Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 35, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study




10                     Conclusion
The proposed development of Noosa on Weyba has been shown through TUFLOW modelling to:
      have no adverse impacts on flood levels and flows for surrounding properties for local and regional flood
       events;
      reduce the 100 year ARI event the peak flood level around Lake Entrance Boulevard due to flow
       attenuation being proposed within the site;
      provide 100 year ARI trafficability for all proposed and upgraded roads;
      provide PMF evacuation routes for all areas of the site; and
      improve flood access for neighbouring properties.
The flood levels used to set the development levels for the site include the potential impact of climate
change.
The proposed filling within the site will reduce available flood storage, although compared to the available
storage in Lake Weyba and the surrounding floodplain, the reduction is minimal. Flood modelling has shown
that the impact of the reduced flood storage is contained within the site. Cumulative flood impact modelling
has shown that filling of similar areas around Lake Weyba and Weyba Creek has a negligible impact on
regional flood levels, as these are dominated by storm surge levels. However, filling of these areas would
likely have an impact on local flood levels, and it would likely not be possible to fill to the extent modelled. It
is only due to the unique location of the site and the maintenance of local flow paths that filling within the site
is achievable without adverse impacts on neighbouring properties.
Dense revegetation of the western drainage channel is considered to be achievable with acceptable flood
impacts for the site and surrounding properties should this be desirable.




Northbrook Corporation Pty Ltd                      Version 4                                     16 September 2013
Flood Study v4 2.doc                          Commercial in Confidence                                     Page 30

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.