Original source · versioned page text
Meeting minutes
GENERAL COMMITTEE MEETING MINUTES 14 AUGUST 2023
6. The modular dwellings are a Zero Net Energy (ZNE) product manufactured by
Eco Cottages in their ZNE factory at Jarrah Street, Cooroy. Consequently, the
development will complement Noosa Council’s Zero Emissions Organisational
Strategy and the planning scheme’s intent that the Noosa community is carbon
neutral as a result of adopting low emissions production and land use practices;
7. The development will be powered by a solar powered microgrid which will ensure
that all of the energy needs from the development will be obtained from renewable
sources. In this regard, all dwellings will have solar panels installed and the energy
produced will be stored within a large battery station on the site. Consequently, the
development will complement Noosa Council’s Zero Emissions Organisational
Strategy and the planning scheme’s intent that the Noosa community is carbon
neutral as a result of adopting low emissions production and land use practices.
8. The dwellings are �ordable by design’, as they are small, lightweight, timber
cottages. They would also result in minimal energy costs for the future residents,
being connected to a solar microgrids which will supply the developments energy
needs. For these reasons, they will remain an affordable housing product in
perpetuity;
9. The development will provide several school-based apprenticeships and
traineeships for students from NDSHS that cover apprenticeships and training in:
design, Revit, sketch up, detailing, carpentry, cabinet making, joinery, plumbing,
painting, waste-management, recycling and furniture manufacturing from cypress
off cuts. Eco Cottages has had a collaborative relationship with NDSHS since
2007;
10. The development will support local manufacturing and jobs within the region,
including for:
a. Eco Cottages, which is a successful local business that are leading new
and sustainable building technologies in the development of small modular
homes and employ 30 staff; and
b. Enopte Solutions, which is a green energy company based out Coolum
Beach that have developed a Battery Energy Storage System used in the
installation of homes and commercial developments.
11. There is significant public support for the application with 332 properly made
submissions being received overwhelmingly in support of the development
application.
C . Request the CEO to prepare a further report to a future meeting which includes
an Infrastructure Agreement, deed of agreement, covenant, conditions and
grounds for approval.
For: Crs Lorentson and Stewart
Against: Crs Wilkie, Stockwell, Wegener, Jurisevic and Finzel
Lost.
The meeting adjourned at 2.48pm.
The meeting resumed at 2.59pm.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original