Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study




Table of Contents
1         Introduction                                                                      1
2         Site Description                                                                  2
3         Hydraulic Modelling                                                               3
          3.1          Available Flood Modelling                                            3
          3.2          TUFLOW Model                                                         3
                       3.2.1     Summary                                                    3
                       3.2.2     Topography and Grid Size                                   3
                       3.2.3     Roughness Values                                           4
                       3.2.4     Model Inflows                                              4
                       3.2.5     Boundary Conditions                                        4
                       3.2.6     Model Runs                                                 5
                       3.2.7     Time Step                                                  7
                       3.2.8     Existing Structures                                        7
          3.3          Model Calibration                                                    9
4         Hydrologic Model                                                                11
          4.1          Rational Method                                                     11
                       4.1.1    Sub-catchments                                             11
                       4.1.2    Times of Concentration                                     11
                       4.1.3    Rainfall Intensity                                         11
                       4.1.4    Fraction Impervious                                        11
                       4.1.5    Runoff Coefficient                                         11
                       4.1.6    Resultant Peak Flows                                       12
          4.2          WBNM Model                                                          12
                       4.2.1    Summary                                                    12
                       4.2.2    Developed Case                                             13
          4.3          PMF Inflows                                                         15
5         TUFLOW Calibration                                                              16
          5.1          February 2012 Event                                                 16
6         Existing Case Results                                                           18
          6.1          Peak Water Levels                                                   18
          6.2          Peak Flows                                                          18
          6.3          Peak Velocities                                                     18
7         Proposed Development                                                            19
          7.1          Proposed Development                                                19
          7.2          Proposed Structures                                                 19
                       7.2.1   PMF Trafficability Requirements                             20
                       7.2.2   Structure Details                                           20
          7.3          Proposed Stormwater Treatment                                       21
8         Developed Case Results                                                          22
          8.1          Peak Water Levels                                                   22
          8.2          Peak Flows                                                          23
          8.3          Peak Velocities                                                     23

Northbrook Corporation Pty Ltd                         Version 4            16 September 2013
Flood Study v4 2.doc                             Commercial in Confidence             Page iii

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.