through the J&K Hofmann site are typically around
0.5 m/s.




Northbrook Corporation Pty Ltd                   Version 4                                   16 September 2013
Flood Study v4 2.doc                       Commercial in Confidence                                   Page 18

Section 24

Noosa on Weyba
Flood Study




7                      Proposed Development
7.1                    Proposed Development
The proposed development plan is shown in Figure 13. The roughness values were not altered in the
developed case, as proposed urban areas will be filled, where necessary, to above the 100 year ARI
developed case peak flood level (with climate change).
J&K Hofmann Site
The proposed development of the J&K Hofmann site is predominantly outside of the 100 year ARI inundation
extent. Minor sections of filling are required for three lots within Precinct 3 Area I. The 100 year ARI
developed case peak flood level (with climate change) is 3.45 mAHD in this area. Therefore the minimum
floor levels will be set above 3.95 mAHD to provide sufficient flood immunity in accordance with SCRC
requirements. Compensatory excavation in this area is not proposed. However, if required by Council, this
could be conducted in the asset protection zone adjacent to the filled lots.
To provide attenuation of peak flows, a culvert crossing of the Eenie Creek tributary will be located within the
easement at the northern end of the site. Detention basins will also be required for the northern section of
Precinct 3 as well as Precinct 4. Sizing of these detention basins will be conducted during detailed design.
An internal round will be provided along the southern boundary, adjacent to Hollett Road West. This will
provide access to the western side of the site. This road will have 10 year ARI flood immunity and be
trafficable during a PMF event to allow for emergency access to Precinct 4. Precinct 4 will therefore be able
to access the site from Walter Hay Drive.
Northbrook Site
It is proposed that a large area will be filled to levels above the 100 year ARI flood level (with climate
change). A waterway corridor of a minimum 100 metre width will be maintained in this area. At the southern
boundary of the site, the waterway corridor increases to around 150 metres so that existing overland flow
paths are maintained. No excavation within the waterway corridor is proposed so as to maintain existing
vegetation. The 100 year ARI developed case peak flood level (with climate change) is around 2.80 mAHD
in these areas. Therefore the minimum floor levels will be set above 3.30 mAHD to provide sufficient flood
immunity in accordance with SCRC requirements. The entire area will be filled to levels above the 100 year
ARI flood level (with climate change).
A road crossing of Keyser Creek and one of its tributaries is proposed. These crossings will have 100 year
ARI flood immunity and will also be trafficable during a PMF event.    The road crossings will also provide
attenuation of peak flows. A secondary access route along Tidswell Road is also proposed, and so this road
needed to be upgraded in the modelling to provide sufficient flood immunity.
Since the initial application was made, the main road crossing of Keyser Creek has been relocated to near
the southern boundary of the site. The actual road crossing has been set back from the boundary to ensure
that flood levels for the neighbouring property are not impacted upon. As the crossing is now upstream of
the proposed lots, in the unlikely event of complete culvert blockage the houses will still be provided with
sufficient flood immunity.

7.2                    Proposed Structures
The proposed culvert crossings are shown in Figure 13A. The minimum road heights are shown in Figure
13B. The details of the proposed structures are shown below. The evacuation routes are shown in Figure
14. To be considered trafficable, the roads were designed to have a maximum flow depth of 250mm and a
                                              2
depth-velocity (dV) product of less than 0.4 m /s.
Typical entry and exit losses of 0.5 and 1.0 were assumed unless specified otherwise.




Northbrook Corporation Pty Ltd                      Version 4                                  16 September 2013
Flood Study v4 2.doc                          Commercial in Confidence                                  Page 19

Section 25

Noosa on Weyba
Flood Study



7.2.1                PMF Trafficability Requirements
During PMF events, access for emergency vehicles would be required. These vehicles are typically larger
than standard vehicles and so can handle greater flow depths across roads. Based on Project 10 of
Australian Rainfall and Runoff (AR&R): Appropriate Safety Criteria for Vehicles (2011), large 4WDs can
cross roads with maximum depths of 500mm, with a limiting dV product of 0.6 m 2/s. Large passenger cars
can cross roads with maximum depths of 400mm, with a limiting dV product of 0.45 m 2/s. For PMF events
trafficability was therefore conservatively assumed if the depth was less than 400mm with a dV product of
0.45 m2/s.
The Queensland Department of Community Safety was contacted regarding the trafficability criteria used for
emergency vehicles. They advised that scenarios were assessed on a case by case basis and that a
specific guideline was not used. However, it should be noted that the AR&R project references the
Emergency Management Australia (EMA) manual for emergency vehicle 4WD operation that states that “if
water reaches to the bumper bar or higher, upon entering the water accelerate until a bow wave forms in
front of the vehicle. Maintain this bow wave at all costs, to keep water out of the engine.” In water depths of
greater than 750mm, it is suggested that either a snorkel extension to the engine air inlet and exhaust
system is fitted or a canvas sheet or tarp is placed across the grille to prevent water entering the engine
bay.”
For similar developments in Brisbane a maximum depth of 500mm and dV product of 0.6 m 2/s has been
utilised to determine PMF trafficability for emergency vehicles. This is based on the Brisbane City Council
(BCC) Subdivision and Development Guidelines (2008), Chapter 1 Part A which states that with flood depths
less than 500mm and a dV product less than 0.6 m2/s, that evacuation of persons and possessions via
trucks is possible and that fit adults can wade through floodwaters.

7.2.2                Structure Details
Hollett Road West Internal Road
The minimum road level will need to be set at 7.35 mAHD. 10 year ARI flood immunity is proposed with
PMF trafficability.
The culverts will include 3/1200 by 450 RCBCs (upstream IL = 6.55 mAHD, downstream IL = 6.50 mAHD,
length = 12m). Approximately 12 metres to the west 3/1200 by 450 RCBCs (upstream IL = 6.65 mAHD,
downstream IL = 6.60 mAHD, length = 12m) should also be installed.
Easement Crossing
This crossing is not required for access purposes for the site. However, it could potentially be utilised by
existing properties around Lake Entrance Boulevard and Aspera Place as an alternative flood access route,
as 70 properties in this area are inaccessible during a 2 year ARI event and above.
The minimum road level will be set at 4.30 mAHD. 10 year ARI flood immunity is proposed with 100 year
ARI trafficability.
The proposed culvert is a 1/1500 by 1500 RCBCs (upstream IL = 2.00 mAHD, downstream IL = 1.95 mAHD,
length = 15m).
Tidswell Road Crossing
An upgrade of Tidswell Road is proposed as a secondary access route for the development. It is proposed
that the existing track will be upgraded by Council, as a cost to the subject development, so that 5 year ARI
flood immunity is provided, as required for rural roads. The minimum road level will be raised from around
3.40 mAHD to 4.15 mAHD.
The proposed culverts include 3/1500 by 600 RCBCs (upstream IL = 3.30 mAHD, downstream IL = 3.15
mAHD, length = 15m) and 1/1500 by 600 RCBC (upstream IL = 3.35 mAHD, downstream IL = 3.10 mAHD,
length = 15m).




