Council archive · source document
Attachment 13- Amended Flood Study MCU12/0208
Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 104, section 1. The text section number identifies this passage in the reader.
Design Events
1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF
2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change
4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change
Table G 1 Existing Case Peak Flows
Existing Case Peak Flows (m3/s)
Design Event
Comparison 17
Location 8 and
Point 1 2 3 4 5 6 7 10 11 12 13 14 15 16 and
9
18
upstream of
Q1 23.3 19.1 16.4 12.4 9.4 5.2 2.9 23.3 13.4 11.2 9.3 7.3 5.8 3.5 98.0 28.9
Lot 11
Q2 Lot 11 25.8 21.2 17.9 13.6 10.2 5.6 3.1 25.8 15.0 12.6 10.5 8.3 6.6 3.9 97.2 31.5
downstream
Q3 28.7 23.6 20.1 15.2 11.6 6.6 3.8 28.7 18.9 16.0 13.0 10.2 8.1 4.7 113.4 39.9
Lot11
upstream of
Q4 17.2 14.6 13.1 10.4 8.3 4.9 2.9 17.2 8.1 6.9 5.9 4.8 3.9 2.5 62.4 20.5
easement
downstream of
Q5 15.1 13.1 11.7 9.9 8.3 4.9 2.8 15.2 8.1 6.8 5.7 4.5 3.7 2.6 49.4 18.5
easement
Q6 Precinct L 49.4 41.1 36.0 28.3 22.7 13.7 8.9 49.5 27.2 23.1 19.3 15.4 12.4 8.0 207.4 60.1
upstream of
LEB3 us LEB Crossing 63.6 52.8 45.9 35.9 28.0 17.4 10.6 63.9 35.9 30.2 25.2 20.1 16.4 10.1 280.3 78.3
3
upstream of
AspPl us 56.0 48.5 42.7 32.5 25.1 15.6 9.1 56.1 33.8 28.2 23.2 18.2 14.3 8.2 186.8 62.3
Aspera Pl
downstream of
AspPl ds 52.5 45.5 40.2 32.7 24.6 13.1 7.0 52.6 33.1 28.6 23.3 18.2 14.3 8.2 178.9 59.3
Aspera Pl
upstream of
LEB2 us LEB Crossing 64.6 54.3 48.1 38.2 30.5 18.7 12.0 64.6 34.8 29.7 24.9 20.1 16.3 10.6 237.4 77.0
2
LEB - adjacent
LEB2 ds 67.2 54.6 47.9 38.1 30.6 19.4 12.7 67.4 36.1 31.0 26.2 21.3 17.8 12.1 320.4 87.7
to flooded lots
EC1 Eenie Ck 42.9 35.2 30.7 25.2 20.5 13.1 8.5 43.0 22.6 19.4 16.5 13.4 11.0 7.2 168.6 52.3
EC2 Eenie Ck 106.2 86.6 75.3 59.2 47.4 30.9 20.0 106.9 59.8 50.9 42.6 34.5 28.2 19.1 479.8 137.4
Northbrook Corporation Pty Ltd 13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App G - Peak Flows.docx Page 1
[OCR of page images]
Sa) Cardno
Design Events
1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF
2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change
4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change
TableG1 Existing Case Peak Flows
Existing Case Peak Flows (m*/s)
Design Event
Comparison | | ocati 8 and 17
Point ocation 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 and
18
Qi ipa of 23.3 | 191 | 164 | 124] 94 | 52 | 29 | 233] 134] 11.2] 93 | 73 | 58 | 35 | 98.0 | 289
Q2 Lot 11 25.8 | 212] 179 | 136 | 102] 56 | 31 | 258 | 150] 126/105 | 83 | 66 | 39 | 972 | 315
Q3 rownstream 28.7 | 23.6 | 201 | 152] 116 | 66 | 38 | 28.7] 189 | 16.0] 13.0 | 10.2 | 81 | 47 | 113.4] 39.9
upstream of
Q4 casement 172 | 146 | 131 | 104] 83 | 49 | 29 | 172 | 81 | 69 | 59 | 48 | 39 | 25 | 624 | 205
downstream of
Q5 casement 151 | 131 | 11.7] 99 | 83 | 49 | 28 | 152] 81 | 68 | 57 | 45 | 37 | 26 | 494 | 185
Q6 Precinct L 49.4 | 41.1 | 36.0 | 283 | 227 | 137 | 89 | 495 | 27.2 | 23.1 | 193 ] 154 | 124 | 80 | 207.4] 60.1
upstream of
LEB3 us LEB Crossing | 63.6 | 52.8 | 45.9 | 35.9 | 28.0 | 17.4 | 106 | 63.9 | 35.9 | 30.2 | 25.2 | 201 | 164 | 10.1 | 280.3] 783
3
AspPI us peor Pl 56.0 | 485 | 427 | 325 | 251 | 156 | 91 | 561 | 338 | 282 | 232 | 182 | 143 | 82 | 1868] 623
AspPI ds Aepora Pl of | 525 | 455 | 402 | 327 | 246 | 131 | 70 | 526 | 331 | 286 | 233 | 182 143 | 82 | 1789] 593
upstream of
LEB2 us LEB Crossing | 64.6 | 54.3 | 48.1 | 382 | 30.5 | 18.7 | 120 | 646 | 348 | 29.7 | 249 | 201 | 163 | 10.6 | 237.4] 77.0
2
LEB - adjacent
LEB2 ds fofloodedlote. | 672 | 546 | 47.9 | 38.1 | 30.6 | 194 | 127 | 67.4 | 36.1 | 31.0 | 26.2 | 21.3 | 17.8 | 121 | 320.4 | 87.7
ECI Eenie Ck 42.9 | 35.2 | 307 | 252 | 205 | 131 | 85 | 430 | 226] 194 | 165 | 134 | 11.0 | 72 | 1686 | 523
EC2 Eenie Ck 106.2] 86.6 | 75.3 | 59.2 | 47.4 | 309 | 200 | 1069] 598 | 509 | 426 | 345 | 28.2 | 19.1 | 479.8 | 137.4
Northbrook Corporation Pty Ltd 13 September 2013
45101-19-03\wp\R1v4 Flood Study\Appendices\App G - Peak Flows.docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.