Original source · versioned page text
Attachment 4 - Amended Landscape Plans
Attached to the e-mail Response to Council’s Information Request OPW21/0275 - 9 Ann St Noosaville.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn9 ANN STREET, NOOSAVILLE Landscape Plan Package Drawing Schedule · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall 4.0 Planting 5.0 Maintenance Tasks percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades · Maintain whole of landscape works for establishment period of 13 weeks or as in agreement providing a natural appearance with no abrupt edges. New Gardens with Owner. LD1 Drawing Schedule, Specifications · Ensure 2% minimum slope away from all structures to pits or swales. · See 1.0 Topsoil for cultivation and topsoil requirements. Irrigation and Watering LD2 Finishes and Planting Schedules · Trim topsoils for gardens and turfing. · Spread ameliorated site topsoil or MRTS-16 imported organic topsoil to a depth of 300mm · Every day for the first two weeks (unless it rains adequately) over prepared garden areas and trim. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry LD3 Details 2.0 Landscape Construction · Crown garden beds 100mm H at centres to drain positively. (unless it rains adequately). LP1 Planting Plan - Ground Floor · Mulch gardens with LA approved A.S. 4454 imported organic mulch as specified 100mm deep · Once a week there after. LP2 Planting Plan - First Floor Levels settled. Leave 20mm between top of mowing edge and planting area mulching. If mulched Mowing · See plan for engineer's plan levels and proposed levels. areas are >1:4 sloped, install open weave pinned jute net over mulch once settled. · First Mow - Once after 10 days if there is rapid growth or 14 days after installation. · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a · All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds · Mowing Thereafter - Once a week during summer, once every two weeks in spring and Landscape Specifications discrepancy occurs notify superintendent and/or LA. (specifically Nutsedge), pests including fire ants and soil borne viruses and diseases. autumn, and once a month in winter or as required if there is a lot of growth or as desired. · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. Weed Removal: As required to reduce competition and seeding. These landscape plan must be read in conjunction with the appropriate statutory approvals and · Grade evenly between prescribed levels and finish surface levels ensuring positive drainage Tree Planting Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen, Australian Standards. and no ponding areas. · Refer to street tree and tree planting details (as applicable) for information. with plants of the same species and of similar size and quality unless otherwise specified. · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled · All trees to be certified to A.S. 2303:2018 'Tree stock for landscape use' and comply with this Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and 1.0 General Notes turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between specification. guying when instructed by the superintendent. design and finish levels. · Landscape contractor to peg street tree positions for approval by superintendent before Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are Abbreviations · Co-ordinate establishment of levels with superintendent. excavation. established or Off-maintenance respectively. · SCC - Sunshine Coast Council · A.S. - Australian Standards · E.P. - Establishment Period · H.D. - Hot Dipped · All trees to have a full and even crown. Monitoring: Provide a monthly report on completed tasks. Drainage · Install trees at locations indicated on the plans, per notes and details herein. · LA - Landscape Architect · N/A - Not applicable · All damaged stormwater pipes are replaced and relocated as necessary. · Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified Warranties · O.C. - On centre · MP - Maintenance Period · Ensure site drainage can occur positively to whole of site, minimum 2% away from any 100mm deep settled. Do not mulch within 50mm of trunk / plant stem. · Warranties or guarantees specified shall name the Owner as warrantee. Register with · MRTS - Main Roads Technical Standard · m² - square metre · m³ - cubic metre buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before · Edge trees per details. manufacturers as necessary. Retain copies delivered with and components and equipment to · NATA - National Association