Flood Study
1 Introduction
This report has been updated in response to the Request for Information (RFI) from Sunshine Coast
th
Regional Council dated 28 February 2013. The responses to this request are contained within the report.
We have provided an index in Appendix J, which locates the responses to the relevant RFI items within the
report for ease of reference.
The subject site encompasses the following lots:
The J & K Hofmann land:
Lot 7 on RP46782 1.99 ha
Lot 2 on RP160983 93.1 ha
Lot 2 on SP179590 12.5 ha
Lot 53 on SP163571 110.0 ha
The Northbrook Pty Ltd land:
Lot 1667 on M3772 44.4 ha
Lot 11 on RP893393 40.7 ha
Lot 12 on RP893393 0.61 ha
It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used as parks and lake buffer zone and the remaining 77 percent of the site dedicated as green space and
conservation areas. The concept master plan for the development is shown in Appendix A.
The aim of this report is to:
determine the relevant flood levels for the site, including local and regional flood events for use in
master planning, to ensure that all lots and roads have sufficient flood immunity;
look at the potential impact of development on peak flood levels and flows for neighbouring areas;
determine mitigation strategies that would be required to reduce any impact on neighbouring areas;
determine the appropriate flood levels for the site taking into account climate change, i.e. increased
rainfall intensity and a rise in sea level of 0.8 metres;
size culvert crossings to ensure that the site is accessible during a Probable Maximum Flood (PMF)
event, as requested by Council; and
th
address issues raised in the RFI from Council, dated the 28 February 2013.
Measures to improve flood levels and access for lots located on the neighbouring Lake Entrance Boulevard
are also proposed.
Regional flood modelling has been conducted of the Noosa River in Mike 11. The results of this study are
outlined in the Noosa River Flood Study (JWP, 1995). This modelling was recently updated by Council to
use Version 2010 of Mike 11 and was run for several more storm durations. The cross-sections used in this
modelling are shown in Appendix A. This modelling does not include the local tributaries located within or
adjacent to the site, and is therefore not of sufficient quality to use to determine flood levels throughout the
site. This regional flood modelling does however take into account the impact of storm surge.
The flow patterns and interactions between the different creeks and Lake Weyba are quite complex and so
the software used for this analysis was TUFLOW, which is a two and one dimensional flood model.
Since the original application was made the locations of the road crossings across Keyser Creek have been
modified. This has addressed some of the concerns from the RFI.
Northbrook Corporation Pty Ltd Version 4 16 September 2013
Flood Study v4 2.doc Commercial in Confidence Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.