Northbrook Corporation Pty Ltd                        Version 4                               16 September 2013
Flood Study v4.doc                              Commercial in Confidence                               Page 20

Section 26

Noosa on Weyba
Flood Study



Keyser Creek Crossing (Lot 11 Access Road)
This crossing of the creek will provide the only access to Precinct 1 and 2. It is proposed that this crossing
have 100 year ARI flood immunity (with climate change) and be trafficable during a PMF event. As the
regional PMF level is 4.23 mAHD the minimum possible road level is 3.83 mAHD. The culverts will consist of
3/3000 by 1500 RCBCs (upstream IL = 1.00 mAHD, downstream IL = 0.90 mAHD, length = 15.5m), 3/3000
by 1500 RCBCs (upstream IL = 1.10 mAHD, downstream IL = 1.00 mAHD, length = 15.5m), 1/2100 by 1500
RCBCs (upstream IL = 1.15 mAHD, downstream IL = 1.05 mAHD, length = 15.5m) and 1/1500 by 1500
RCBCs (upstream IL = 1.30 mAHD, downstream IL = 1.20 mAHD, length = 15.5m).
The entry and exit losses were assumed to be 0.4 and 0.7 as wingwalls between 30 and 70 degrees will be
utilised, and scour resistant outlet pad will be installed (refer Section 7.16.2 of QUDM). Debris deflector walls
will be installed on the inlets.
Swales will be required on the southern side of the crossing to ensure flows freely drain to the culverts.
Keyser Creek Pedestrian Crossing
A pedestrian and fire track will be provided along the northern boundary of Lot 11. The existing track will be
raised by around 400mm to a minimum level of 1.6 mAHD and 3/1500 by 600 RCBCs (upstream IL = 0.65
mAHD, downstream IL = 0.64 mAHD, length = 5m) will be provided underneath the road. The larger culvert
crossing will improve the tidal flushing in this area and the raised track will provide some attenuation of peak
flows. No flood immunity is required for this crossing.
Keyser Creek Tributary Crossing (Hollett Road East)
A crossing of this small tributary will be required to provide access to Precinct 1 and 2. The road level is
quite variable. It is proposed that this road have 50 year ARI flood immunity and be trafficable during a PMF
event.
Several culvert crossings are required. They consist of 1/2700 by 1200 RCBC (upstream IL = 4.00 mAHD,
downstream IL = 3.75 mAHD, length = 25m); 1/600 RCP (upstream IL = 4.00 mAHD, downstream IL = 3.60
mAHD, length = 25m); and 1/525 RCP (upstream IL = 4.70 mAHD, downstream IL = 4.50 mAHD, length =
25m). At other points along the road, underdrainage will be required for local overland flows.
This crossing is located to the north of the Noosa Wildlife Refuge. To allow for the safe passage of koalas
and other animals, between the Refuge and the environmental protection land on the subject site, the
minimum culvert height has been set at 1200mm, with a width of 2700mm. The Department of Main Roads
Fauna Sensitive Road Design (2000) indicates that culverts of this height have been known to allow for
passage of small, medium and large mammals, semi-arboreal mammals (which includes koalas), micro
chiropteran bats, reptiles, birds, amphibians and introduced predators.

7.3                  Proposed Stormwater Treatment
Numerous water sensitive urban design (WSUD) measures are proposed to treat stormwater. These include
bio-retention gardens and tree-pits located within the road reserve, vegetated swales, bio-retention swales,
bio-retention basins, litter baskets and rainwater tanks. For further details refer to the Stormwater
Management Plan (Cardno, September 2013). The proposed treatment measures will be located outside of
the 100 year ARI extent of inundation. The waterway corridor will not be utilised for stormwater treatment
purposes; stormwater will be treated to a sufficient level before it is discharged to this area.




Northbrook Corporation Pty Ltd                     Version 4                                    16 September 2013
Flood Study v4.doc                           Commercial in Confidence                                    Page 21

Section 27

Noosa on Weyba
Flood Study




8                    Developed Case Results
8.1                  Peak Water Levels
The developed case peak water levels are shown in Appendix F. The resultant impact on peak water levels
for the local and regional flood events are also shown in Figures 22 to 35. The resultant minimum lot levels
are shown in Figure 13B.
J&K Hofmann Site
The 100 year ARI peak flood level (with climate change) around Precinct 3 Area H is approximately
3.01 mAHD. Therefore the minimum floor levels in this area are 3.51 mAHD.
The 100 year ARI peak flood level (with climate change) around the northern section of Precinct 3 Area I is
approximately 3.48 mAHD. Therefore the minimum floor levels in this area are 3.98 mAHD. The remainder
of Precinct I is well above the flood level of the tributary, even with the easement crossing in place.
The 100 year ARI peak flood level (with climate change) around Precinct 4 Area K is approximately 7.16
mAHD. Therefore the minimum floor levels in this area are 7.66 mAHD. For the proposed lot adjacent to
Hollett Road the 100 year ARI flood level (with climate change) is 7.53 mAHD, and so the minimum floor
level is 8.03 mAHD.
The 100 year ARI peak flood level (with climate change) around Precinct 4 Area L is a maximum of 5.40
mAHD. Therefore the minimum floor levels in this area are 5.90 mAHD Precinct 4 Area J is located well
above the flood level of the tributaries.
The 100 year ARI peak water level over the proposed internal road, running parallel Hollett Road is variable
but is approximately 7.39 mAHD at the crest, with a maximum depth of 40mm. The PMF peak depth is
approximately 220mm, which is considered trafficable. The dV product across the road in a PMF event is
approximately 0.33 m 2/s. The peak water levels immediately upstream of this crossing, i.e. within the Hollett
Road reserve, have been increased in major flood events. However, the increase is generally contained
within the road reserve and does not extend a significant distance upstream. As an alternate route with
improved flood immunity is proposed this is considered acceptable. This approach also allows the existing
vegetation within the road reserve to be maintained.
The 100 year ARI peak water level across the proposed easement crossing is 4.36m AHD, resulting in a
flood depth of 60mm, and so it is trafficable in a 100 year ARI event. It also has 10 year ARI immunity. This
crossing does not have PMF trafficability. This crossing could potentially improve flood access for the
neighbouring Lake Entrance Boulevard area. The peak water levels upstream of the easement crossing are
increased. This increase is contained within the site.
The water levels downstream of the easement are decreased by approximately 6mm in the 100 year ARI
event and 10mm in the 20 year ARI event. This decrease extends up to Lake Entrance Boulevard. In the 2
and 1 year ARI events, there are some small areas of increase of approximately 6mm downstream of the
easement, near the confluence with Eenie Creek. These increases are contained within the waterway area.
It should be noted that additional attenuation provided by the proposed rainwater tanks and bio-retention
basins is likely to reduce this impact.
The filling of the three lots within Precinct 3 Area I has not had a noticeable impact on peak flood levels in
this area.
Northbrook Site
The 100 year ARI peak flood level (with climate change) around Precinct 2 is approximately 2.80 mAHD.
Therefore the minimum floor levels in this area are 3.30 mAHD.
The 100 year ARI peak flood level (with climate change) within Lake Weyba is 2.72 mAHD. Therefore the
minimum floor level for lots adjacent to the lake (Precinct 1) is 3.22 mAHD.




Northbrook Corporation Pty Ltd                    Version 4                                  16 September 2013
Flood Study v4.doc                          Commercial in Confidence                                  Page 22

Section 28

Noosa on Weyba
Flood Study



The Hollett Road East tributary crossing has a variable flood level upstream. The maximum depth of
flooding in the 100 year ARI event is approximately 80mm across the road. In the PMF event the maximum
flood depth is approximately 270mm, and the dV product across the road is 0.30m 2/s. The peak flood levels
upstream of this crossing are increased, however this area is a designated nature refuge, and the increases
do not extend a significant distance.
The southern crossing of Keyser Creek has 100 year ARI flood immunity (with climate change). The PMF
flood level is controlled by the regional PMF event (4.23 mAHD), and so the peak depth of flooding is
approximately 400mm in this event.
The Tidswell Road upgrade has 5 year ARI flood immunity, and it is trafficable in a 100 year ARI event (not
including climate change). During a PMF event, it has a depth of flow of approximately 730mm across it,
and is therefore not trafficable.
From the developed case results, it is clear that the impact of filling required for lots and road crossings is
that the peak water levels are increased within the site for major flood events and immediately upstream of
upgraded road crossings. Due to the steep rise in surface levels upstream of Lot 11 and the low velocities in
the area, the increase in peak water levels within Lot 11 does not impact on upstream properties. The
impact at comparison point H2 in the 100 year ARI event is 9mm, which is considered negligible. In major
flood events there are some localised increases in the depressions along the site boundary which are
greater than 10mm. These areas are low-lying densely vegetated areas, and so minor water level increases
would not impact on the function of these areas. Given the rural zoning of the lot in which these localised
increases occur, and the fact that the area could not be developed for any alternate use, it is considered that
there is no actionable nuisance. In minor events, there are some decreases in peak flood levels within the
site and downstream. This is mainly due to the invert levels of the proposed culverts being lower than the
existing tracks, which improves flow conveyance during minor events, and allows local peaks to exit the site
before the peak flow from the remainder of the upstream catchment arrives.
The developed case peak water levels within the 1D section of the model, i.e. Lake Weyba and Weyba
Creek, are not different from the existing case levels.