of Testing Authorities · typ. - Typical continuing works. · If street trees are required, install street tree drainage per detail if required by civil engineer or the Owner. · uPVC- Unplasticised Polyvinyl Chloride · S - Spread · Drainage works to correlate with and not disturb adjacent land. tree pits do not drain after they are tested for drainage by filling with water prior to planting and · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within · See legend for plan symbols and plans for locations. backfilling. Landscape contractor to furnish tree pit drainage rate per tree. Install street tree fourteen (14) days after practical completion. · The Landscape Plans must be read in conjunction with the Operational Works Landscaping · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped root barrier as specified. Landscape contractor to furnish rate per tree. · Commence Warranty periods at practical completion or at acceptance of installation, if Decision Notice once issued. This plan has been developed to comply with the SCC - 2014 galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements · Tree staking - per details. acceptance is not concurrent with practical completion. Planning Scheme, Landscape Code. on-site in addition to those on plans. · All trees to be located minimum; · If installation is not by manufacturer and product warranty is conditional on the manufacturer's · These plans are not for tender or construction. There are no existing trees to be removed. · All drainage pits and subsurface drains to be connected to existing stormwater drainage - 1000mm from back of kerb or in-between kerb and footpath where applicable (allowing approval of the installer, submit the manufacturer's written approval of the installing firm. system. Refer engineer's drawings for drains and hydraulic services. for service setbacks as per above) or as dimensioned on plans Preliminaries · Stormwater drainage to be 100mmØ minimum uPVC drainage pipe. - 1000mm from underground services, confirm locations on-site prior to pit excavation Deliverables · Refer to plans by others for all services locations, footpath works, levels (other than those · Subsurface drainage to be 100mm minimum Ag-flow pipe centred in 300mm x 300mm gravel - 1500mm horizontally and vertically from sewer lines, concrete paths · Warranties indicated on these plans) and boundaries. All services and related infrastructure including trench. Gravel to be 8-20mmØ No-fines aggregates surrounded by LA approved permeable - 3m from adjoining, new, or perpendicular lot boundaries, driveway crossovers, · Irrigation System As-built plans in .dwg and PDF formats street lighting shown on these plans are indicative only. bidim or geotextile fabric. stormwater catch pits, power poles, and fire hydrants · Call 'Dial Before You Dig 11 00' prior to any excavation. · Where and if additional drainage is required the following applies: - 6m from power poles, and overhead street lighting Certifications · Before work commences the subcontractor is to organise a pre-start meeting with the LA to - Allow for seepage interception sub-surface drainage where paths and landscape works Furnish LA with the following certifications prior to Practical Completion: establish scope of works management procedures and clarify any issues. impede drainage (to be coordinated on site). General Planting · AS 2303:2018 Tree Stock for Landscape Use · Prior to commencing construction works, verify dimensions, levels and location of site - Allow for 300mm x 300mm gravel trench with socked Ag-line under path, discharge to · Refer to detail(s) herein respectively. · MRTS 16 Topsoil services, refer engineer's drawings generally. natural drainage lines. · Supply and place plants according to plant schedule, plant setout notes and plan locations. · AS4454 Mulch · Dimensions take precedence over scale. - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side · Where discrepancies occur advise superintendent prior to planting. · Turf of low point. · Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated Erosion and Sediment Control · The landscape contractor to implement and maintain for the contract duration, best practice on plans. Sources Edging · Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups · Survey: Max Waterson Surveyors erosion and sediment control measures in accordance with the manual for erosion and · Supply, install, and maintain edges as specified and shown on the plans and details and to achieve optimum cover related to mature plant size and form. · Civil Engineering: SCG Civil Consulting sediment control (Maroon Manual), good environmental practice and the consulting civil Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie · Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs, · Architecture: Skale Building Design engineer's specification for erosion and sediment control. Penalties and fines for off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. garden edges and paths to allow for mature plant form. Confirm with LA which require more non-compliance will apply. · Install silt control fencing in accordance with site environmental management plan and local distance. 