SSE - TE249167 - 328 Upper Pinbarren Creek Road, Pinbarren Qld 4568
3 Proposed Wastewater System
3.1 Proposed Wastewater System
It is proposed to relace the composing tank leachate drain and the greywater disposal with a partitioned
septic tank and advanced enviro septic (AES) bed. A 10m setback is required to the surface waters, and
as such a pump is required in the second chamber of the septic tank.
3.2 Design Details
Table 4 below presents the features of the proposed wastewater system.
Table 5: Design Features
Feature Details
Water supply Rain water / bore water
Volume Allowance 1503 L/person/day
Design Volume Number of bedrooms 1
Design population 2
Total Design Volume (Q) 300 L/day
Category 5
Soil Characteristics
Design Loading Rate (DLR) 12 mm/day
Septic tank capacity 3000 L (min) partitioned tank, with pump
Treatment facility Advanced Enviro Septic (AES)
Treatment System
Treatment plant approval 06 - 2024
Treatment level Advanced secondary
Required disposal area A = Q/DLR = 25 m2
Disposal Area Footprint as per
12.9m x 1.94m = 25 m2
AES Design Calculator
The design of the AES system is presented in Appendix A.
The Advanced Enviro-Septic Approved Design Calculator is presented in Appendix B.
The AES Treatment Plant Approval is presented in Appendix C.
General requirements and notes
• 100% reserve area to be kept clear of permanent structures
• Deep rip base of beds and spread gypsum at 1kg/m2
• Grass is to be established in the land application area, and mown regularly
• Stormwater should not traverse the land application area. Construct a stormwater diversion
upslope
• General access to the land application area by pedestrians, vehicles and animals is to be
generally excluded
• Install at least 2x ‘effluent reuse’ warning signs around land application area
• The system is to be installed, operated and serviced in accordance with manufacture
specifications
• The land application area has been designed based on a daily wastewater volume in accordance
with AS1547. Any exceedance of this design volume may have adverse effects on the land
application area
3
Conservative volume allowance, as composting toilets have very low discharge volumes
Site and Soil Evaluation 328 Upper Pinbarren Creek Road, Pinbarren Qld 4568
Taylor Environmental (Australia) Pty Ltd Page 6 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.