8.2                  Peak Flows
The developed case peak flows are shown in Appendix G.
J&K Hofmann Site
The easement crossing effectively reduces the peak flows being discharged into Eenie Creek for all ARI
events except. It should be noted that minor flow attenuation provided by the proposed rainwater tanks and
bio-retention basins is expected to further reduce this peak flow in minor events.
There are some points within Eenie Creek, upstream of where the site would discharge, where the flows
have been shown to be increased by approximately 0.5 percent. This is not considered to be a result of the
development, but rather a small model instability.
It should be noted that detention basins will be required for Precinct 4 Area L and the northern part of
Precinct 3.
Northbrook Site
Downstream of Lot 11 the peak flows are less than the existing case for all ARI events. This is due to the
attenuation provided by the culvert crossings of Keyser Creek and its tributary.
At the confluence of Eenie and Keyser Creek, the peak flows are less than the existing case for all ARI
events.

8.3                  Peak Velocities
The developed case peak velocities are shown in Appendix H.
J&K Hofmann Site
The peak velocities within the tributary have been reduced by approximately 0.1 m/s due to the blockage of
flow provided by the easement crossing.

Northbrook Corporation Pty Ltd                    Version 4                                   16 September 2013
Flood Study v4.doc                          Commercial in Confidence                                   Page 23

Section 29

Noosa on Weyba
Flood Study



Northbrook Site
The comparison points are located near the culvert inlets, which show localised increases in peak velocities
of approximately 0.5 m/s. Scour protection will be provided in these areas. In general, due to the restriction
of the flood area, the peak velocities are increased by approximately 0.1 m/s. The peak velocities in the
western drainage channel are still quite low, at approximately 0.3 m/s.

8.4                    Sensitivity Analysis
8.4.1                  Waterway Corridor Revegetation
A scenario was run where the proposed waterway corridor was densely revegetated, with a typical
Manning’s n roughness of 0.15, to determine the potential impact on the 100 year ARI peak water levels.
This will determine whether revegetation would be feasible in this area.
Figure 36 shows the impact of revegetating the western drainage channel. The results are shown for the
100 year ARI events (local and regional) compared to the developed case without revegetation. The results
show an increase in water level of up to 110mm at the southern boundary of the site. The lot levels have
been set 500mm above the 100 year ARI peak flood level with climate change. Therefore there is
considered to be more than sufficient freeboard to account for this impact of revegetation.
Upstream of the Lot 11, there is a small area of increase in peak water level extending for a distance of
approximately 20 metres further upstream. The increase is approximately 20mm. However as this area is a
densely vegetated drainage channel, and no existing properties are impacted, this localised increase is
considered to be acceptable. Dense revegetation of the western drainage channel is therefore considered to
be achievable with acceptable flood impacts for the site and surrounding properties.

8.4.2                  Culvert Blockage
A scenario was also run with 20 percent blockage of the proposed culverts. This will determine whether
additional freeboard would be required. The results of this analysis are shown in Figure 38.
The results are shown for the 100 year ARI events (local and regional) compared to the developed case
without blockage. The base case assumed no blockage as the culvert crossings are also being utilised for
attenuation of peak flows, and reducing the flow capacity would have reduced peak flows downstream.
The average impact of 20 percent culvert blockage was:
      Hollett Road West (Internal Road): 50mm increase in upstream peak water level;
      Easement crossing: 30mm increase in upstream peak water level;
      Hollett Road East tributary crossing: 60mm increase in upstream peak water level;
      Southern Keyser Creek crossing (Lot 11 Access Road): 20mm increase in upstream peak water level;
       and
      Tidswell Road: 20mm increase in upstream peak water level.
The freeboard provided is considered to be sufficient to account for these increases. The peak depths over
the road will be slightly increased, however it is considered that this will not impact on the level of trafficability
as current peak depths in the PMF and 100 year ARI events are less than the limiting values.

8.4.3                  Severe Culvert Blockage
Item 86 of the SCRC RFI raised concerns with the potential for severe blockage of the culverts on Keyser
Creek, and the resultant impacts on properties located upstream of these culvert crossings. An analysis was
therefore run where 100 percent blockage of all culverts was assumed. The results are shown in Figure 39.
The results are shown for the 100 year ARI events (local and regional) compared to the developed case
without blockage. The base case assumed no blockage as the culvert crossings are also being utilised for
attenuation of peak flows, and reducing the flow capacity would have reduced peak flows downstream.
The average impact of 100 percent culvert blockage was:
      Hollett Road West (Internal Road): 170mm increase in upstream peak water level;

Northbrook Corporation Pty Ltd                         Version 4                                    16 September 2013
Flood Study v4 2.doc                             Commercial in Confidence                                    Page 24

Section 30

Noosa on Weyba
Flood Study



       Easement crossing: 120mm increase in upstream peak water level;
       Hollett Road East tributary crossing: 330mm increase in upstream peak water level;
       Southern Keyser Creek crossing (Lot 11 Access Road): 1840mm increase in upstream peak water
       level; and
       Tidswell Road: 120mm increase in upstream peak water level.
Since the original application was prepared, the location of the access road to the site has been relocated to
the southern boundary. It has been offset from this boundary to minimise flood impacts to the neighbouring
properties. This road crossing is now located upstream of Areas F and G, and so blockage of culverts would
have minimal impact to these proposed lots.
The results of the analysis showed that even with complete blockage of all proposed culverts that sufficient
flood immunity is provided for all of the proposed lots. However, the increase upstream of the Keyser Creek
crossing is significant, as the minimum road level (3.83 mAHD) had to be set high enough to maintain
trafficability during a regional PMF event. This could potentially exacerbate existing flooding issues for some
upstream properties.
A range of blockage factors was trialled, to look at the potential impact at comparison points H0, H1, H2 and
H3 which are located upstream of the site in Keyser Creek. The results are shown in the table below.
Table 8-1            Sensitivity Analysis – Culvert Blockage

    Comparison                                     100 Year ARI Local Peak Water Level
      Point                                                      (mAHD)
                                                               Blockage Factor
                                 0%              20%                50%             80%            100%
           H0                    3.72            3.72               3.72            3.72            4.09
           H1                    3.07            3.07               3.07            3.16            4.09
           H2                    2.62            2.62               2.62            3.11            4.09
           H3                    2.25            2.26               2.35            3.10            4.09


The results show that there is minimal impact upstream, even with 50 percent blockage of the culverts. If the
blockage factor is increased to 80 percent then there is a significant impact directly upstream of the culverts,
however, the impact is significantly reduced before it affects areas where there are existing properties (H0
and H1). It is only when there is 100 percent blockage of the culverts that upstream properties are
negatively impacted upon.
It is considered that this situation is extremely unlikely given the large size of the proposed culverts (flow
                      2
area totalling 32.4 m ) and the low flow velocities in the area. However, in order to reduce the likelihood of
blockage it is proposed to install debris deflector walls on the culvert inlets for the southern crossing of
Keyser Creek. An example of debris deflector walls is shown in Figure 10.07 of QUDM (2007). The purpose
of the debris deflector walls is to allow built up debris to rise with the flood waters, allowing flows to pass
underneath.
Project 11 of AR&R: Blockage of Hydraulic Structures (2013) details the levels of blockage that should be
considered for culvert crossings. Table 3.16 summarises the proposed blockage values that should be used
for various types of culverts. For culverts with effective debris control measures, such as debris deflector
walls, the design blockage is 10 percent and the severe blockage amount is 25 percent. Given that even
with 80 percent blockage there is minimal impact to upstream properties, the provision of debris deflector
walls is considered to sufficiently reduce any increased flood risk to upstream properties resulting from the
proposed development.