3.0 Irrigation - If Intstalled authority regulations. · All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate · Sediment and erosion control devices to be installed where necessary and as directed on site of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock. Preliminaries by superintendent. Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons. · Liaise with relevant SCC authorities and obtain any approval as required. · All sediment and erosion control devices are to be installed in accordance with manufacturer's · Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls. · Comply with government standards and co-ordinate with other trades. specifications. · Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours, · Check locations of penetration/conduits and install where required. · The contractor is responsible for ensuring sediment and erosion control devices are inspected notify superintendent and correct drainage. · Contractor to provide qualifications and insurances before construction. and maintained as follows; · Soak plants thoroughly before removing from container. · Irrigation system is a 'Design + Build' system. a) During construction: Daily during dry weather, prior to predicted storm events, twice · Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted daily during prolonged rain and coiled roots to expose young roots. All stock to be free of structural defects above and Provide: b) During establishment period: Weekly during dry weather, prior to predicted storm below soil line (i.e. no girdled roots). · Supply and install a new: Automatic electronic controller with a lockable stainless steel case, events, twice weekly during prolonged rain · Do not mix soil from hole with mulch and do not compact plant pit. rain sensor, backflow preventer per Council standards with isolation valves, pressure · All stockpiles are to be protected with suitable erosion control devices and graded to ensure · Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported regulator(s) as required, Irritrol System control valves for drip, check valves, black plastic control of runoff. MRTS 16 topsoil. valve boxes, looped mainline, thrust blocks (as required), fittings, and drip lines and emitters · Coordinate installation of sediment and erosion control devices with civil contractor to ensure · Water plant in well and maintain soil moisture levels through E.P. for gardens. If sprinklers are installed for turf areas (i.e. overhead spray), sprinklers / rotors compatibility and consistency in control measures. shall be Hunter or LA approved equal. · All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. New Turfed Areas · Turf area irrigation to have head to head coverage and no overspray onto hard surfaces. · See 2.0 Topsoil for cultivation and topsoil requirements. Check head radius once per month to ensure spray head layout provides head to head Site Works · Trim topsoil, fill depressions and provide even falls as indicated on drawings. coverage. · Remove all unwanted material, deleterious and operational debris from site. · Finished turf grades/contours shall be smooth and undulating, free from deleterious materials, · Install uPVC conduits, 2xØ of pipe used, under all hard surfaces prior to hard surface · If provided levels are not functional refer to the site superintendent and/or LA. debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and construction. Extend ends of conduits 300mm beyond surfaces, cap (do not glue caps to · Civil engineering designs have provided a positively drained site. If there are drainage issues no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to conduits) and install used survey pegs at ends for reference. refer site superintendent. laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow · All valve boxes to be located in gardens (not in turf or swales) 300mm from and