Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study




1                      Introduction
This report has been updated in response to the Request for Information (RFI) from Sunshine Coast
                            th
Regional Council dated 28 February 2013. The responses to this request are contained within the report.
We have provided an index in Appendix J, which locates the responses to the relevant RFI items within the
report for ease of reference.
The subject site encompasses the following lots:
The J & K Hofmann land:
      Lot 7 on RP46782           1.99 ha
      Lot 2 on RP160983          93.1 ha
      Lot 2 on SP179590          12.5 ha
      Lot 53 on SP163571         110.0 ha
The Northbrook Pty Ltd land:
      Lot 1667 on M3772          44.4 ha
      Lot 11 on RP893393         40.7 ha
      Lot 12 on RP893393         0.61 ha
It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used as parks and lake buffer zone and the remaining 77 percent of the site dedicated as green space and
conservation areas. The concept master plan for the development is shown in Appendix A.
The aim of this report is to:
      determine the relevant flood levels for the site, including local and regional flood events for use in
       master planning, to ensure that all lots and roads have sufficient flood immunity;
      look at the potential impact of development on peak flood levels and flows for neighbouring areas;
      determine mitigation strategies that would be required to reduce any impact on neighbouring areas;
      determine the appropriate flood levels for the site taking into account climate change, i.e. increased
       rainfall intensity and a rise in sea level of 0.8 metres;
      size culvert crossings to ensure that the site is accessible during a Probable Maximum Flood (PMF)
       event, as requested by Council; and

                                                                     th
       address issues raised in the RFI from Council, dated the 28 February 2013.
Measures to improve flood levels and access for lots located on the neighbouring Lake Entrance Boulevard
are also proposed.
Regional flood modelling has been conducted of the Noosa River in Mike 11. The results of this study are
outlined in the Noosa River Flood Study (JWP, 1995). This modelling was recently updated by Council to
use Version 2010 of Mike 11 and was run for several more storm durations. The cross-sections used in this
modelling are shown in Appendix A. This modelling does not include the local tributaries located within or
adjacent to the site, and is therefore not of sufficient quality to use to determine flood levels throughout the
site. This regional flood modelling does however take into account the impact of storm surge.
The flow patterns and interactions between the different creeks and Lake Weyba are quite complex and so
the software used for this analysis was TUFLOW, which is a two and one dimensional flood model.
Since the original application was made the locations of the road crossings across Keyser Creek have been
modified. This has addressed some of the concerns from the RFI.



Northbrook Corporation Pty Ltd                      Version 4                                  16 September 2013
Flood Study v4 2.doc                          Commercial in Confidence                                   Page 1

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.