Stormwater Management
 2




Plan
25 Pavilion Street, Pomona
JNE Developments Pty Ltd




                           21-0166SMP01-V1
                             12 August 2021
Log in to download the original file

SWMP.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 31 pages

Page 2

COMMERCIAL IN CONFIDENCE
This document is commercial-in-confidence. The recipient of this document agrees to hold all
information presented within as confidential and agree not to use or disclose or allow to use or
disclosure of the said information to unauthorized parties, directly or indirectly, irrespective of the
acceptance or rejection of the presentation or at any time before, during or after an
agreement has been reached, without prior written consent.




PEAKURBAN Pty Ltd
ABN 44 615 403 506
Brisbane
Level 4, 196 Wharf Street
Spring Hill Qld 4000
Sunshine Coast
Level 2, 1 Innovation Parkway
Birtinya Qld 4575
Melbourne
Level 1, 1-5 Nantilla Road
Notting Hill Vic 3168


E [email protected]
W peakurban.com.au




DOCUMENT CONTROL
21-0166SMP01-V1

  Version          Date      Details         Prepared   Checked    Approved      Signed       RPEQ
     1         12/08/2021    Issue               BB       BB          BB                      11523


Supersedes the following reports:

         Version            Date       Details                 Prepared       Checked     Approved

Page 3

      CONTENTS
      1.    INTRODUCTION .............................................................................................................................. 1
            Site Location .................................................................................................................................. 2
            Flood Overlay ................................................................................................................................ 2
            Lawful Point of Discharge ............................................................................................................ 3

      2.    STORMWATER QUANTITY ............................................................................................................... 4
            Hydrologic Assessment................................................................................................................. 4
            2.1.1.             Existing Scenario ........................................................................................................ 4
            2.1.2.             Rational Method Check .......................................................................................... 5
            2.1.3.             Developed Scenario ................................................................................................ 6
            2.1.4.             Mitigation Scenario ................................................................................................... 7
            Flood Immunity .............................................................................................................................. 9

      3.    STORMWATER QUALITY ............................................................................................................... 10
            Design Objectives ....................................................................................................................... 10
            Stormwater Quality Treatment .................................................................................................. 10
            3.2.1.             Strategy .................................................................................................................... 10
            3.2.2.             MUSIC Parameters .................................................................................................. 10
            3.2.3.             Catchment Areas ................................................................................................... 11
            3.2.4.             MUSIC Model Layout .............................................................................................. 12
            Treatment Measures ................................................................................................................... 13
            3.3.1.             Bioretention System ................................................................................................ 13
            3.3.2.             Sediment Forebays ................................................................................................. 14
            Results ........................................................................................................................................... 14

      4.    CONSTRUCTION PHASE MANAGEMENT .................................................................................... 15
            Erosion and Sediment Control................................................................................................... 15

      5.    ESTABLISHMENT AND OPERATIONAL PHASE MANAGEMENT .................................................. 16
            Establishment............................................................................................................................... 16
            Operational ................................................................................................................................. 16

      6.    CONCLUSION .............................................................................................................................. 17

      7.    REFERENCES ................................................................................................................................. 18


      LIST OF TABLES
      Table 2-1: Summary of Existing Catchment Parameters .................................................................. 5
      Table 2-2: Existing Catchment Peak Flows ......................................................................................... 5
      Table 2-3: Comparison of WBNM and Rational Method Peak Flows ............................................. 5
      Table 2-4: Summary of Developed Catchment Parameters ........................................................... 6
      Table 2-5: Comparison of Peak Flows At Site Outlet (Existing Vs. Developed) .............................. 7




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona

Page 4

      Table 2-6: Summary of Basin Structure Details ................................................................................... 7
      Table 2-7: Comparison of Peak Flows Site A (Existing Vs. Mitigated) .............................................. 8
      Table 3-1: Site Stormwater Quality Objectives (Operational Phase) ............................................ 10
      Table 3-2: Urban land use (Split Source Nodes) - Pollutant Export Parameters ........................... 11
      Table 3-3: MUSIC Runoff Generation Parameters ........................................................................... 11
      Table 3-4: Catchment Areas ............................................................................................................. 11
      Table 3-5: Bioretention Design Parameters ...................................................................................... 13
      Table 3-6: Sediment Forebay Design Parameters ........................................................................... 14
      Table 3-7: MUSIC Results – Load Based Pollutant Outputs ............................................................. 14