Northbrook Corporation Pty Ltd                         Version 4                               16 September 2013
Flood Study v4.doc                               Commercial in Confidence                               Page 25

Section 31

Noosa on Weyba
Flood Study




8.5                    Proposed Emergency Evacuation Routes
Figures 39 and 40 show the PMF peak flood levels and depths. There are high points within each section of
the development where people could safely congregate in a PMF event. Areas E and L, which are proposed
retirement villages and aged care facilities, are located well above the PMF flood level.
Access for emergency vehicles may be required in a PMF event. The emergency evacuation routes are
shown in Figure 14. All areas of the site can be accessed during a PMF event.
Flood access for neighbouring areas will also be improved, as described below.
      The existing property to the south of Lot 11 is inaccessible during a 5 year ARI event. This lot would
       now have access during a PMF event.
      The existing properties located around Precinct 4 would also have access along the internal access
       road adjacent to Hollett Road West, which has 10 year ARI flood immunity and is trafficable during a
       PMF event.
      The Lake Entrance Boulevard area is inaccessible during a 2 year ARI event. The proposed easement
       is trafficable during a 100 year ARI event (with climate change).




Northbrook Corporation Pty Ltd                     Version 4                                 16 September 2013
Flood Study v4 2.doc                         Commercial in Confidence                                 Page 26

Section 32

Noosa on Weyba
Flood Study




9                      Flood Storage
9.1                    Reduction in Flood Storage
The flood storage within Lot 11 on RP893393 for the existing and developed cases is shown below in Table
9-1. Due to filling required for lots and road crossings, the amount of storage on site has been reduced. At
2.25 mAHD, which is approximately the existing case 100 year ARI peak water level, the flood storage on
                                            3
site has been reduced by around 25,600m .
Local and regional flood modelling has shown that in major events under developed conditions, the peak
water level within the site is increased, but the impact on neighbouring areas is negligible. This is because
at the southern boundary of the site there is a sharp increase in surface levels, and so increases in flood
levels within the site do not extend upstream. The waterway corridor width at the southern boundary of the
site has also been widened to 190 metres, which is equal to the existing 100 year ARI flood width at this
point, so that local overland flow paths are not impeded.
Downstream of the site, the loss of flood storage within the site does not impact on flood levels for
neighbouring areas. Lake Weyba covers an area of 997 hectares. The volume of flood storage available
between 2.09 mAHD (which is the current SCRC 100 year ARI regional flood level in Lake Weyba) and 0.36
                                                                                 3
mAHD (which is the MHWS level at Munna Point) is approximately 17,250,000m . There is also significant
additional flood storage in the surrounding flood-plain areas. Therefore the loss of flood storage within the
site is minor when compared to the surrounding flood-plain and Lake Weyba.
Table 9-1              Flood Storage within Lot 11

         Level                                 Storage (m³)
        (mAHD)                  Existing      Developed Case          Difference
                                 Case
           3.00                  175,024         106,454                -68,571
           2.75                  138,102             86,054             -52,048
           2.50                  105,537             67,913             -37,624
           2.25                  77,041              51,425             -25,616
           2.00                  52,515              36,422             -16,093
           1.75                  31,558              22,985              -8,573
           1.50                  14,689              11,563              -3,127
           1.25                   4,406              3,695                -711
           1.00                   422                 342                 -80
           0.75                    4                   1                   -3
           0.50                    0                   0                   0


Compensatory excavation within the site has not been proposed due to the potential environmental impacts.
It was considered beneficial to preserve the existing waterway and vegetation through Lot 11 in its current
state. Flood modelling has shown that compensatory excavation is not required for flood alleviation
purposes.




Northbrook Corporation Pty Ltd                             Version 4                         16 September 2013
Flood Study v4 2.doc                                 Commercial in Confidence                         Page 27

Section 33

Noosa on Weyba
Flood Study



It is noted that the Noosa Council Strategic Plan (1995) states that: “filling of areas other than the designated
Urban Area is not acceptable. Therefore, rural township development and rural residential development
which occurs beyond the Urban Area should not involve filling of the floodplain”. The filling proposed within
Lot 11 is located within the previous Maroochy Shire Council and therefore is not covered by the Noosa
Council Strategic Plan. In addition, the Noosa River flood modelling that was conducted in Mike 11, which
was used to inform the Strategic Plan, did not include Keyser Creek or Eenie Creek as flood storage and the
model sections did not extend across Lot 11.
The Sunshine Coast Regional Council Growth Management Position Paper (SCRC 2008) states that “new
urban development is avoided in flood prone areas and floodplains unless there is compelling justification
that demonstrates overriding community benefits and that any negative impacts resulting from development
can be appropriately and sustainably managed.” The question of whether this proposed development can
constitute an overriding community benefit is beyond the scope of this report. This report determines
whether there are any negative impacts in relation to local and regional flooding as a result of this
development.

9.2                    Flood Impact of Cumulative Filling
                                     th
Item 88 of the SCRC RFI (28 of February 2013) stated that:
“With respect to loss of floodplain storage it is stated in the Flood Study that the loss of flood storage is minor
when compared to the surrounding floodplain and Lake Weyba. The cumulative impact of all sites within the
Noosa River and Lake Weyba floodplain being developed with a loss of floodplain storage has however not
been considered. In such a large catchment area it is the cumulative impact rather than site specific impact
of lost floodplain storage which is of concern.”
An analysis was therefore conducted to look at the potential impact of additional filling on regional flood
levels. The analysis was limited to the extents of the flood model area and included filling of residential,
limited development and rural use areas that have been predominantly cleared (similar to the area of filling
proposed on site) and that are located in the 100 year ARI flood inundation extent. The existing Noosa
Airport and sportsgrounds on Weyba Road were also filled. The 100 year ARI flood inundation extent was
taken from SCRC mapping. The extent of filling assumed in the analysis is shown in Appendix I. The total
area of fill equalled 54.0 hectares, and the volume of fill required to provide 100 year ARI flood immunity was
                         3
estimated at 370,000m . This is over 14 times the volume of fill proposed for the site. The flood model was
modified by filling the 1D cross-sections where appropriate.
The intent of this analysis is to look at the impact of filling on regional flood levels, which are higher than the
local flood levels in the downstream sections of Noosa River, Weyba Creek and around Lake Weyba. It is
not intended to be used to justify uncontrolled filling of the floodplain areas, as even though the impacts on
regional flood levels may be negligible it is likely that filling would result in local flood impacts for surrounding
areas. More detailed flood modelling, similar to that conducted for this assessment, would be required to
determine local flood impacts. The volume of fill modelled for this scenario is therefore a worst case
scenario and is not representative of the volume of fill that would actually be possible. The results of the
regional cumulative flood impact assessment are shown in Table 9-2. The results show that the peak water
levels within Lake Weyba and Weyba Creek increase by up to 5mm, which is considered negligible. There
was also negligible impact within the 2D sections of the model.
Table 9-2              Cumulative Flood Impact

   Cross-section                             100 Year ARI Regional                              Difference
                                               Peak Flood Level                                     (m)
                                                    (mAHD)
                             Existing Case        Proposed           With Regional    Proposed         With Regional
                                                 Development             Filling     Development           Filling
                                                    Only                                Only
      Weyba 0.0                  2.07                2.07                2.08           0.000                0.005
      Weyba 1.0                  2.07                2.07                2.08           0.000                0.005
      Weyba 2.0                  2.07                2.07                2.08           0.000                0.005
      Weyba 3.0                  2.07                2.07                2.08           0.000                0.005

Northbrook Corporation Pty Ltd                              Version 4                                  16 September 2013
Flood Study v4 2.doc                                  Commercial in Confidence                                  Page 28

Section 34

Noosa on Weyba
Flood Study



   Cross-section                        100 Year ARI Regional                              Difference
                                          Peak Flood Level                                     (m)
                                               (mAHD)
                        Existing Case        Proposed           With Regional    Proposed         With Regional
                                            Development             Filling     Development           Filling
                                               Only                                Only
      Weyba 3.5                  2.07           2.07                2.08           0.000                0.004
     Weyba 3.85                  2.07           2.07                2.08           0.000                0.004
     Weyba 4.35                  2.07           2.07                2.08           0.000                0.005
      Weyba 4.8                  2.07           2.07                2.07           0.000                0.004
      Weyba 5.3                  2.06           2.06                2.06           0.000                0.004
      Weyba 5.8                  2.05           2.05                2.05           0.000                0.003
      Weyba 6.5                  2.04           2.04                2.04           0.000                0.000


Due to the unique location of the site, where the upstream properties are located at higher surface levels,
and the provision of suitably sized waterway corridors within the site, filling has resulted in negligible impact
for surrounding properties for both the regional and local flood events. For some surrounding areas the flood
levels have actually been improved.
Around Lake Weyba and Weyba Creek the peak flood levels are dominated by the regional flood levels. The
local flood levels in this area, with MHWS as the tailwater condition, are significantly lower. Due to the
location of Lake Weyba near the mouth of the Noosa River the regional flood level is controlled by the
assumed tailwater level of Noosa River, i.e. the storm surge level. The storm surge level is unlikely to be
impacted on by filling of the floodplain. With the impact of climate change the influence of increased storm
surge levels on regional flood levels is likely to become even more dominant in the low-lying areas of Noosa.
The filling proposed for the site has also taken into account the potential impact of climate change.




