Performance Bond
8. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
pre-start meeting. The cash bond or trading bank guarantee will be returned on performance
of the conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or guaranteed
sum to effect compliance with conditions.
Landscaping
9. A minimum of 20% of the site must consist of/be retained as soft landscaping.
10. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
11. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
12. Screening vegetation must be planted along the eastern boundary (adjoining No.19 Maher
Tce) from the front boundary as per the approved plans in accordance with Council’s
Planning Scheme Policy PSP2 - Landscaping. The planted vegetation must have a minimum
pot size of 100 litres and consist of native, endemic species with a mature height of not less
than 8 metres and a minimum spacing of 1.5 metre centres in locations as shown on the
approved plans.
ENGINEERING
Site Access and Driveways
13. A sealed access driveway must be provided from Maher Tce to all parking and manoeuvring
areas of the development. The works must be undertaken in accordance with an Operational
Works approval and must include in particular, a driveway crossover generally in accordance
with:
a. Council’s Standard Drawings RS-049 and RS-050;
b. Kelder Architects’ drawing No. A_SD_0021, Rev C, titled “Proposed Site Plan”; and
c. Kelder Architects’ drawing No. A_SD_0300, Rev C, titled “Proposed Section”.
Stormwater Drainage
14. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and generally in accordance with SCG’s drawing No. 31158-C2.1, dated July 2021, titled
“Site Stormwater Drainage Plan”.
Services
15. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
Easements
16. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
Page 3 of 8
Document Set ID: 22826399
Version: 1, Version Date: 23/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Decision Notice - Minor Change - DBW21 0026 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 163 KB (small file)
- File type
No other editions are linked here.