      LIST OF FIGURES
      Figure 1-1: Site Location ....................................................................................................................... 2
      Figure 1-2: Overland Flow Paths and Flood Hazard Overlay Mapping ......................................... 3
      Figure 2-1: Existing Catchment Delineation ....................................................................................... 4
      Figure 2-2: Developed Catchment Delineation ............................................................................... 6
      Figure 2-3: Development Located above the Regional 1% AEP Flood Extent .............................. 9
      Figure 3-1: WSUD Catchment Locality Plan ..................................................................................... 12
      Figure 3-2: MUSIC Model Layout ....................................................................................................... 12


      APPENDICES
                               Reconfiguration of Lot Plan and Concept Engineering Drawings
                               Rational Method and WBNM Outlet




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona

Page 5

      1. INTRODUCTION
      PEAKURBAN Pty Ltd have been engaged by JNE Developments Pty Ltd to prepare a
      Stormwater Management Plan (SMP) in support of a development application to Noosa Shire
      Council (NSC) over land located at 25 Pavilion Street, Pomona (Lot 21 SP 316902). This
      development application seeks a development permit for a Reconfiguration a Lot (ROL) to
      create 10 residential lots.
      The proposed outcome of this document is to identify stormwater management options that
      could be implemented within the development in order to achieve the requirements and
      targets of NSC Planning Scheme “Water Quality and Drainage Code” as well as the relevant
      provisions of State Planning Policy (SPP 2017). The intent of the codes associated with these
      documents will be achieved through the appropriate integration of stormwater
      management options within the proposed residential land-use. The objectives of this
      Stormwater Management Plan are to:
         Detail the proposed stormwater quality management strategy and how the load
          reduction objectives specified by the State Planning Policy (SPP, DSDIP 2017) and NSC
          Planning Scheme are achieved during the operational phase of the development;

         Consider suitable Stormwater Quality Improvement Devices (SQID’s) based on Water
          Sensitive Urban Design (WSUD) principles;

         Outline the maintenance requirements for the proposed stormwater quality improvement
          devices;

         Ensure the development achieves non-worsening of stormwater flows downstream of the
          site; and

         Demonstrate how the lawful point of discharge requirements for the site will be achieved.

         Demonstrate development is located outside of Flood Hazard Overlay Mapping.

      The proposed Plan of Subdivision and concept engineering plans can be found in Appendix
      A.




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                             |1

Page 6

             Site Location
      The location of the proposed development site is shown in Figure 1-1, with a total land
      holdings area covering 3.35ha. The site is consistent with a rural residential land use type with
      an orchard and some wooded vegetation cover over the site. The site is accessed by
      Pavilion Street off the eastern and is bounded by private allotments to the north and west
      and caravan park to the south. Cooroora Creek is located in the adjacent property to the
      west.




                                              SITE




      Figure 1-1: Site Location


             Flood Overlay
      The rear of the site is partially influenced by flooding from Cooroora Creek, which is located
      to the west of the property. The inundation extent identified in the Flood Hazard Overlay is
      highlighted in Figure 1-2.




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                 |2

Page 7

      Figure 1-2: Overland Flow Paths and Flood Hazard Overlay Mapping




             Lawful Point of Discharge
      As outlined by the Queensland Urban Drainage Manual (4th Edition – Institute of Public Works
      Engineering Australasia, Queensland Division) a test can be undertaken to determine
      whether a lawful point of discharge exists:
      The criteria for determining the lawful point of discharge are:
      (i)     Will the proposed development alter the site’s stormwater discharge characteristics in
              a manner that may substantially damage a third-party property (see Section 3.6)?

                  If not, then no further steps are required to obtain tenure for a lawful point of
                   discharge (assuming any previous circumstances and changes were lawful).

      It is proposed that discharge of runoff from the proposed development site will be
      maintained to the property boundary within the mapped waterway.
      It is considered that discharge from the site will be managed in such a manner as to not
      substantially damage third party property, and as a result it is considered suitable lawful
      points of discharge has been identified and achieved.




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                              |3

Page 8

      2. STORMWATER QUANTITY
      The objective of this component of the study is to investigate the potential impact that the
      proposed development will have on peak flows discharging downstream from the site.

