Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 109, section 1. The text section number identifies this passage in the reader.

                                                                                               Difference in Peak Flow (Developed – Existing) (m3/s)
                                                                                                                  Design Event
 Comparison                                                                                                                                                                      17
                         Location                                                                                 8 and
 Point                                                  1              2    3       4      5         6       7              10      11      12     13     14     15     16      and
                                                                                                                    9
                                                                                                                                                                                 18
 EC2                     Eenie Ck                     0.0          0.0      0.1    0.3    0.2       0.0     0.0    -0.2     0.0    0.0     0.0     0.0    0.0    0.0    0.7     -0.2
 EC3                     Eenie Ck                     -0.9        -1.0     -1.3    -0.7   -0.3      0.3     0.2    -0.9    -1.0    -0.6    -0.4    0.0    0.1    0.1    4.3     -0.5
                         Eenie Ck and
 EC4                                                 -11.0       -10.9     -11.1   -9.7   -7.3     -3.2    -1.6    -2.8    -1.1    -1.2    -1.4    -1.6   -2.0   -1.8   -4.8    -0.7
                         Keyser Ck




Northbrook Corporation Pty Ltd                                                                                                                                          13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App G - Peak Flows.docx                                                                                                              Page 6


[OCR of page images]
 

Sa) Cardno

 

 

Difference in Peak Flow (Developed — Existing) (m*/s)
Design Event

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Comparison . 17

Point Location 1 2 3 4 5 6 7 {8 and 10 | 4 | 12 | 13: | 14 | 15 | 16 | ana

18

EC2 Eenie Ck 0.0 0.0 0.1 0.3 0.2 0.0 0.0 -0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.7 -0.2

EC3 Eenie Ck 0.9 | -1.0 | -1.3 | -0.7 | 03 | 03 | 02 | -09 | -1.0 | -06 | -04 | 00 | 0.1 0.1 43 | -05

Eenie Ck and

EC4 Keyser Ck -11.0 | -10.9 | -11.1 -9.7 -7.3 -3.2 -1.6 -2.8 -1.1 -1.2 -1.4 -1.6 -2.0 -1.8 4.8 -0.7

Northbrook Corporation Pty Ltd 13 September 2013

45101-19-03\wp\R1v4 Flood Study\Appendices\App G - Peak Flows.docx Page 6

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.