Developed Case Peak Water Levels (mAHD)
Design Event
Comparison Surface 8 17
Location 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
Point Level
9 18
proposed
internal road
H10 Lot 53 4.63 4.55 4.48 4.28 4.06 3.68 3.48 4.63 4.25 4.08 3.90 3.70 3.56 3.40 5.37 4.72
upstream of
H11 4.55 4.49 4.43 4.24 4.01 3.54 3.16 4.55 4.21 4.03 3.84 3.59 3.37 3.09 5.18 4.62
easement
ease_road easement 4.30 4.35 4.34 4.33 n/a n/a n/a n/a 4.36 n/a n/a n/a n/a n/a n/a 5.11 4.37
downstream of
H12 3.20 3.02 2.89 2.72 2.57 2.35 2.23 3.23 2.85 2.72 2.60 2.47 2.36 2.20 5.09 3.52
easement
confluence
H13 3.14 2.96 2.81 2.61 2.43 2.08 1.79 3.17 2.78 2.63 2.48 2.32 2.19 1.93 5.06 3.48
Eenie Ck
upstream
H14 5.16 4.95 4.80 4.53 4.30 3.89 3.59 5.16 4.54 4.39 4.23 4.04 3.88 3.58 7.18 5.40
Precinct L
H15 Precinct L 4.90 4.70 4.55 4.30 4.07 3.66 3.36 4.91 4.33 4.18 4.02 3.84 3.69 3.41 6.84 5.15
upstream of
LEB3 us LEB Crossing 4.56 4.38 4.25 4.03 3.82 3.46 3.21 4.57 4.06 3.93 3.78 3.63 3.50 3.26 6.18 4.77
3
LEB Crossing
LEB3 3.97 4.24 4.15 4.08 n/a n/a n/a n/a 4.24 n/a n/a n/a n/a n/a n/a 6.10 4.35
3
upstream of
AspPl us 4.45 4.27 4.14 3.94 3.75 3.41 3.17 4.45 3.97 3.85 3.72 3.57 3.44 3.22 5.94 4.67
Aspera Pl
AspPl Aspera Pl 4.51 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 5.57 4.66
downstream of
AspPl ds 4.15 4.03 3.94 3.81 3.65 3.36 3.14 4.15 3.82 3.74 3.63 3.50 3.39 3.19 5.68 4.29
Aspera Pl
upstream of
LEB2 us LEB Crossing 4.31 4.18 4.11 3.99 3.86 3.61 3.27 4.31 3.94 3.86 3.78 3.67 3.53 3.17 6.14 4.49
2
LEB Crossing
LEB2 3.20 4.17 4.06 3.99 3.89 3.79 3.59 3.43 4.18 3.85 3.79 3.73 3.64 3.51 3.43 6.08 4.38
2
LEB - adjacent
LEB2 ds 3.69 3.48 3.35 3.15 3.00 2.76 2.57 3.71 3.23 3.10 2.97 2.84 2.74 2.56 5.91 4.03
to flooded lots
upstream of
LEB1 us LEB Crossing 4.02 3.84 3.67 3.30 3.00 2.54 2.25 4.03 3.40 3.17 2.95 2.73 2.57 2.26 5.96 4.24
1 (Eenie Ck)
Northbrook Corporation Pty Ltd 13 September 2013
O:\5101-19-03\wp\R1v4 Flood Study\Appendices\App F - Peak Flood Levels.docx Page 5
[OCR of page images]
Sa) Cardno
Developed Case Peak Water Levels (mAHD)
Design Event
Comparison . Surface 8 17
Point Location Level 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
proposed
internal road
H10 Lot 53 4.63 | 4.55 | 4.48 | 4.28 | 4.06 | 3.68 | 3.48 | 4.63 | 4.25 | 4.08 | 3.90 | 3.70 | 3.56 | 3.40 | 5.37 | 4.72
H11 upstream of 4.55 | 4.49 | 4.43 | 4.24 | 4.01 | 3.54 | 3.16 | 4.55 | 4.21 | 4.03 | 3.84 | 3.59 | 3.37 | 3.09 | 5.18 | 4.62
easement
ease_road easement 4.30 4.35 | 4.34 | 4.33 n/a n/a n/a n/a 4.36 n/a n/a n/a n/a n/a n/a 5.11 | 4.37
H12 cownstream of 3.20 | 3.02 | 2.89 | 2.72 | 2.57 | 2.35 | 2.23 | 3.23 | 2.85 | 2.72 | 2.60 | 2.47 | 2.36 | 2.20 | 5.09 | 3.52
H13 pone 3.14 | 2.96 | 2.81 | 2.61 | 2.43 | 2.08 | 1.79 | 3.17 | 2.78 | 2.63 | 2.48 | 2.32 | 2.19 | 1.93 | 5.06 | 3.48
H1i4 aaa 5.16 | 4.95 | 4.80 | 4.53 | 4.30 | 3.89 | 3.59 | 5.16 | 4.54 | 4.39 | 4.23 | 4.04 | 3.88 | 3.58 | 7.18 | 5.40
H15 Precinct L 4.90 | 4.70 | 4.55 | 4.30 | 4.07 | 3.66 | 3.36 | 4.91 | 4.33 | 4.18 | 4.02 | 3.84 | 3.69 | 3.41 | 6.84 | 5.15
upstream of
LEB3 us LEB Crossing 4.56 | 4.38 | 4.25 | 4.03 | 3.82 | 3.46 | 3.21 | 4.57 | 4.06 | 3.93 | 3.78 | 3.63 | 3.50 | 3.26 | 6.18 | 4.77
3
LEB3 3 Crossing | 397 | 4.24 | 4.15 | 4.08 | na | na | ma | na | 424] na | nla | na | nla | na | nia | 6.10 | 4.35
AspPI us peor Pl 4.45 | 4.27 | 4.14 | 3.94 | 3.75 | 3.41 | 3.17 | 4.45 | 3.97 | 3.85 | 3.72 | 3.57 | 3.44 | 3.22 | 5.94 | 4.67
AspPI Aspera Pl 4.51 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a | 5.57 | 4.66
AspPI ds Aepora Pl of 4.15 | 4.03 | 3.94 | 3.81 | 3.65 | 3.36 | 3.14 | 415 | 3.82 | 3.74 | 363 | 350 | 3.39 | 3.19 | 5.68 | 4.29
upstream of
LEB2 us LEB Crossing 4.31 | 4.18 | 4.11 | 3.99 | 3.86 | 3.61 | 3.27 | 4.31 | 3.94 | 3.86 | 3.78 | 3.67 | 3.53 | 3.17 | 6.14 | 4.49
2
LEB2 a Crossing | 390 | 4.17 | 4.06 | 3.99 | 3.89 | 3.79 | 359 | 3.43 4.18 | 3.85 | 3.79 | 3.73 | 3.64 | 3.51 | 3.43 | 6.08 | 4.38
LEB - adjacent
LEB2 ds to flooded lots 3.69 | 3.48 | 3.35 | 3.15 | 3.00 | 2.76 | 257 | 3.71 | 3.23 | 3.10 | 297 | 2.84 | 2.74 | 2.56 | 5.91 | 4.03
upstream of
LEB1 us LEB Crossing 4.02 | 3.84 | 3.67 | 3.30 | 3.00 | 2.54 | 2.25 | 4.03 | 3.40 | 3.17 | 295 | 2.73 | 257 | 2.26 | 5.96 | 4.24
1 (Eenie Ck)
Northbrook Corporation Pty Ltd 13 September 2013
45101-19-03\wp\R1v4 Flood Study\Appendices\App F - Peak Flood Levels.docx Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.