             Hydrologic Assessment
      Hydrologic modelling of the catchments has been undertaken using WBNM software (Boyd
      et al, 2019), developed jointly by the University of Wollongong, Rienco Consulting and
      Balance R&D. The 2012 version has been used for this investigation which utilizes ARR87
      hydrology.
      Modelling has been carried out for the 1, 2, 5, 10, 20, 50 and 100-year Average Recurrence
      Interval (ARI) storm events for the following scenarios:
          1. Existing Scenario (base case)
          2. Developed Scenario
          3. Mitigated Scenario

      2.1.1. Existing Scenario

      Sub-catchments have been delineated using 1m contours sourced from the NSC catalogue,
      developed using 2015 LiDAR and site survey. The fraction impervious values have been
      calculated using aerial imagery. Figure 2-1 shows the existing catchment delineation with a
      summary of parameters shown in Table 2-1.




      Figure 2-1: Existing Catchment Delineation




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                            |4

Page 9

      The existing drainage capacity of Pavilion Street is approximately equivalent to the 10% AEP
      storm event, with flow greater than this overtopping the verge and entering the site. To
      account for this, the peak flow for SUB1-Ex was determined for the 10%, 5%, 2% and 1% AEP.
      The portion of flow greater than the 10% AEP was converted into a ratio, which was then
      applied to the catchment area as detailed below in Table 2-1. This ensured that flows from
      SUB1-Ex greater than the 10% AEP were routed through the site.
      Table 2-1: Summary of Existing Catchment Parameters

       Sub-catchment                          Area (ha)                       Imperviousness (%)
       SUB1                                      3.407                               11
       SUB1-Ex                                   0.287                               50
       SUB1-Ex (<10% AEP)                           0.0*                              -
       SUB1-Ex (5% AEP)                         0.047*                               50
       SUB1-Ex (2% AEP)                         0.095*                               50
       SUB1-Ex (1% AEP)                         0.138*                               50
      * area factored based on flow rate for events greater than 10% AEP

      The WBNM model has been run for events from 1 to 100-year ARI and for durations of 20
      minutes to 3 hours. A WBNM catchment lag factor of 1.6 was applied which is within the
      recommended range. An initial and continuing loss of 10mm and 2.4mm/hr has been
      applied refer to Rational Method Check). The resulting peak flows for the critical duration are
      provided in Table 2-2 for each event at the outlet reporting locations.
      Table 2-2: Existing Catchment Peak Flows

       Event AEP                63.2%        50%           20%       10%      5%          2%       1%

       SUB1 (m3/s)               0.34        0.42          0.64      0.80     0.95        1.12     1.27

      2.1.2. Rational Method Check

      Pre-development peak flows have been checked against peak flows determined using the
      Rational Method (RM) for SUB1, as shown in Table 2-3. A time of concentration of 20.6
      minutes was determined for SUB1 rational method. It can be seen there is less than ten
      percent difference across all assessed events, indicating that the WBNM model flows are
      suitable for use. Refer to Appendix B for a summary of rational method parameters used.
      Table 2-3: Comparison of WBNM and Rational Method Peak Flows

       Event AEP                   63.2%       50%          20%        10%     5%         2%       1%

       Rational (m3/s)              0.34       0.40         0.61       0.75   0.89        1.12     1.29
       WBNM (m3/s)                  0.34       0.42         0.64       0.80   0.95        1.12     1.27
       Difference (%)               2.3         3.0          4.4       6.3     6.3        0.1      -0.9




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                 |5

Page 10

      2.1.3. Developed Scenario

      The Developed Scenario has been modelled in WBNM by adjusting the site’s fractions
      impervious values and catchment delineation to represent the proposed development. The
      impervious fraction for the developed portion of the SUB1 has increased from 11% to 50%
      (values consistent with ‘Urban Residential – low density (Including roads)’ catchments in
      QUDM (2017)). The developed catchment delineation is shown in Figure 2-2. SUB1 represents
      the development with flows being routed through the proposed detention basin. SUB2 enters
      the site from the south and will be routed around the building envelope of Lot 10. The
      catchment parameters are summarised in Table 2-4.




      Figure 2-2: Developed Catchment Delineation

      Similar to the existing scenario, the existing drainage capacity of Pavilion Street is
      approximately equivalent to the 10% AEP storm event, with flow greater than this
      overtopping the verge and entering the site. To account for this, the peak flow for SUB1-Ex
      was determined for the 10%, 5%, 2% and 1% AEP. The portion of flow greater than the 10%
      AEP was converted into a ratio, which was then applied to the catchment area as detailed
      below in Table 2-4. This ensured that flows from SUB1-Ex greater than the 10% AEP were routed
      through the site.
      Table 2-4: Summary of Developed Catchment Parameters

       Sub-catchment                          Area (ha)                     Imperviousness (%)
       SUB1                                      2.018                             50
       SUB2                                      1.317                              5




