Council archive · source document
Attachment 13- Amended Flood Study MCU12/0208
Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 115, section 1. The text section number identifies this passage in the reader.
Developed Case Peak Velocities (m/s)
Design Event
Comparison 8 17
Location 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
Point
9 18
H10 Lot 53 0.29 0.30 0.30 0.30 0.30 0.29 0.31 0.29 0.29 0.29 0.29 0.29 0.27 0.28 0.44 0.28
upstream of
H11 0.38 0.39 0.22 0.29 0.34 0.33 0.38 0.38 0.35 0.38 0.22 0.28 0.29 0.23 0.59 0.32
easement
ease_road easement 0.57 0.47 0.47 0.00 0.00 0.00 0.00 0.57 0.00 0.00 0.00 0.00 0.00 0.00 2.08 0.76
downstream of
H12 0.69 0.64 0.61 0.60 0.58 0.52 0.46 0.69 0.48 0.51 0.51 0.48 0.45 0.42 0.97 0.60
easement
confluence
H13 0.12 0.11 0.11 0.10 0.10 0.10 0.09 0.12 0.07 0.07 0.06 0.07 0.07 0.07 0.15 0.10
Eenie Ck
upstream
H14 0.61 0.58 0.55 0.53 0.49 0.43 0.37 0.61 0.49 0.47 0.43 0.36 0.33 0.28 0.98 0.57
Precinct L
H15 Precinct L 0.64 0.60 0.57 0.53 0.50 0.44 0.38 0.64 0.50 0.48 0.41 0.39 0.36 0.29 0.90 0.59
upstream of
LEB3 us LEB Crossing 0.42 0.47 0.53 0.46 0.56 0.59 0.53 0.42 0.17 0.27 0.27 0.27 0.29 0.39 1.02 0.35
3
LEB Crossing
LEB3 0.56 0.29 0.17 0.00 0.00 0.00 0.00 0.57 0.00 0.00 0.00 0.00 0.00 0.00 1.21 1.01
3
upstream of
AspPl us 3.08 2.44 2.62 2.52 2.46 2.31 2.15 3.08 1.90 1.82 1.78 1.59 1.70 1.43 1.79 1.14
Aspera Pl
AspPl Aspera Pl 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.27 0.67
downstream of
AspPl ds 0.75 0.69 0.63 0.56 0.46 0.43 0.33 0.75 0.56 0.51 0.44 0.37 0.32 0.24 1.24 0.76
Aspera Pl
upstream of
LEB2 us LEB Crossing 1.91 0.55 1.61 0.51 0.34 0.54 0.69 1.91 0.38 0.33 0.39 0.22 0.36 0.97 1.13 0.68
2
LEB Crossing
LEB2 1.44 1.34 1.26 1.07 0.83 0.30 0.00 1.44 0.98 0.81 0.62 0.35 0.08 0.00 1.97 1.47
2
LEB - adjacent
LEB2 ds 1.10 1.10 1.07 1.07 1.11 1.04 1.03 1.10 0.87 0.96 0.98 0.96 0.95 0.95 1.31 0.91
to flooded lots
upstream of
LEB1 us LEB Crossing 1.07 0.88 0.73 0.44 0.00 0.00 0.00 1.07 0.00 0.00 0.00 0.00 0.00 0.00 1.71 1.28
1 (Eenie Ck)
LEB Crossing
LEB1 0.27 0.25 0.23 0.20 0.18 0.15 0.13 0.27 0.18 0.14 0.13 0.39 0.11 0.09 0.47 0.24
1
Northbrook Corporation Pty Ltd 13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App H - Peak Velocities.docx Page 5
[OCR of page images]
Developed Case Peak Velocities (m/s)
Design Event
Comparison . 8 17
Point Location 1 2 3 4 5 6 7 and | 10 11 12 13 14 15 16 | and
