SSE - TE249167 - 328 Upper Pinbarren Creek Road, Pinbarren Qld 4568
PROJECT:
REVISIONS
ONSITE WASTEWATER TREATMENT AND EFFLUENT DISPOSAL SYSTEM #
A
DATE SUBJECT
06/11/2024 REVISION A
AUTHORISED
C. TAYLOR
FOR TINY HOME AT 328 UPPER PINBARREN CREEK ROAD, PINBARREN
GENERAL NOTES LEGEND
1. LOCATION OF HSTP, ORG, VENT PIPE AND OTHER WASTE PIPES TO BE DETERMINED BY PROPERTY BOUNDARY TAYLOR ENVIRONMENTAL
PLUMBER EASEMENT
2. REFER TO COMPLIANCE PERMIT FOR CONDITIONS OF COUNCIL APPROVAL CONTOUR - MINOR
3. PROPERTY FEATURES, STRUCTURES AND CONTOURS HAVE BEEN REPRODUCED BASED ON CONTOUR - MAJOR
THE BEST AVAILABLE INFORMATION AND MAY NOT BE COMPLETE OR ACCURATE DECOMMISSION
4. THE SYSTEM INSTALLER IS RESPONSIBLE TO ESTABLISH THE LOCATION, LEVELS AND
DEPTHS OF ALL EXISTING SERVICES ON-SITE PRIOR TO COMMENCING ANY WORKS MSES VEGETATION
5. LOCATIONS AND SETOUT DIMENSIONS SHOWN ARE APPROXIMATE ONLY AND ARE TO BE VEGETATION LINE
CONFIRMED ON SITE. TREE LINE
6. ACCESS AND LAY DOWN AREAS ARE TO BE CONFIRMED BY THE SYSTEM INSTALLER PROTECTED TREE
7. EXISTING BUILDINGS AND EXTERNAL STRUCTURES SHOWN ON THESE DRAWINGS ARE INTERMITTENT WATERBODY
OBTAINED FROM THE AVAILABLE INFORMATION AND MAY NOT BE COMPLETE AND PERMANENT WATERBODY
ACCURATE FLOW PATH
8. ALL DIMENSIONS ARE IN MM U.N.O DEFINED FLOOD LINE
9. PLUMBING AND DRAINAGE TO QLD PLUMBING & WASTEWATER ACT, AS / NZS 3500 CHANGE OF GRADE
10. ALL PIPE WORK TO AS / NZS 4020 TOP OF BANK
11. ALL TANKS TO BE INSTALLED AND ANCHORED IN COMPLIANCE WITH THE RETAINING WALL
MANUFACTURERS SPECIFICATIONS
12. FLEXIBLE JOINTS ON ALL INSTALLED TANKS (AS / NZS 3500) WASTEWATER COMPONENT
13. THERE SHALL BE NO CROSS CONNECTION BETWEEN ANY WASTEWATER / EFFLUENT GRAVITY DRAINAGE - NEW
PIPEWORK AND ANY POTABLE WATER SUPPLY PIPEWORK GRAVITY DRAINAGE - EXISTING
14. MINIMUM DISTANCE BETWEEN TANKS AND BUILDINGS TO BE MAINTAINED (AS/NZS 3500) RISING MAIN - NEW
15. USE ONLY A LICENSED DRAINER THAT HAS BEEN ACCREDITED BY THE SYSTEM RISING MAIN - EXISTING
SUPPLIER.
16. FINAL LOCATION OF THE LAND APPLICATION AREA AND ASSOCIATED PIPE WORK CAN STORMWATER PIPE
ONLY BE ALTERED ON SITE TO MEET THE SITE CONDITIONS AFTER APPROVAL FROM WATER MAINS
TAYLOR ENVIRONMENTAL (AUSTRALIA) PTY LTD ELECTRICAL - OVER HEAD
QBCC LICENCE NUMBER 150 556 72
17. GRADE ALL BATTERS EVENLY AT 1 IN 5, UNLESS NOTED OTHERWISE ELECTRICAL - UNDERGROUND ABN NUMBER 95268308955
18. ANY SOILS ENCOUNTERED WHICH SHOW EVIDENCE OF CONTAMINATION ARE TO BE COMMS SERVICES
STOCKPILED SEPARATELY. CONTAMINATED SOIL SHALL BE HANDLED IN ACCORDANCE NBN SERVICES
WITH ALL WORKPLACE HEALTH & SAFETY AND ENVIRONMENTAL REGULATIONS TELSTRA SERVICES
Phone: +61 400 301 364
19. IT IS THE INSTALLERS RESPONSIBILITY TO PROVIDE ACCURATE 'AS CONSTRUCTED' GAS SERVICES Email: [email protected]
DRAWINGS TO RELEVANT LOCAL AUTHORITY AND INCUR ASSOCIATED COST FIRE MAIN SERVICES Web: www.taylorenviro.com.au
20. ALL DISTURBED AREAS TO BE REINSTATED TO NATURAL GROUND CONDITIONS
21. EXISTING TOPSOIL IS TO BE RETAINED AND SET ASIDE (WINDROWED) TO PREVENT
DAMAGE FROM MACHINERY AND REDISTRIBUTED ONCE INSTALLATION IS COMPLETE
22. AT LEAST A 5 TONNE MACHINE WITH POSI-TRACK SYSTEM IS REQUIRED FOR ABBREVIATIONS
EARTHWORKS TO ELIMINATE POTENTIAL TRACK INDENTATIONS INTO GROUND LEVEL