Northbrook Corporation Pty Ltd                         Version 4                                  16 September 2013
Flood Study v4 2.doc                             Commercial in Confidence                                  Page 29

Section 35

Noosa on Weyba
Flood Study




10                     Conclusion
The proposed development of Noosa on Weyba has been shown through TUFLOW modelling to:
      have no adverse impacts on flood levels and flows for surrounding properties for local and regional flood
       events;
      reduce the 100 year ARI event the peak flood level around Lake Entrance Boulevard due to flow
       attenuation being proposed within the site;
      provide 100 year ARI trafficability for all proposed and upgraded roads;
      provide PMF evacuation routes for all areas of the site; and
      improve flood access for neighbouring properties.
The flood levels used to set the development levels for the site include the potential impact of climate
change.
The proposed filling within the site will reduce available flood storage, although compared to the available
storage in Lake Weyba and the surrounding floodplain, the reduction is minimal. Flood modelling has shown
that the impact of the reduced flood storage is contained within the site. Cumulative flood impact modelling
has shown that filling of similar areas around Lake Weyba and Weyba Creek has a negligible impact on
regional flood levels, as these are dominated by storm surge levels. However, filling of these areas would
likely have an impact on local flood levels, and it would likely not be possible to fill to the extent modelled. It
is only due to the unique location of the site and the maintenance of local flow paths that filling within the site
is achievable without adverse impacts on neighbouring properties.
Dense revegetation of the western drainage channel is considered to be achievable with acceptable flood
impacts for the site and surrounding properties should this be desirable.




Northbrook Corporation Pty Ltd                      Version 4                                     16 September 2013
Flood Study v4 2.doc                          Commercial in Confidence                                     Page 30

Section 36

Noosa on Weyba




FIGURES



Figure 1   Site Location
Figure 2   WBNM Sub-catchments
Figure 3   TUFLOW Model Setup
Figure 4   TUFLOW Comparison Points
Figure 5   Existing Case DEM
Figure 6   100 Year ARI Existing Case Peak Water
           Level (Local and Regional)
Figure 7   100 Year ARI Existing Case Peak Depth
           (Local and Regional)
Figure 8   100 Year ARI Existing Case Peak
           Velocity (Local and Regional)
Figure 9   10 Year ARI Existing Case Peak Water
           Level (Local and Regional)
Figure 10 2 Year ARI Existing Case Peak
          Water Level (Local and Regional)
Figure 11 February 2012 Flood Event – Peak
          Water Level
Figure 12 100 Year ARI Existing Case Peak
          Water Level with Climate Change
Figure 13 Proposed Development Plan
Figure 14 Evacuation Routes
Figure 15 Developed Case DEM

Section 37

Noosa on Weyba




FIGURES




Figure 16   100 Year ARI Developed Case Peak Water Level
            (Local and Regional)
Figure 17   100 Year ARI Developed Case Peak Depth (Local
            and Regional)
Figure 18   100 Year ARI Developed Case Peak Velocity
            (Local and Regional)
Figure 19   10 Year ARI Developed Case Peak Water Level
            (Local and Regional)
Figure 20   2 Year ARI Developed Case Peak Water Level
            (Local and Regional)
Figure 21   100 Year ARI Developed Case Peak Water
            Level with Climate Change
Figure 22   Flood Level Impact – Design Event 1 (100
            Year ARI Local)
Figure 23   Flood Level Impact – Design Event 2 (50
            Year ARI Local)
Figure 24   Flood Level Impact – Design Event 3
            (20 Year ARI Local)
Figure 25   Flood Level Impact – Design Event 4
            (10 Year ARI Local)
Figure 26   Flood Level Impact – Design Event 5
            (5 Year ARI Local)
Figure 27   Flood Level Impact – Design Event
            6 (2 Year ARI Local)

Section 38

Noosa on Weyba




FIGURES




Figure 28   Flood Level Impact – Design Event 7 (1 Year ARI
            Local)
Figure 29   Flood Level Impact – Design Event 8 and 9 (100
            Year ARI Storm Surge)
Figure 30   Flood Level Impact – Design Event 10 (100 Year
            ARI Regional)
Figure 31   Flood Level Impact – Design Event 11 (50 Year
            ARI Regional)
Figure 32   Flood Level Impact – Design Event 12 (20 Year
            ARI Regional)
Figure 33   Flood Level Impact – Design Event 13 (10
            Year ARI Regional)
Figure 34   Flood Level Impact – Design Event 14 (5
            Year ARI Regional)
Figure 35   Flood Level Impact – Design Event 15 (2
            Year ARI Regional)
Figure 36   Sensitivity Analysis – Impact of
            Revegetation of Waterway Corridor
Figure 37   Sensitivity Analysis – Impact of Culvert
            Blockage (20%)
Figure 38   Sensitivity Analysis – Impact of
            Culvert Blockage (100%)
Figure 39   Developed Case PMF (Local) Peak
            Depth
Figure 40   Developed Case PMF (Local)
            Peak Depth

Section 39

NOOSA ON WEYBA
FLOOD STUDY

aS
Beil sae

‘Aerial image sorced from Google Earth

© Cardno (Qld) Pty Ltd All Rights Reserved 2012

Copyright in the whole and every part ofthis drawing belongs to Cardno (Qld) Py Lid and
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Lic

‘This document is produced by Gardno (Qld) Pty Ltd solely for the beneft of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Ply Lid does not

and shall nol assume any responsibilty or liability whatsoever to any third party arising out of
any use oF reliance by third party on the content of this docunent,

Rev: 0 | Drawn: J.M. | Checked: N.G.| Date: 18/09/2012
Northbrook Corporation Pty Ltd

w1Fl igur

sf

a

250 0 250 500 750 1000 1250m
125,000

LEGEND

| Site boundary

GREAT SANDY N P
Fraser Island

NP

North Stradbroke Island
nleigh

Scale 1:25,000 (A3)
FIGURE 1
SITE LOCATION

Project N 5101/19/3

PRINT DATE

 

Section 40

                                                                                                                                                                                                                                                                                                                                                                                   O:\5101-19-03\Figures\R1V1 Flood Study
                                                                                                                                                                                                                                                                 Figure 2
                                                                                                                                                                                                                                                                 WBNM Sub-catchments

                                                                                                                                                                                                                                         LW_63
                                                                                                                                                                                                                  LW_62                  99.7ha
                                                                                                                                                                                                                  222.5ha                                         Noosa on Weyba
                                                                                                                                                                                                                                                                  Flood Study

                                                                                 EC_A1
                                                                                 165.9ha
                                                                                                               EC_A2
                                                                                                                                                                                                                                          LW_70
                                                                                                                                                                                                                                          138.6ha
                                                                                                                                                                                                                                                               LEGEND
                                                                                                               64.4ha
                                                                                                                                     EC_A3            EC_A4                                                  Weyba Ck
                                                                                                                                     27.4ha           93.3ha

                                                              EC_B1                                                                                                                                                                                                                                  WBNM Catchment
                                                              299.1ha                                                                                    EC_A5
                                                                                                             EC_B2                                       24.9ha
                                                                                                                                                                                          EC_A6                                                                                                      Waterway
                                                                                                             50.4ha
                                                                                                                                           EC_D1                                          143.7ha
                                                                                                                                                        EC_F8
                                                                                                                                            5.3ha
                                                                                                                            EC_C2
                                                                                                                              Crossing 3

