Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study



      Sub-                   Area        Fraction           Sub-             Area        Fraction
   catchment                 (ha)       Impervious       catchment           (ha)       Impervious

      EC_F4                  12.87          0.00           LW_70            138.55         0.33
      EC_F5                  9.55           0.00            LW_A                 6.84      0.00
      EC_F6                  17.65          0.00            LW_B                 3.85      0.00


An initial loss of 15mm and continuing loss of 2.5 mm/hr was assumed for pervious areas. An initial loss of
0mm and continuing loss of 0 mm/hr was assumed for impervious areas. These were the rainfall losses
adopted in the Noosa River RAFTS model.
The WBNM model was run for a range of storm durations to determine the peak flows. A lag factor of 1.3
was ultimately adopted for all sub-catchments. This is within the advised range of 1.3 to 1.8. The resultant
peak flows, compared to the Rational Method and the Noosa River RAFTS model, are shown in Table 4-4.
As this table shows the peak flows match fairly well with the Rational Method results. The peak flows were
compared to the RAFTS model for the 30 hour event, as this was the critical event for the regional flood
model and the RAFTS model was not run for the same range of durations as the WBNM model. The results
show a good correlation with the smaller catchments, but an overestimation of flows for the larger catchment.
Therefore the flows from the WBNM model are conservatively high when compared to this regional flood
model.
Table 4-4              Comparison to Rational Method Flows

       Sub-                 100 Year ARI Peak Flows              %
                                       3
    catchment                        (m /s)                 Difference
                            Rational        WBNM
      EC_A2                   47.9           46.0               -4.1
      EC_B2                   61.4           65.9               6.8
      EC_C1                   16.2           17.8               9.8
      EC_E4                   59.5           54.9               -7.7
       EC_F6                  20.3           19.5               -4.1
      KC_H2                   51.6           49.7               -3.8
       KC_I2                  34.7           30.2              -13.0
                           100 Year ARI Peak Flows 30
                                   Hour Event
                                        3
                                     (m /s)
                          Noosa River       WBNM
                            RAFTS
                            Model
      LW_65                  133.0           181.1             36.2
      LW_69                   24.6           25.0               1.6
      LW_70                   23.3           23.5               1.0



4.2.2                  Developed Case
For the developed case scenario the fraction impervious values were changed to represent the increase in
impervious area. A fraction impervious of 0.60 was used for standard residential areas, 0.70 for townhouses
and retirement villas and 0.80 for apartment buildings.
The properties of the developed case sub-catchments are shown in Table 4-5.                          The modified sub-
catchments have been bolded and italicised.




Northbrook Corporation Pty Ltd                              Version 4                                   16 September 2013
Flood Study v4 2.doc                                  Commercial in Confidence                                   Page 13

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.