Council archive · source document
Attachment 13- Amended Flood Study MCU12/0208
Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 96, section 1. The text section number identifies this passage in the reader.
Existing Case Peak Water Levels (mAHD)
Design Event
Comparison Surface 8 17
Location 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
Point Level
9 18
EC3 Eenie Ck 2.95 2.78 2.65 2.47 2.29 1.94 1.65 2.98 2.64 2.49 2.35 2.20 2.06 1.80 4.70 3.28
EC4 Eenie Ck 2.67 2.54 2.43 2.27 2.12 1.80 1.50 2.70 2.45 2.31 2.18 2.05 1.93 1.67 4.15 3.01
EC5 Eenie Ck 1.48 1.40 1.33 1.25 1.19 1.04 0.86 1.97 2.08 1.81 1.58 1.44 1.37 1.28 3.34 2.72
* Values in red are where the regional PMF
level of 4.23 mAHD will dominate
Northbrook Corporation Pty Ltd 13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App F - Peak Flood Levels.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.