                                                                                                                                                        3.7ha                                                                                                                                        DCDB
                                                                                                                             8ha                                                                      Eenie Ck
                                                                                                                                                     EC_F7     KC_H3
                                                                                                                                           EC_F6
                                                                                                                                                     6.3ha      8.5ha
                                                                                    EC_C1                                                  17.7ha
                                                                                                          EC_E2                                                                   KC_H4
                                                                                    72.5ha                          EC_E3
                                                                                                          24.5ha          EC_F4                                                    63ha
                                                                                                                    6.3ha                     EC_F3                  KC_H2
                                                                                                                          12.9ha                                     29.9ha                         Keyser Ck
                                                                                                                                              5.8ha

                                                                                                                                                                KC_I3                     LW_A                              Lake Weyba              LW_69
                                                                                                                              EC_F1                             14.5ha                    6.8ha                                                     156.5ha
                                                                                                                                                                              KC_I4
                                                                                                                              27.1ha                                          12.3ha
                                                                                             EC_E1                                                                                         LW_B
                                                                                             246.5ha                                                                                       3.9ha


                                                                                                                                                    KC_I1                KC_I2
                                                                                                                                                                         42.5ha                                      LW_64
                                                                                                                                                    97.1ha                                                           997.2ha




     Scale: 1:20,000
                                                               EC_A5                                                                                                                                                                                                         350                0              350              700              1050
                                                               24.9ha                                                                                                                                   LW_65
EC_B2                                                                                                                                                                                                  1468.5ha
50.4ha                                                                                                             EC_A6                                                                                                                                                                                    Metres
                                                                                                                   143.7ha                                                                                                                                                                      Scale: 1:35,000
                                    EC_D1
                       Crossing 3
                                     5.3ha                 EC_F8
                                                           3.7ha
                    EC_C2
                     8ha
                                                        EC_F7        KC_H3
                                    EC_F6               6.3ha EC_G1 8.5ha                                                                                                                                                                                              Cardno (QLD) Pty Ltd | ABN 57 051 074 992
         EC_E4                      17.7ha                     4.8ha                                                                                                                                                                                                   Level 11, North Tower, 515 St Pauls Terrace
                                                EC_F5
          7.9ha                                                                                                                                                                                                                                                        Locked Bag 4006, Fortitude Valley QLD 4006
                                                9.5ha
                                                                                                  KC_H4                                                                                                                                                                Tel: 07 3369 9822       Fax: 07 3369 9722
           EC_E3                                                                                   63ha                                                                                                                                                       "© 2009 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this document
                                                                                                                                                                                                                                                              belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in
            6.3ha        EC_F4                                                                                                                                                                                                                                part in any manner or form or in or on any media to any person without the prior written consent of


              EC_F2
                         12.9ha              EC_F3
                                             5.8ha
                                                                                   KC_H2
                                                                                   29.9ha                                              Keyser Ck                                                                                                              Cardno (Qld) Pty Ltd."

                                                                                                                                                                                                                                                              This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client in
                                                                                                                                                                                                                                                              accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not and shall not assume any
              3.7ha                                                                                                                                                                                                                                           responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on
                                                                                                                                                                                                                                                              the content of this document.
                                                     KC_H1
                                                     31.3ha                                                                                                                                                                                                    SHEET                                                               A3
                                                                        KC_I3                      KC_I5                                                                                                                                                                                                                  5101-19-03
                                                                                                                    LW_A                                                                                                                                       Project No:
                                                                        14.5ha                     10.3ha
                          EC_F1                                                                                     6.8ha
                                                                                                 KC_I4                                                                                                                                                         Date:                                                      15 October 2012
                          27.1ha
                                                                                                 12.3ha                                                                                                                                                        Revision Number:
                                                                                                                      LW_B
                                                                                                                      3.9ha                                                                                                                                    Designed by:
                                                                                                                                                                                                                                                               Client Name:                                  Northbrook Corporation Pty Ltd

Section 41

                                                                                                                                                                                                                   O:\5101-19-03\Figures\R1V1 Flood Study
                                                                                                 Figure 3
                                                                                                 TUFLOW Model Setup


                                                                                                   Noosa on Weyba
                                                                                                   Flood Study


                 Crossing 1                                                                    LEGEND


                                                                                                           Roughness Values
                                                                                                           Remaining areas dense vegetation
                                                                                                                   waterway
                                                                                                                   urban area




                                                                                          e
                                                                                    D ri v
                                                                                                                   grass, few trees




                                                                                 ay
                                                                                  H
                                                                                                                   roadway




                                                                               er
                                                                           alt
                                                                           W
             Crossing 2

                                                                                                                                     Culvert
Crossing 3
                              Aspera Pl                                                                                             2D/1D Connection or 2D inflow
         Crossing 3

                                                                                                                                    2D Inflow

                                                                                                                                     DCDB

                                                                                                                                    2D Model Extent

                                                                                                                                    Site




                                  Hollett Road




                                                                                                                Image sourced from Nearmap, 2012


                                                                                                             125                0              125              250              375

                                                                                                                                            Metres
                                                                                                                                Scale: 1:12,500




                                                                                                       Cardno (QLD) Pty Ltd | ABN 57 051 074 992
                                                                                                       Level 11, North Tower, 515 St Pauls Terrace
                                                                      ad
                                                                   Ro                                  Locked Bag 4006, Fortitude Valley QLD 4006
                                                         w   ell                                       Tel: 07 3369 9822       Fax: 07 3369 9722
                                                      ds
                                                 Ti                                           "© 2009 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this document
                                                                                              belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in
                                                                                              part in any manner or form or in or on any media to any person without the prior written consent of
                                                                                              Cardno (Qld) Pty Ltd."

                                                                                              This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client in
                                                                                              accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not and shall not assume any
                                                                                              responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on
                                                                                              the content of this document.


                                                                                               SHEET                                                               A3
                                                                                               Project No:                                                5101-19-3
                                                                                               Date:                                                      18 October 2012
                                                                                               Revision Number:
                                                                                               Designed by:
                                                                                               Client Name:                                   Northbrook Corporation Pty Ltd

Section 42

                                                                                                                                                                                                                                                                                                            O:\5101-19-03\Figures\R1V1 Flood Study
                                                                                                                                                                                          Figure 4
                                                                                                                                                                                          Comparison Points


                                                                                                                                                                                            Noosa on Weyba
                                                                                                                                                                                            Flood Study




                      EC1
                             LEB1 us
                                  Crossing 1                                                                                                                                            LEGEND
                                                  EC1




                                                                 EC2
                                                                           EC2                                                                                                                                               Water Level / Velocity
                                                                                                                                                                                                                             Comparison Point

                                    LE                                                                                                                                                                                       Flow Comparison Line




                                                                                                                                             e
                                                                                                                                         ri v
            LEB2 us




                                                                                                                          3
                                       B2




                                                                                                                                       D
                                                                                                                       EC
                            LEB2 ds




                                                                                                                                    ay
                                                     ds




                                                                                                                                     H
                                                                                                                                                                                                                             DCDB




                                                                                                                                  er
                                                                                                                              alt
                                                           AspPl ds




                                                                                                                              W
                         Crossing
                       LEB2  us 2
                                                          As                                                            EC3                                                                                                  2D Model Extent
                                                            pP                         H13




                                                                                                                                                                           EC4
                                                                 ld
            Crossing 3                                                s                                                                                                                                                      Site
                      LEB3 LEB3 us AspPl us Pl                                          Q5                                                       EC4
                        Crossing 3
                                      Aspera                                                                                                                                     EC5
                                           As p
                            LE                                                  H12
                                 B3
                                            Pl u
                                      us
                                                                          H11
                                                 s


                                                                           Q4


      H15
                                                                                                                                                                      H7
                                                           H10
H14                                                                                                                                                    Q3




                                                                                                                                                                 H6




                                                          Hollett Road                                                      NBK03_road
                                                                                                                       H8
                            H9
                                                                                                                                                 NBK02_road H5



                                                                                                                                                             H4
                                                                                                                                                                                                         Image sourced from Nearmap, 2012


                                                                                                                                                                                                      125                0              125              250              375
                                                                                                                                                    H3
                                                                                                                                                            H2                                                                       Metres
                                                                                                                                                                                                                         Scale: 1:12,500
                                                                                                                                                       H1



                                                                                                                                         H0
                                                                                                                                                                                                Cardno (QLD) Pty Ltd | ABN 57 051 074 992
                                                                                                                                                                                                Level 11, North Tower, 515 St Pauls Terrace
                                                                                                                  ad
                                                                                                               Ro                                                                               Locked Bag 4006, Fortitude Valley QLD 4006
                                                                                                     w   ell                                                                                    Tel: 07 3369 9822       Fax: 07 3369 9722
                                                                                                  ds
                                                                                             Ti                                                                                        "© 2009 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this document
                                                                                                                                                                                       belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in
                                                                                                                                                                                       part in any manner or form or in or on any media to any person without the prior written consent of
                                                                                      TidsRd                                                                                           Cardno (Qld) Pty Ltd."