9 18
H10 Lot 53 0.29 | 0.30 | 0.30 | 0.30 | 0.30 | 0.29 | 0.31 | 0.29 | 0.29 | 0.29 | 0.29 | 0.29 | 0.27 | 0.28 | 0.44 | 0.28
H11 poate 0.38 | 0.39 | 0.22 | 0.29 | 0.34 | 0.33 | 0.38 | 0.38 | 0.35 | 0.38 | 0.22 | 0.28 | 0.29 | 0.23 | 0.59 | 0.32
ease_road | easement 0.57 | 0.47 | 0.47 | 0.00 | 0.00 | 0.00 | 0.00 | 0.57 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 2.08 | 0.76
H12 cownstream of | o.69 | 0.64 | 0.61 | 0.60 | 0.58 | 0.52 | 0.46 | 0.69 | 0.48 | 0.51 | 0.51 | 0.48 | 0.45 | 0.42 | 0.97 | 0.60
H13 pone 0.12 | 0.11 | 0.11 | 0.10 | 0.10 | 0.10 | 0.09 | 0.12 | 0.07 | 0.07 | 0.06 | 0.07 | 0.07 | 0.07 | 0.15 | 0.10
H14 aaa 0.61 | 0.58 | 0.55 | 0.53 | 0.49 | 0.43 | 0.37 | 0.61 | 0.49 | 0.47 | 0.43 | 0.36 | 0.33 | 0.28 | 0.98 | 0.57
H15 Precinct L 0.64 | 0.60 | 0.57 | 0.53 | 0.50 | 0.44 | 0.38 | 0.64 | 0.50 | 0.48 | 0.41 | 0.39 | 0.36 | 0.29 | 0.90 | 0.59
upstream of
LEB3 us LEB Crossing | 0.42 | 0.47 | 0.53 | 0.46 | 0.56 | 0.59 | 0.53 | 0.42 | 0.17 | 0.27 | 0.27 | 0.27 | 0.29 | 0.39 | 1.02 | 0.35
3
LEB3 3 Crossing | 956 | 0.29 | 0.17 | 0.00 | 0.00 | 0.00 | 0.00 | 0.57 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1.21 | 1.01
AspPI us peor Pl 3.08 | 2.44 | 2.62 | 2.52 | 2.46 | 2.31 | 2.15 | 3.08 | 1.90 | 1.82 | 1.78 | 1.59 | 1.70 | 1.43 | 1.79 | 1.14
AspPI Aspera Pl 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 3.27 | 0.67
AspPI ds Aepora Pl of | 075 | 069 | 063 | 056 | 0.46 | 0.43 | 033 | 0.75 | 056 | 051 | 0.44 | 037 | 0.32 | 0.24 | 1.24 | 0.76
upstream of
LEB2 us LEB Crossing | 1.91 | 0.55 | 1.61 | 0.51 | 0.34 | 0.54 | 0.69 | 1.91 | 0.38 | 0.33 | 0.39 | 0.22 | 0.36 | 0.97 | 1.13 | 0.68
2
LEB2 7 Crossing | 444 | 4.34 | 1.26 | 1.07 | 0.83 | 0.30 | 0.00 | 1.44 | 0.98 | 0.81 | 0.62 | 0.35 | 0.08 | 0.00 | 1.97 | 1.47
LEB - adjacent
LEB2 ds fo flooded ote | 110 | 1-10 | 1.07 | 1.07 | 1.11 | 1.04 | 1.03 | 1.10 | 0.87 | 0.96 | 0.98 | 0.96 | 0.95 | 0.95 | 1.31 | 0.91
upstream of
LEB1 us LEB Crossing | 1.07 | 0.88 | 0.73 | 0.44 | 0.00 | 0.00 | 0.00 | 1.07 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1.71 | 1.28
1 (Eenie Ck)
LEB1 ce Crossing | 997 | 0.25 | 0.23 | 0.20 | 0.18 | 0.15 | 0.13 | 027 | 0.18 | 0.14 | 0.13 | 0.39 | 0.11 | 0.09 | 0.47 | 0.24
Northbrook Corporation Pty Ltd
45101-19-03\wp\R1v4 Flood Study\Appendices\App H - Peak Velocities.docx
13 September 2013
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.