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                             |6

Page 11

       SUB1-Ex                                   0.287                                    50
       SUB1-Ex (<10% AEP)                         0.0*                                    -
       SUB1-Ex (5% AEP)                         0.047*                                    50
       SUB1-Ex (2% AEP)                         0.095*                                    50
       SUB1-Ex (1% AEP)                         0.138*                                    50
      * area factored based on flow rate for events greater than 10% AEP

      The increased imperviousness and changes to catchment areas associated with the
      development resulted in an increase in peak flows to the sites outlet as shown in Table 2-5.
      Mitigation will be required to ensure non-worsening downstream and satisfy the lawful point
      of discharge requirements.
      Table 2-5: Comparison of Peak Flows At Site Outlet (Existing Vs. Developed)

       Event AEP                     63.2%        50%        20%        10%         5%         2%     1%

       Existing (m3/s)                0.34        0.42       0.64           0.80   0.95        1.12   1.27
       Developed (m3/s)               0.41        0.49       0.72           0.88   1.05        1.25   1.41
       Change (m3/s)                  0.06        0.07       0.08           0.09   0.10        0.13   0.13



      2.1.4. Mitigation Scenario

      When comparing the peak flows in the existing and developed scenarios, increases in the
      peak discharge are predicted at the site outlet. A detention basin is proposed to attenuate
      peak flows discharging from the site to demonstrate non-worsening and meet the legal point
      of discharge requirements.
      All modelling parameters remain consistent between the developed and mitigated
      scenarios, with the addition of detention basins. The proposed basin structure details are
      summarised in Table 2-6 with Concept Engineering Drawings included in Appendix A.
      Table 2-6: Summary of Basin Structure Details

                                  Basin A1

           Elevation (RL)                    Storage (m3)

                   0                                0
                  0.1                              26
                  0.2                              55
                  0.3                              87
                  0.4                              123
                  0.5                              162
                  0.6                              205
                  0.7                              251
                  0.8                              301
                 0.87                              338




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                    |7

Page 12

                 0.97                              395
       Pipe Outlet                1 x 450mm RCP at RL0.0m
       Weir Outlet                4m wide at RL.0.60m
       Crest Level                RL 0.97m
       Q100 WSL                   RL0.80m
       Freeboard                  0.17m


      Peak flows from the mitigated scenario modelling are presented in Table 2-7 with a
      comparison against the existing peak flows. The results show that there is non-worsening for
      events up the 10% AEP, with a minor increase noted in the larger events. The intent of sizing
      the detention basin is to mitigate flows up to the 5% AEP storm event to ensure non-
      worsening of discharges into the downstream flow path. In larger events, flows from the site
      will start to sheet flow across the rear of the site to Cooroora Creek. As the discharge point
      for the site becomes inundated from Cooroora Creek flooding in the major storm event (refer
      Figure 1-2), it is considered that the very minor increases noted from the site become
      inconsequential as a result of downstream site being drowned out by creek flooding.
      The catchment size of Cooroora Creek reporting past the site is approximately 1,400 ha. The
      very minor increases in peak flows in the major event would be considered to not result in
      any quantifiable change to downstream flooding conditions.
      Table 2-7: Comparison of Peak Flows Site A (Existing Vs. Mitigated)

       Event AEP                     63.2%        50%        20%            10%    5%      2%     1%

       Existing (m3/s)                0.34        0.42       0.64           0.80   0.95    1.12   1.27
       Mitigated (m3/s)               0.32        0.36       0.60           0.76   0.92    1.15   1.32
       Change (m3/s)                  -0.03      -0.05       -0.04      -0.03      -0.02   0.03   0.04


      Table 2-6 provides a summary of the basin configuration and it is noted there is 0.17m
      freeboard from the 1% AEP flood level to the basin crest. A sensitivity analysis was undertaken
      to assess the impact of 100% blockage of both basin outlet configurations. Under this
      scenario the flood level rose to RL0.88m and demonstrates the spillway is able to convey the
      1% AEP flows under fully blocked conditions without overtopping the embankment crest.
      Given this and the fact that the land downstream of the detention basin will remain
      undeveloped it is considered that the 0.17m from the 1% AEP flood level (and 0.4m from
      spillway level) to dam crest level is acceptable.
      It is noted that with the inclusion of 0.3m of Extended Detention Depth for the co-located
      bioretention basin, the total Q20 depth for the basin is expected to be less than the 1.2m
      recommended by QUDM for safety concerns.
      Refer to Appendix B for summary of WBNM output.