perpendicular · Refer to 2.0 Landscape Construction - Drainage for more information. unimpeded over laid turf to low area respectively. to surfaces . · Supply and lay 'A' grade turf per plans and schedules. · All mainlines to have 450mm of topsoil cover and 300mm for lateral lines. Conduits · Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is · Align all mainlines and lateral lines 1m from all trees and in close approximation to new paths · Furnish and install 2 - 150mmØ solid uPVC piping perpendicularly under all footpaths that well established. / hard surfaces as possible. bisect landscape areas for irrigation and landscape drainage purposes. Extend ends 300mm · Water turf in well and apply water to maintain soil moisture until established. · Do not irrigate road reserve areas. beyond paths, each side and cap (do not glue caps). Mark and install a recycled surveyor's · For practical completion ensure whole system is operational. pegs for identification. · Plants and turf to be irrigated to ensure adequate plant moisture is maintained during establishment. Topsoil - Harvesting, Stockpiling, Amelioration Re-use and Spreading · Adjust system post establishment so it operates during dry and hot periods so plants and turf · If practical, harvest, stockpile, ameliorate and re-install site topsoils per the following areas are adequately watered to maintain healthy and vibrant conditions. specifications in respective landscaping areas. · Contractor to provide a twelve month guarantee, maintain against faulty workmanship and · Install erosion control measures per engineer and above for stockpiled topsoil. materials for system from date of practical completion. · Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with · Provide CAD 'As-built' drawing and PDF of same to Owner and a laminated copy in the results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape controller door for reference when applying for practical completion clearly showing main-line contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted runs and sizes, valve types / station numbers / valve design pressure, head types and by a NATA accredited lab. locations. · Should amended site topsoils be insufficient in quantity, contractor to import MRTS-16 topsoil (> standard than AS4419) and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have soils analyses test as per above. Amend Imported soils per test results prior to spreading. · Cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan prescribed proposed contours and track-in, 300mm deep for gardens and 150mm deep for turf areas. · Clear and remove all non-organic, deleterious and large organic matter such as rocks greater than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. NOTES: This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736). Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN Any reproduction or unauthorized use without written consent from Job No: 2161 Proposed Duplex Landscape Architecture, Urban Design, Land Planning Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. 9 Ann Street, Noosaville, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia M: +614 7705 5222 27.10.21 B Information Request Response BB BB LD1 Drawing Schedule, Specifications E: [email protected] 26.09.21 A For Application BB BB Sheet Title Sheet 1 of 5 Client: ARCD Projects Pty Ltd W: birdgolfdesign.com DATE ISSUE DESCRIPTION DRAWN CKD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 4 pages
Page 2
Finishes Schedule Planting Schedule
Code Item Product / Description Specifications, Size, Finish, Colour Dealer, Manufacturer Code GENUS species - Common Name Size Quantity Notes
Hardscape Trees
TE Garden Edge Timber Garden Edging - Street Trees Refer to Specifications and Detail Nominated by contractor and ACM smi ACMENA smithii - Narrow-leaved Lilly Pilly 45 L 1 PSP3 selection
approved by superintendent
ACR imp ACRONYCHIA imperforata - Fraser Island Apple 45 L 1 PSP3 selection
STE Garden Edge Galvanised Garden Edging 'FormBoss' 'Redcor', 150mm H x 2mm gauge including 300mm stakes. Formboss, local representative:
Install per manufacturer's specifications. Tranquil Building and B ELA ret ELAEOCARPUS reticulatus - Fairy Petticoats
Landscapes (Prima Donna' Pink selection to scale available space) 45 L 3 PSP3 selection
07 5497 8774
HOW for HOWEA forsteriana - Kentia Palm 25 L 1 Native
Root Barrier Root Barrier for Street Trees Model: RSB600 Arborgreen Landscape Products
