Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 98, section 1. The text section number identifies this passage in the reader.

                                                                                                          Developed Case Peak Water Levels (mAHD)
                                                                                                                         Design Event
 Comparison                                          Surface                                                               8                                                           17
                         Location                                        1     2      3      4      5       6      7      and    10     11     12     13     14     15        16      and
 Point                                                Level
                                                                                                                           9                                                           18
                         proposed
                         internal road
 H10                     Lot 53                                        4.63   4.55   4.48   4.28   4.06    3.68   3.48   4.63   4.25    4.08   3.90   3.70   3.56   3.40     5.37     4.72
                         upstream of
 H11                                                                   4.55   4.49   4.43   4.24   4.01    3.54   3.16   4.55   4.21    4.03   3.84   3.59   3.37   3.09     5.18     4.62
                         easement
 ease_road               easement                       4.30           4.35   4.34   4.33   n/a    n/a     n/a    n/a    4.36    n/a    n/a    n/a    n/a    n/a    n/a      5.11     4.37
                         downstream of
 H12                                                                   3.20   3.02   2.89   2.72   2.57    2.35   2.23   3.23   2.85    2.72   2.60   2.47   2.36   2.20     5.09     3.52
                         easement
                         confluence
 H13                                                                   3.14   2.96   2.81   2.61   2.43    2.08   1.79   3.17   2.78    2.63   2.48   2.32   2.19   1.93     5.06     3.48
                         Eenie Ck
                         upstream
 H14                                                                   5.16   4.95   4.80   4.53   4.30    3.89   3.59   5.16   4.54    4.39   4.23   4.04   3.88   3.58     7.18     5.40
                         Precinct L
 H15                     Precinct L                                    4.90   4.70   4.55   4.30   4.07    3.66   3.36   4.91   4.33    4.18   4.02   3.84   3.69   3.41     6.84     5.15
                         upstream of
 LEB3 us                 LEB Crossing                                  4.56   4.38   4.25   4.03   3.82    3.46   3.21   4.57   4.06    3.93   3.78   3.63   3.50   3.26     6.18     4.77
                         3
                         LEB Crossing
 LEB3                                                   3.97           4.24   4.15   4.08   n/a    n/a     n/a    n/a    4.24    n/a    n/a    n/a    n/a    n/a    n/a      6.10     4.35
                         3
                         upstream of
 AspPl us                                                              4.45   4.27   4.14   3.94   3.75    3.41   3.17   4.45   3.97    3.85   3.72   3.57   3.44   3.22     5.94     4.67
                         Aspera Pl
 AspPl                   Aspera Pl                      4.51            n/a   n/a    n/a    n/a    n/a     n/a    n/a     n/a    n/a    n/a    n/a    n/a    n/a    n/a      5.57     4.66
                         downstream of
 AspPl ds                                                              4.15   4.03   3.94   3.81   3.65    3.36   3.14   4.15   3.82    3.74   3.63   3.50   3.39   3.19     5.68     4.29
                         Aspera Pl
                         upstream of
 LEB2 us                 LEB Crossing                                  4.31   4.18   4.11   3.99   3.86    3.61   3.27   4.31   3.94    3.86   3.78   3.67   3.53   3.17     6.14     4.49
                         2
                         LEB Crossing
 LEB2                                                   3.20           4.17   4.06   3.99   3.89   3.79    3.59   3.43   4.18   3.85    3.79   3.73   3.64   3.51   3.43     6.08     4.38
                         2
                         LEB - adjacent
 LEB2 ds                                                               3.69   3.48   3.35   3.15   3.00    2.76   2.57   3.71   3.23    3.10   2.97   2.84   2.74   2.56     5.91     4.03
                         to flooded lots
                         upstream of
 LEB1 us                 LEB Crossing                                  4.02   3.84   3.67   3.30   3.00    2.54   2.25   4.03   3.40    3.17   2.95   2.73   2.57   2.26     5.96     4.24
                         1 (Eenie Ck)



Northbrook Corporation Pty Ltd                                                                                                                                             13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App F - Peak Flood Levels.docx                                                                                                          Page 5