23. ALL MATERIALS SHALL BE NEW, PROVEN IN SERVICE AND SUITABLE FOR THE INTENDED AAV AIR ADMITTANCE VALVE
USE AES ADVANCED ENVIRO SEPTIC OSSF SYSTEM
24. IT IS THE RESPONSIBILITY OF THE INSTALLER TO ENGAGE THE DESIGNER TO AS
B
AUSTRALIAN STANDARD
HAND BASIN PIN WASTE WATER TREATMENT &
UNDERTAKE INSPECTIONS DURING INSTALLATION. FAILURE TO DO SO WILL RESULT IN BARR
THE FORM 8 / COMMISSIONING CERTIFICATE NOT BEING ABLE TO BE COMPLETED BTH
COS
BATH TUB
CLEAR OUT TO SURFACE EN EFFLUENT DISPOSAL SYSTEM
25. DO NOT SCALE FROM DRAWINGS CRE
26. TAYLOR ENVIRONMENTAL TAKES NO RESPONSIBILITY FOR WORKS UNDERTAKEN BY THE CS CLEANERS SINK EK
INSTALLER AND/OR INSTALLATIONS THAT ARE NOT IN ACCORDANCE WITH THESE PLANS DG DISCONNECTOR GULLY
27. THESE PLANS ARE TO BE READ IN CONJUNCTION WITH THE SITE AND SOIL REPORT, DW DISHWASHER AUTHORISED FOR ISSUE DATE
ARTICULATED JOINT DESIGN AND REGULATOR ISSUED COMPLIANCE PERMITS e?? EXISTING ITEM
FFL FINISHED FLOOR LEVEL
FSL FINISHED SURFACE LEVEL UP
SANITARY DRAINAGE AND PLUMBING PE 06/11/2024
1. SANITARY DRAINAGE SHALL BE ∅100 UPVC AT A 1:60 MINIMUM GRADE FWG FLOOR WASTE GRATE R PIN
2. IO's UNDER CONCRETE/IMPERMEABLE GROUND COVERINGS SHALL BE TAKE TO SURFACE HSTP HOME SEWAGE TREATMENT PLANT BA
LEVEL AS AN IOS AND FITTED WITH AN APPROVED SCREW CAP IL INVERT LEVEL RR STREET ADDRESS
3. ORG' RISERS SHALL BE TO AS3500.2 AND EXTEND TO AN APPROVED GRATE AT 150mm IO INSPECTION OPENING EN
IOS INSPECTION OPENING TO SURFACE C RE 328 UPPER PINBARREN CREEK RD, PINBARREN
BELOW LOWEST FIXTURE, 75mm ABOVE GROUND LEVEL AND ABOVE DEFINED FLOOD EK
IV INDEXING VALVE
LEVEL
LAA LAND APPLICATION AREA
RO LOT & PLAN
4. UNDERSLAB SANITARY DRAINAGE SHALL BE INSTALLED IN ACCORDANCE WITH THE AD
LT LAUNDRY TUB
ARTICULATED JOINT DESIGN (WHERE REQUIRED) AND AS3500.2 APPENDIX G
NGL NATURAL GROUND LEVEL LOT 3 RP851976
5. LAGGING IN ACCORDANCE WITH AS3500
ORG OVERFLOW RELIEF GULLY
6. BURIED PIPEWORK SHALL BE 200mm DEEP IN NON TRAFFICABLE AREAS AND 500mm
OSSF ON-SITE SEWAGE FACILITY
COUNCIL
DEEP IN TRAFFICABLE AREA, OR IN ACCORDANCE WITH AS3500
RL REDUCED LEVEL NOOSA SHIRE
INSTALLATION S SINK
1. IT IS THE INSTALLERS RESPONSIBILITY TO ENSURE THAT ALL COMPONENTS COMPLY SHR SHOWER NAME OF CLIENT
WITH THESE GUIDES UPON COMMISSIONING OF THIS SYSTEM ST STACK
2. ALL BURIED PIPE WORK IS TO BE IDENTIFIED WITH UNDERGROUND MARKING TAPE UR URINAL VIKI DIOSZOGI
PLACED ABOVE THE PIPE WORK V VENT
WC WATER CLOSET DESIGNER
3. ALONG THE BOUNDARY OF THE LAND APPLICATION AREA THERE SHALL BE AT LEAST 2
WARNING SIGNS CLEARLY VISIBLE TO ADVISE THAT RECYCLED WATER IS USED (EACH C. TAYLOR
SIGN SHALL COMPLY WITH AS1319 AND HAVE THE WORDING RECYCLED WATER - AVOID
CONTACT DO NOT DRINK) DRAWN
MAINTENANCE M. MAHONY
1. SYSTEM TO BE SERVICED AND MAINTAINED IN ACCORDANCE WITH MANUFACTURE
DRAWING DETAILS
SPECIFICATIONS AND COUNCIL GUIDELINES
2. SEPTIC TANKS TO BE CHECKED FOR SOLIDS BUILD UP ANNUALLY SUBJECT PROPERTY TITLE PAGE
3. SEPTIC TANKS TO PUMPED OUT IF 31 FULL OF SOLIDS OR 5 YEARS (WHICHEVER IS
SOONER) 1:7500 @ A3 JOB NUMBER
4. LAND APPLICATION IS IMPORTANT AND IS TO BE REGULARLY MOWED AND ANIMALS
AND VEHICLES EXCLUDED TE249167
SCALE REVISION DWG #
1:7500 A SL0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.