Size: RootStop Recycled Root Barrier 600mm Deep x 30m Roll Phone 1300 760 642 LIC ram LICUALA ramsayi - Queensland Fan Palm 300mm 1 Native
Install as per Detail and manufacturer's specifications.
Shrubs
Softscape
ALP cae ALPINIA caerula - Native Ginger 200mm 23 PSP3 selection
Topsoil Ameliorated site topsoil as per soil testing results or Excavate gardenbed areas 300mm deep and turf areas 150mm deep into existing ground. Cultivate subgrade 150mm. Nominated by contractor and
import MRTS 16 topsoil for garden bed and new turf Backfill turf areas 150mm deep and garden areas 300mm - mounding in center with MRTS 16 topsoil. Refer to details. approved by superintendent. BAC myr BACKHOUSIA myrtifolia - Grey Myrtle 140mm 1 PSP3 selection
areas. Provide soil testing results for topsoil and MRTS-16 Toposil available from;
certification to landscape architect. Hortus Group - contact BAN rob BANKSIA robur - Swamp Banksia 140mm 4 PSP3 selection
Aaron Ashlin 0448 007 350
BLE car BLECHNUM cartilagineum - Gristle Fern 200mm 19 PSP3 selection species
Podium Soil Raised Planters and Podium Planters Podium Planter Profile, Water Proofing, Protection Board, Drainage Cell, Geotextile Fabric and Sand: By builder Hortus Group - Aaron Ashlin BLE sil BLECHNUM gibbum 'Silver Lady Fern' 200mm 18 PSP3 selection species
Soil: Podium Plus by Hortus Group M: 0448 007 350
[email protected] CAL lut CALATHEA lutea - Havana Cigar 300mm 2
Organic Mulch Mulched Gardens Install 100mm deep settled, 25mm+Ø Hoop Pine organic mulch to all gardens keeping mulch 50mm clear of plant Nominated by contractor and COR rub CORDYLINE 'Rubra' 200mm 18 PSP3 selection
stems. On batters steeper than 1:4, install pinned open weave jute netting over mulch. approved by superintendent
HEL bih HELICONIA bihai 'Claw I' 200mm 3
Turf Turf Refer to Plant Schedule and Detail Nominated by contractor and HEL fus HELICONIA psittocroum 'Fuchsia' 200mm 12
approved by superintendent
HEL jam HELICONIA stricta 'Jamaican Dwarf' 200mm 12
HEL sas HELICONIA psittocroum 'Sassy' 200mm 2
HEL red HELICONIA 'Red Christmas' 200mm 8
LEP liv LEPTOSPERMUM liversidgei - Olive Tea Tree 140mm 7 REs 12.3.4, 12.3.5
MAC luc MACROZAMIA lucida 'Pineapple Zamia' 200mm 1 Native
XAN far XANTHOSTEMON chrysanthus 'Fairhill Gold' - dwarf 200mm 4 Native
Groundcovers
ANI red ANIGOZANTHOS species - Red Kangaroo Paw 140mm 16 Native
ANI yel ANIGOZANTHOS species - Yellow Kangaroo Paw 140mm 18 Native
BAL tet BALOSKION tetraphylla -Tassel Cord Rush 140mm 54 REs 12.3.4, 12.3.5
CAS gla CASUARINA glauca 'Cousin It' 140mm 14 Native
CIS rho CISSUS rhombifolia 'Ellen Danica' 140mm 167 Native, Genus in native / in PSP3
GRE coo GREVILLEA 'Cooroora Cascade' 140mm 6 Native
MOL cap MOLINERIA capitulata - Palm Grass 200mm 14 Native
ROS pro ROSEMARINUS officianallis 'Prostratus' -
Prostrate Rosemary 140mm 9
SCA mau SCAEVOLA aemula 'Mauve Clusters' 140mm 21 Native
TURF ZOYSIA 'Empire' Rolls
'A' Grade, healthy,weed and pest free
Note: The site's Queensland Government Vegetation Management Pre-clear Regional Ecosystems (REs) - Of Concern are 12.3.4,
12.3.5 and 12.3.11.
Total Plants = 460
Total non native plants = 49 or 11%
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2161 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. 9 Ann Street, Noosaville, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
M: +614 7705 5222
27.10.21 B Information Request Response BB BB
LD2 Finishes and Planting Schedules E: [email protected]
26.09.21 A For Application BB BB
Sheet Title Sheet 2 of 5 Client: ARCD Projects Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 3
STREET TREE PLANTING DETAIL PLAN Plant pit 2x width of respective pot. 2x pot Ø Shrub / groundcover / tufty
Scarify all pit walls and bottom, typ. grass plant species per plan
Pot Ø
Backfill plant pit with specified 100mm deep and settled organic
50mm x 150mm H4 F14 hardwood timber topsoil, avoid compaction, typ. mulch as specified, keep minimum
Topsoil with mulch edge, refer detail, typical 50mm from plant stem. Form shallow
above - mulch to back dish drain to base of plant, typ.
1800
of kerb, typical Garden topsoil as specified,
avoid compaction, typ.
Rootball
Fix edging with 3x F14 hardwood
Street tree,
50mm x 25mm x 450mm stakes, with 2x 100mm, typ.
refer detail below
galvanised nails to fix stakes to edging, typical
Slow release fertiliser as specified.
'Figure 8' hessian tree tie, typical
Rootbarrier, 2x rootball depth, typ. Use phosphorus free tablets for
see notes below Hardwood stakes (2), see section set parallel Banksia, Callistemon and Grevillea
KERB INVERT
to road, typical species.