                                                                                                                                                                                       This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client in
                                                                                                                                                                                       accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not and shall not assume any
                                                                                                                                                                                       responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on
                                                                                                                                                                                       the content of this document.


                                                                                                                                                                                        SHEET                                                               A3
                                                                                                                                                                                        Project No:                                                5101-19-3
                                                                                                                                                                                        Date:                                                      18 October 2012
                                                                                                                                                                                        Revision Number:
                                                                                                                                                                                        Designed by:
                                                                                                                                                                                        Client Name:                                   Northbrook Corporation Pty Ltd

Section 43

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                Scale 1:12,500 (A3)
                                                                                                                                                                                   FIGURE 5
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         EXISTING CASE DEM
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 44

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                             HOLLET
                                                                                                                                                                      ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                Scale 1:12,500 (A3)
                                                                                                                                                                                                                   FIGURE 6
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         100 YEAR ARI EXISTING CASE PEAK WATER LEVEL (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 45

NOOSA ON WEYBA
FLOOD STUDY




                                                                           HOLLET ROAD

                                                                                                                                                HOLLET
                                                                                                                                                         ROAD
                                                                                                                 E
                                                                                                               IV
                                                                                                             DR
                                                                                                             Y
                                                                                                           HA
                                                                                                      ER
                                                                                                       T
                                                                                                    AL
                                                                                                W




                                                                                                                                            D
                                                                                                                                     R   OA
                                                                                                                                  LL
                                                                                                                         S   WE
                                                                                                                     TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                 Scale 1:12,500 (A3)
                                                                                                                                                                                                                    FIGURE 7
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                100 YEAR ARI EXISTING CASE PEAK DEPTH (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 46

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                             Scale 1:12,500 (A3)
                                                                                                                                                                                                                FIGURE 8
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         100 YEAR ARI EXISTING CASE PEAK VELOCITY (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 47

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                            HOLLET
                                                                                                                                                                     ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                               Scale 1:12,500 (A3)
                                                                                                                                                                                                                  FIGURE 9
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         10 YEAR ARI EXISTING CASE PEAK WATER LEVEL (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 48

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                           HOLLET
                                                                                                                                                                    ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                              Scale 1:12,500 (A3)
                                                                                                                                                                                                               FIGURE 10
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         2 YEAR ARI EXISTING CASE PEAK WATER LEVEL (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 49

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                            Scale 1:12,500 (A3)
                                                                                                                                                                                                             FIGURE 11
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FEBRUARY 2012 FLOOD EVENT - PEAK WATER LEVEL
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 50

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                            HOLLET
                                                                                                                                                                     ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                               Scale 1:12,500 (A3)
                                                                                                                                                                                                                FIGURE 12
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         100 YEAR ARI EXISTING CASE PEAK WATER LEVEL WITH CLIMATE CHANGE
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 51

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                                        Easement Crossing




                                                                                                                                 Precinct I
                                                                                                                                                                             Precinct H
                                                                  Precinct J




           Precinct L




                           Precinct K
                                                                                       HOLLET ROAD
                                                                                        Internal Road

                                                                                                                                                        Tributary Crossing

                                                                                                                                                                                                                                HOLLET
                                                                                                                                                                                                                   Bikeway               ROAD


                                                                                                                                                                                          Precinct G
                                                                                                                    E
                                                                                                                  IV
                                                                                                                DR




                                                                                                                                                                                                                                            Precinct D       Precinct C
                                                                                                                 Y
                                                                                                              HA
                                                                                                          R
                                                                                                         TE




                                                                                                                                                                                                                                                                          Precinct B
                                                                                                         AL




                                                                                                                                                                                                                   Precinct F
                                                                                                        W




                                                                                                                                                                                                                                                Precinct E


                                                                                                                                                                                              Lot 11 Access Road




                                                                                                                                                         OAD
                                                                                                                                                       LR
                                                                                                                                                  EL
                                                                                                                                              W
                                                                                                                                            DS
                                                                                                                                       TI
     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                                                                                       Scale 1:7,500 (A3)
                                                                                                                                                                                                                                                                                       FIGURE 13A
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                                                                                                             PROPOSED DEVELOPMENT PLAN
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 52

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                                                                                    Minimum floor level
                                                                                                                                                                    3.98 mAHD




                                                                                                                                     Easement Crossing
                                                                                                              Minimum road level
                                                                                                              4.30 mAHD
                                                                                                                                      Minimum road level
                                                                                                                                      5.12 mAHD


                                                                                                                                                                                                      Minimum floor level
                                                                                                                                                                                                      3.51 mAHD
                                                                                                                                              Precinct I
                                                                                                                                                                                                         Precinct H
                                                                  Precinct J




      Minimum floor level
      5.90 mAHD



           Precinct L




                         Minimum floor level
                         7.66 mAHD
                           Precinct K                        Minimum road level
                                                             7.35 mAHD                 HOLLET ROAD             Minimum floor level
                                                                                                                                                                                             Varying road level
                                                                                        Internal Road                                                                             5.85
                 Minimum floor level                                                                           8.03 mAHD
                 8.03 mAHD                                                                                                                                                                  5.70           5.00         4.20                                      Minimum road level
                                                                                                                                                                                                                                                                  1.60 mAHD
                                                                                                                                                                                                                                                                                            HOLLET
                                                                                                                                                                       Tributary Crossing                                                                                 Bikeway                    ROAD
                                                                                                                                                                                                                    4.10




                                                                                                                                                                                                                                     Precinct G
                                                                                                                       E




                                                                                                                                                                                                                                   Minimum floor level
                                                                                                                     IV




                                                                                                                                                                                                                                   3.30 mAHD
                                                                                                                   DR




                                                                                                                                                                                                                                                                                                        Precinct D       Precinct C
                                                                                                                 Y
                                                                                                              HA




                                                                                                                                                                                                                                                                                                                                      Minimum floor level
                                                                                                                                                                                                                                                                                                                                      3.22 mAHD
                                                                                                          R




                                                                                                                                                                                                                                                                      Minimum floor level
                                                                                                         TE




                                                                                                                                                                                                                                                                      3.30 mAHD
                                                                                                                                                                                                                                                   Minimum road                                                                           Precinct B
                                                                                                         AL




                                                                                                                                                                                                                                                   level                 Precinct F
                                                                                                                                                                                                                                                   3.83 mAHD
                                                                                                        W




                                                                                                                                                                                                                                                                                                            Precinct E
                                                                                                                                                                                                                     Lot 11 Access Road
                                                                                                                                                                                                                                            Debris deflector
                                                                                                                                                                                                                                            walls on inlets




                                                                                                                                                                      OAD
                                                                                                                                                                    LR
                                                                                                                                                               EL
                                                                                                                                                           W
                                                                                                                                                         DS
                                                                                                                                                    TI
     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                      Minimum road level                                                                                                                                                                                    Scale 1:7,500 (A3)
                                                                                                                                                      4.15 mAHD
                                                                                                                                                                                                                                                                                                                                                            FIGURE 13B
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                                                                                                                                                                         PROPOSED DEVELOPMENT PLAN
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 53

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                                 Ea se m
                                                                                                                           ent Cros
                                                                                                                                   sing




                                                                                                                                          Precinct I
                                                                                                                                                                                     Precinct H
                                                                         Precinct J




                  Precinct L




                             Precinct K
                                                                 Internal Road                HOLLET ROAD
                                                                                                                                                                Tributary Crossing

                                                                                                                                                                                                                                      HOLLET
                                                                                                                                                                                                                                               ROAD


                                                                                                                                                                                                  Precinct G
                                                                                                                     E
                                                                                                                   IV
                                                                                                                 DR




                                                                                                                                                                                                                                                  Precinct D
                                                                                                                Y




                                                                                                                                                                                                                                                                   Precinct C
                                                                                                             HA
                                                                                                            R
                                                                                                            TE




                                                                                                                                                                                                                                                                                Precinct B
                                                                                                        AL




                                                                                                                                                                                                                         Precinct F
                                                                                                       W




                                                                                                                                                                                                                                                      Precinct E
                                                                                                                                                                                                    Lot 11 Access Road




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
                                                                                                                                                                 OAD                                                                                                                         Scale 1:7,500 (A3)
                                                                                                                                                               LR
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and


                                                                                                                                                                                                                                                                                             FIGURE 14
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or


                                                                                                                                                          EL
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.