[OCR of page images]
Sa) Cardno

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Developed Case Peak Water Levels (mAHD)
Design Event
Comparison . Surface 8 17
Point Location Level 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
proposed
internal road
H10 Lot 53 4.63 | 4.55 | 4.48 | 4.28 | 4.06 | 3.68 | 3.48 | 4.63 | 4.25 | 4.08 | 3.90 | 3.70 | 3.56 | 3.40 | 5.37 | 4.72
H11 upstream of 4.55 | 4.49 | 4.43 | 4.24 | 4.01 | 3.54 | 3.16 | 4.55 | 4.21 | 4.03 | 3.84 | 3.59 | 3.37 | 3.09 | 5.18 | 4.62
easement
ease_road easement 4.30 4.35 | 4.34 | 4.33 n/a n/a n/a n/a 4.36 n/a n/a n/a n/a n/a n/a 5.11 | 4.37
H12 cownstream of 3.20 | 3.02 | 2.89 | 2.72 | 2.57 | 2.35 | 2.23 | 3.23 | 2.85 | 2.72 | 2.60 | 2.47 | 2.36 | 2.20 | 5.09 | 3.52
H13 pone 3.14 | 2.96 | 2.81 | 2.61 | 2.43 | 2.08 | 1.79 | 3.17 | 2.78 | 2.63 | 2.48 | 2.32 | 2.19 | 1.93 | 5.06 | 3.48
H1i4 aaa 5.16 | 4.95 | 4.80 | 4.53 | 4.30 | 3.89 | 3.59 | 5.16 | 4.54 | 4.39 | 4.23 | 4.04 | 3.88 | 3.58 | 7.18 | 5.40
H15 Precinct L 4.90 | 4.70 | 4.55 | 4.30 | 4.07 | 3.66 | 3.36 | 4.91 | 4.33 | 4.18 | 4.02 | 3.84 | 3.69 | 3.41 | 6.84 | 5.15
upstream of
LEB3 us LEB Crossing 4.56 | 4.38 | 4.25 | 4.03 | 3.82 | 3.46 | 3.21 | 4.57 | 4.06 | 3.93 | 3.78 | 3.63 | 3.50 | 3.26 | 6.18 | 4.77
3
LEB3 3 Crossing | 397 | 4.24 | 4.15 | 4.08 | na | na | ma | na | 424] na | nla | na | nla | na | nia | 6.10 | 4.35
AspPI us peor Pl 4.45 | 4.27 | 4.14 | 3.94 | 3.75 | 3.41 | 3.17 | 4.45 | 3.97 | 3.85 | 3.72 | 3.57 | 3.44 | 3.22 | 5.94 | 4.67
AspPI Aspera Pl 4.51 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a | 5.57 | 4.66
AspPI ds Aepora Pl of 4.15 | 4.03 | 3.94 | 3.81 | 3.65 | 3.36 | 3.14 | 415 | 3.82 | 3.74 | 363 | 350 | 3.39 | 3.19 | 5.68 | 4.29
upstream of
LEB2 us LEB Crossing 4.31 | 4.18 | 4.11 | 3.99 | 3.86 | 3.61 | 3.27 | 4.31 | 3.94 | 3.86 | 3.78 | 3.67 | 3.53 | 3.17 | 6.14 | 4.49
2
LEB2 a Crossing | 390 | 4.17 | 4.06 | 3.99 | 3.89 | 3.79 | 359 | 3.43 4.18 | 3.85 | 3.79 | 3.73 | 3.64 | 3.51 | 3.43 | 6.08 | 4.38
LEB - adjacent
LEB2 ds to flooded lots 3.69 | 3.48 | 3.35 | 3.15 | 3.00 | 2.76 | 257 | 3.71 | 3.23 | 3.10 | 297 | 2.84 | 2.74 | 2.56 | 5.91 | 4.03
upstream of
LEB1 us LEB Crossing 4.02 | 3.84 | 3.67 | 3.30 | 3.00 | 2.54 | 2.25 | 4.03 | 3.40 | 3.17 | 295 | 2.73 | 257 | 2.26 | 5.96 | 4.24
1 (Eenie Ck)
Northbrook Corporation Pty Ltd 13 September 2013

45101-19-03\wp\R1v4 Flood Study\Appendices\App F - Peak Flood Levels.docx Page 5

 

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.