150mm, typ. 150mm deep cultivated
subgrade, typ.
ROAD
2x hot dipped galvanised triple grip screw to fix Existing subgrade, typ.
mitred timber edging together, typical
NOTES:
Extent of tree pit excavation to be 1800mm x 1800mm in area, minimum (subject to footpath location). Remove all excavated fill off-site.
Centre tree, 900mm from back of kerb, or between kerb and footpath as applicable. 5 Potted Shrub, Groundcover Planting
Garden areas to extend from back kerb to footpath, typ. LD3 Typical Section Detail N.T.S.
Edging to extend to footpaths where applicable with street tree centrally located within garden (allowing for services setbacks), refer to
plans for path locations.
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Full and even crown, typical
Notes
2 - 50mm x 50mm x 2400mm F14 hardwood
· Refer to architect's plans for planter wall heights/widths/materials and podium planter bed widths.
centrally pointed non-treated stakes (shown
· Refer to hydraulic engineer's plans for planter drainage and irrigation designs, and sealing.
perpendicular to kerb for graphic clarity only)
· Refer to irrigation designer's plans for irrigation system design.
50mm wide hessian tree ties to be driven vertically into ground outside of the
· Water proofing and independent certification of water proof membrane by others.
wrapped loosely around trunk, rootball and shall have a finished height lower
· Refer to Finishes Schedule for product specifications and Planting Schedule for plant selections.
then a figure 8 and secured to than the tree's lower lateral limbs
stake with galvanised nails or Form shallow saucer shaped depression
staples. Position tree tie between
Plant per plan and Plan Schedule around base of plant and keep mulch 50mm
1/3 to 1/2 overall height of tree.
from trunk base
Drip irrigation emitter and tube 4m L root barrier panels as
100mm deep organic mulch as specified.
Slotted inspection grate, do not glue specified, centred at trunk with
Mound mulch at edge of plant pit to collect
root deflecting ribs (or equal)
water to fall down edges of plant pit.
Mulch as specified, 100mm deep settled, 50mm from plant stem, typ. facing tree, installed per
100mmØ uPVC slotted drainage / inspection pipe - 1m from tree rootball, typ. manufacturer's instructions Turf as specified Turf as specified
1) Planter wall, typ. Timber Edge Detail 1 - LD3
150mm Topsoil as specified
2) Waterproofing as specified to all interior planter wall surfaces, typ.
3) Protection board as specified Metal Edging as specified
600
4) Geo-textile membrane as specified Tree pit to be excavated to nominal depth of
Drainage cell as specified 600mm. Backfill hole with 100% friable
ameliorated site topsoil firming progressively. 100mm mulch as specified
50mmØ pvc drip irrigation conduit
All excavated fill to be removed off site. Scarify Tapered Edging Stake as specified
Slow release fertilizer all sides of plant pit, typical.
Proprietary podium drainage unit and carry-off pipe by builder as specified 300mm Topsoil as specified
Podium slab bottom to slope minimum 3% to low point, typ. 150mm cultivated subgrade 100mm deep uniform gravel layer. Provide 150mm cultivated subgrade, typ.
Podium soil as specified and pit walls clean connection to road drainage as advised Existing subgrade
on site by civil engineer.
1 Podium Planter 1:30 3 Street Tree Planting - Timber Edges 1:30 6 Metal Garden Edge N.T.S.
LD3 Typical Section LD3 Typical Section Detail LD3 Typical Detail
NOTES:
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Timber Specification:
Unseasoned hardwood, Class 1 Select Grade F17, ACQ or Tanalith E minimum H4 treatment, Full and even crown, typical
with one coat of timber coating.