                                                                                                                                                      W                                                                                                                 FLOOD EVACUATION ROUTES
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by


                                                                                                                                                    DS
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of


                                                                                                                                               TI
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 54

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                          HOLLET
                                                                                                                                                                   ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL




                                                                                                                                                                          MOST INTERNAL
                                                                                                             W




                                                                                                                                                                          KERB RETURN RADII = 8.0m




                                                                                                                                                      D
                                                                                                                                               R   OA
                                                                                                                                            LL
                                                                                                                                   S   WE
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2012.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                              Scale 1:12,500 (A3)
                                                                                                                                                                                                               FIGURE 15
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                                                     DEVELOPED CASE DEM
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 55

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                               HOLLET
                                                                                                                                                                        ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL




                                                                                                                                                                               MOST INTERNAL
                                                                                                             W




                                                                                                                                                                               KERB RETURN RADII = 8.0m




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                 Scale 1:12,500 (A3)
                                                                                                                                                                                                                  FIGURE 16
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         100 YEAR ARI DEVELOPED CASE PEAK WATER LEVEL (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 56

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                           Scale 1:12,500 (A3)
                                                                                                                                                                                                            FIGURE 17
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         100 YEAR ARI DEVELOPED CASE PEAK DEPTH (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 57

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                            HOLLET
                                                                                                                                                                     ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                              Scale 1:12,500 (A3)
                                                                                                                                                                                                               FIGURE 18
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         100 YEAR ARI DEVELOPED CASE PEAK VELOCITY (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 58

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                              HOLLET
                                                                                                                                                                       ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL




                                                                                                                                                                              MOST INTERNAL
                                                                                                             W




                                                                                                                                                                              KERB RETURN RADII = 8.0m




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                Scale 1:12,500 (A3)
                                                                                                                                                                                                                 FIGURE 19
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         10 YEAR ARI DEVELOPED CASE PEAK WATER LEVEL (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 59

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                             HOLLET
                                                                                                                                                                      ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                               Scale 1:12,500 (A3)
                                                                                                                                                                                                                FIGURE 20
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         2 YEAR ARI DEVELOPED CASE PEAK WATER LEVEL (LOCAL AND REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 60

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                               HOLLET
                                                                                                                                                                        ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL




                                                                                                                                                                               MOST INTERNAL
                                                                                                             W




                                                                                                                                                                               KERB RETURN RADII = 8.0m




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                Scale 1:12,500 (A3)
                                                                                                                                                                                                                 FIGURE 21
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         100 YEAR ARI DEVELOPED CASE PEAK WATER LEVEL WITH CLIMATE CHANGE
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 61

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL




                                                                                                                                                                         MOST INTERNAL
                                                                                                             W




                                                                                                                                                                         KERB RETURN RADII = 8.0m




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                                              Scale 1:12,500 (A3)
                                                                                                                                                                                                                                               FIGURE 22
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                                                    FLOOD LEVEL IMPACT - DESIGN EVENT 1 (100 YEAR LOCAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 62

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                  Scale 1:12,500 (A3)
                                                                                                                                                                                                                   FIGURE 23
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 2 (50 YEAR LOCAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 63

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                  Scale 1:12,500 (A3)
                                                                                                                                                                                                                   FIGURE 24
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 3 (20 YEAR LOCAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 64

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                  Scale 1:12,500 (A3)
                                                                                                                                                                                                                   FIGURE 25
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 4 (10 YEAR LOCAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 65

NOOSA ON WEYBA
FLOOD STUDY




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                            Scale 1:12,500 (A3)
                                                                                                                                             FIGURE 26
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                    FLOOD LEVEL IMPACT - DESIGN EVENT 5 (5 YEAR LOCAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 66

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                 Scale 1:12,500 (A3)
                                                                                                                                                                                                                  FIGURE 27
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 6 (2 YEAR LOCAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 67

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                 Scale 1:12,500 (A3)
                                                                                                                                                                                                                  FIGURE 28
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 7 (1 YEAR LOCAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 68

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                                HOLLET
                                                                                                                                                                         ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                    Scale 1:12,500 (A3)
                                                                                                                                                                                                                     FIGURE 29
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 8 AND 9 (100 YEAR ARI STORM SURGE)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 69

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                   Scale 1:12,500 (A3)
                                                                                                                                                                                                                    FIGURE 30
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                     FLOOD LEVEL IMPACT - DESIGN EVENT 10 (100 YEAR REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 70

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                      Scale 1:12,500 (A3)
                                                                                                                                                                                                                       FIGURE 31
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 11 (50 YEAR REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 71

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                      Scale 1:12,500 (A3)
                                                                                                                                                                                                                       FIGURE 32
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 12 (20 YEAR REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 72

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                      Scale 1:12,500 (A3)
                                                                                                                                                                                                                       FIGURE 33
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 13 (10 YEAR REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 73

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                     Scale 1:12,500 (A3)
                                                                                                                                                                                                                      FIGURE 34
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 14 (5 YEAR REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 74

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                     Scale 1:12,500 (A3)
                                                                                                                                                                                                                      FIGURE 35
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         FLOOD LEVEL IMPACT - DESIGN EVENT 15 (2 YEAR REGIONAL)
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 75

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                                HOLLET
                                                                                                                                                                         ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID


* Sensitivity analysis results
  compared to developed
  case


     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                  Scale 1:12,500 (A3)
                                                                                                                                                                                                                   FIGURE 36
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                         SENSITIVITY ANALYSIS - IMPACT OF REVEGETATION OF WATERWAY CORRIDOR
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 76

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID



* Sensitivity analysis results
  compared to developed
  case

     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                     Scale 1:12,500 (A3)
                                                                                                                                                                                                                      FIGURE 37
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         SENSITIVITY ANALYSIS - IMPACT OF 20% CULVERT BLOCKAGE
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 77

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID



* Sensitivity analysis results
  compared to developed
  case

     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                      Scale 1:12,500 (A3)
                                                                                                                                                                                                                       FIGURE 38
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         SENSITIVITY ANALYSIS - IMPACT OF 100% CULVERT BLOCKAGE
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 78

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                           Scale 1:12,500 (A3)
                                                                                                                                                                                                            FIGURE 39
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         DEVELOPED CASE PMF (LOCAL) PEAK WATER LEVEL
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Section 79

NOOSA ON WEYBA
FLOOD STUDY




                                                                                                    HOLLET ROAD

                                                                                                                                                         HOLLET
                                                                                                                                                                  ROAD
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR
                                                                                                                       Y
                                                                                                                     HA
                                                                                                                 TER
                                                                                                              AL
                                                                                                             W




                                                                                                                                                     D
                                                                                                                                              R   OA
                                                                                                                                       E   LL
                                                                                                                                     SW
                                                                                                                               TID




     Cardno (Qld) Pty Ltd All Rights Reserved 2013.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                     Scale 1:12,500 (A3)
                                                                                                                                                                                                      FIGURE 40
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                         DEVELOPED CASE PMF (LOCAL) PEAK DEPTH
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

The text continues on section 80.

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.