2 - 50mm x 50mm x 2400mm F14 hardwood
Galvanised timber centrally pointed non-treated stakes to be
fixing screws, typ. driven vertically into ground outside of the
50mm wide hessian tree ties rootball and shall have a finished height lower
wrapped loosely around trunk, than the tree's lower lateral limbs
then a figure 8 and secured to
stake with galvanised nails or Form shallow saucer shaped depression 600mm
staples. Position tree tie between typical
around base of plant and keep mulch 50mm
1/3 to 1/2 overall height of tree.
from trunk base
ELEVATION
100mm deep organic mulch as specified.
Mound mulch at edge of plant pit to collect
water to fall down edges of plant pit. Varies,
1200mm, maximum refer
Turf as specified Plans
PLAN
150mm x 50 mm timber edging 50mm x 25mm x 450mm Tree pit to be excavated to nominal depth of
hardwood peg 600mm. Backfill hole with 100% friable
20mm @1200mm centres Slow release fertilizer ameliorated site topsoil firming progressively.
Turf as specified as specified All excavated fill to be removed off site. Scarify
Mulch as specified
all sides of plant pit, typical.
2x hot dipped galvanised
triple grip screw to fix mitred
100mm deep uniform gravel layer. Provide
timber edging together,
clean connection to road drainage as advised
typical.
on site by civil engineer. Road
SECTION Back of kerb or hardstand Turf Roll, typical
2 Hardwood Treated Garden Edge N.T.S. 4 Tree Planting - in Garden or Turf 1:30 7 Turfing
LD3 Typical Detail LD3 Typical Section LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2161 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. All 9 Ann Street, Noosaville, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
dimensions in millimetres unless noted otherwise. M: +614 7705 5222
27.10.21 B Information Request Response BB BB
LD3 Details E: [email protected]
26.09.21 A For Application BB BB
Sheet Title Sheet 3 of 5 Client: ARCD Projects Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 4
Planting Plan Legend Detail
Overhead Electric Service
E Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Existing Sewer Service
EX Refer to plans by others to confirm locations and
S/ locate on-site prior to commencing works
Telecom Service
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Water Service
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
5 Stormwater
RP69150
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
Timber Garden Edge 2
E
TE Refer to Specifications, Detail
7 LD3
RP69150
1 LEP liv Steel Garden Edge 2
B E
No trees within ST
E
BM: Nail in Kerb
1 HEL bih Refer to Specifications, Detail
1 ELA ret 1 LEP liv LD3
1500mm of
sewerline per 5 HEL fus 11 BLE car 2 HEL bih 2 BLE car 2 BLE car 4 BLE car 6 BAL tet
Unitywater, typ. 1500 10 BLE sil 2 BLE sil 2 BLE sil 4 BLE sil 7 COR rub 6 ALP cae Street Trees 2-3
RL: 1.59
B Refer to Specifications, Plant Schedule, Detail(s) LD3
E
45.261 180°02'20" E
Trees 4
T
T
T
E
E
SW
SW SW
SW
W
SW SW E
SW SW
SW SW
SW
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW
SW SW SW Refer to Specifications, Plant Schedule, Detail(s)
SW
SW
LD3
SW SW SW SW SW SW SW SW SW SW SW SW SW SW 1 LEP liv
SW
SW
STE
SW
E
SW
4 XAN far Spa 1 BAN rob
SW Shrubs 5
TE
W
STE 14 SCA mau Refer to Specifications, Plant Schedule, Detail LD3
RL:2.35 (Top of Wall)
SW
SP155157
1 ANI red, 2 ANI yel 1 ARC imp
Emt A
STE
2 1
SW
1 ROS pro
E
1 LEP liv TE Groundcovers 5-6
1 BAC myr
11
STE
2 ANI red, 1 ANI yel Refer to Specifications, Plant Schedule, Detail LD3
W
1 HOW for
655m²
1 BAN rob
Pool 2 ALP cae
35 CIS rho
STE
TE Turf 7
5 HEL jam, 12 BAL tet
E
14.464
Refer to Specifications, Plant Schedule, Detail LD3
4 HEL red -
STE
1 ACM smi
W
CP 2 HEL jam
SP159366 alternated 7 SCA mau
Timber Retaining Wall
b
TE
10 CIS rho
STE
B 1 BAN rob
SW
SW
E
1 LEP liv
2 HEL red 2 HEL jam
W
SW
SW
2 ELA ret 7 CIS rho 7 CIS rho
SW
SW New site water
90°00'10" SW 8 BAL tet 2 ALP cae 6 BAL tet
E
meter tap to
269°59'40"
1 CAL lut
14.464
2 HEL jam,
W
Pool Spa 1 CAL lut SW existing Unity
2 HEL red - Water main
6 HEL fus 7 CIS rho alternated
SW
SW
1 MAC luc
Ann Street
E
STE
W
SW SW SW SW SW SW SW SW SW
0°02'20" 45.263
B
86 CIS rho 13 ALP cae 1 COR rub 2 COR rub 11 BAL tet 6 COR rub
E
B 3 HEL jam 1 HEL fus 11 BAL tet 2 COR rub 1 LEP liv
1500
1 LIC ram 1 LEP liv 15 CIS rho 1 BAN rob
2 HEL sas
E
CP
E
GTP2094
SP176870
6
E
Scale in metres
0 1 2 5 10 BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
PLAN NOTES:
See Sheet LD2 for Schedules
NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:100 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:200 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2161 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
have been partially furnished and require confirmation. Prior Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. All 9 Ann Street, Noosaville, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
to and during construction obtain the location of all services dimensions in millimetres unless noted otherwise. M: +614 7705 5222
27.10.21 B Information Request Response BB BB
(underground and overhead) from the responsible authority LP1 Planting Plan - Ground Floor E: [email protected]
26.09.21 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 4 of 5 Client: ARCD Projects Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North
Page 5
Planting Plan Legend Detail
Overhead Electric Service
E Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Existing Sewer Service
EX Refer to plans by others to confirm locations and
S/ locate on-site prior to commencing works
Telecom Service
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Water Service
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Stormwater
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
Timber Garden Edge 2
TE Refer to Specifications, Detail
LD3
E Steel Garden Edge 2
ST Refer to Specifications, Detail
LD3
Street Trees 2-3
Refer to Specifications, Plant Schedule, Detail(s) LD3
Trees 4
Refer to Specifications, Plant Schedule, Detail(s)
LD3
From north to south; From north to south;
1 ANI yel 1 ANI yel
1 CAS gla 1 CAS gla Shrubs 5
B 1 GRE coo 1 GRE coo B
Refer to Specifications, Plant Schedule, Detail LD3
1 ROS pro 1 ROS pro
1 CAS gla 1 CAS gla
1 ANI yel 1 ANI yel
Groundcovers 5-6
Refer to Specifications, Plant Schedule, Detail LD3
3 ANI red
3 ANI yel
2 1 3 ANI red
3 ANI yel
Turf
Refer to Specifications, Plant Schedule, Detail
7
LD3
2 CAS gla 2 CAS gla
B B
2 GRE coo 2 GRE coo
4 MOL cap 4 MOL cap
1 ROS pro 1 ROS pro
2 ANI red 2 ANI red 2 ANI red
2 ANI yel 2 ANI yel 2 ANI yel
2 CAS gla 2 CAS gla 2 CAS gla
2 MOL cap 2 MOL cap 2 MOL cap
1 ROS pro 2 ROS pro 1 ROS pro
Scale in metres
0 1 2 5 10 BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
PLAN NOTES:
See Sheet LD2 for Schedules
NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:100 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:200 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2161 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
have been partially furnished and require confirmation. Prior Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. All 9 Ann Street, Noosaville, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
to and during construction obtain the location of all services dimensions in millimetres unless noted otherwise. M: +614 7705 5222
27.10.21 B Information Request Response BB BB
(underground and overhead) from the responsible authority LP2 Planting Plan - First Floor E: [email protected]
26.09.21 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 5 of 5 Client: ARCD Projects Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North