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                |8

Page 13

             Flood Immunity
      The proposed development is located outside of the regional 1% AEP flood extent shown
      within NSC Flood Hazard Overlay Map (refer Figure 2-3). No further assessment is required
      with respect to assessing flooding impacts.
      It is recommended that future buildings on each lot achieve a minimum of 500mm freeboard
      above the regional 1% AEP flood level.




           Regional 1% AEP flood Extent




      Figure 2-3: Development Located above the Regional 1% AEP Flood Extent




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                         |9

Page 14

      3. STORMWATER QUALITY
             Design Objectives
      This report identifies the stormwater quality management objectives for the operational
      phase (post-construction phase) of the proposed development. Construction based
      stormwater quality management objectives will need to be addressed as part of operational
      works documentation.
      NSC Planning Scheme (2020) defines the post-construction phase Water Quality Objectives
      as shown in Table 3-1.
      Table 3-1: Site Stormwater Quality Objectives (Operational Phase)

              Minimum reductions in mean annual loads from unmitigated development (%)

          Total Suspended           Total Phosphorous             Total Nitrogen   Gross pollutants
             Solids (TSS)                   (TP)                       (TN)            >5 mm
                  80                         60                         45               90



             Stormwater Quality Treatment
      3.2.1. Strategy

      The objective of this report is to assess the stormwater quality measures required based on
      the development layout to support the development application. Runoff from the
      development will be collected in a stormwater drainage system and discharged into a
      bioretention basin prior to being discharged from the site.
      This report sizes the required bioretention basins to treat runoff from the proposed
      development of this site only.

      3.2.2. MUSIC Parameters

      An assessment of stormwater runoff quality from the existing conditions and proposed
      developed conditions has been undertaken using the Model for Urban Stormwater
      Improvement Conceptualisation (MUSIC) – Version 6.3, released in 2018.
      Climate data for the catchment was sourced from the MUSIC model database. The rainfall
      and evaporation data template for this site has been based on data from Cooroy from
      1/1/1973- 31/12/1983 with six (6) minute rainfall duration.
      Table 3-2 and Table 3-3 outline the adopted source node parameters from “MUSIC
      Modelling Guidelines” (Water By Design, 2010) that were used in the MUSIC model.
      The site density of 10 dwellings per hectare, with the source nodes being assigned
      percentage impervious values based on 10 dwellings per hectare




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                             | 10

Page 15

      Table 3-2: Urban land use (Split Source Nodes) - Pollutant Export Parameters

         Land Use           Parameter          Total Suspended              Total                  Total Nitrogen
                                                     Solids             Phosphorous                 (Log10 mg/L)
                                                 (Log10 mg/L)           (Log10 mg/L)
                                                 Storm       Base      Storm        Base         Storm      Base
                                                  Flow       Flow       Flow        Flow          Flow      Flow
          Ground              Mean                2.18        1.0      -0.47        -0.97         0.26      0.20
                          Std Deviation          0.39        0.34       0.31        0.31           0.23      0.20
           Road               Mean               2.43        1.0       -0.30        -0.97          0.26      0.20
                          Std Deviation          0.39        0.34       0.31        0.31           0.23      0.20
            Roof              Mean               1.30        N/A       -0.89        N/A            0.26      N/A
                          Std Deviation          0.39        N/A        0.31        N/A            0.23      N/A


      Table 3-3: MUSIC Runoff Generation Parameters

                            Parameter                                       Urban

                     Rainfall Threshold (mm)                                  1
                       Soil Capacity (mm)                                    500
                        Initial Storage (%)                                  10
                          Field Capacity                                     200
               Infiltration Capacity Coefficient a                           211
               Infiltration Capacity Coefficient b                            5
                        Initial Depth (mm)                                   50
                       Daily Recharge (%)                                    28
                        Daily Drainage (%)                                   27
                   Daily Deep Seepage Rate (%)                                0

      3.2.3. Catchment Areas

      The development site has been split into three catchments containing split source nodes
      (road, roof and ground) representing total developed area reporting to the bioretention
      basin. Table 3-4 outlines the catchment areas and imperviousness represented within the
      MUSIC model. The stormwater quality catchments are provided in Figure 3-1.
      Table 3-4: Catchment Areas

       Catchment                      Total Area         Road (ha)    Roof (ha)        Ground
                                         (ha)                                           (ha) /
       Catchment 1                       1.384             0.342            0.250          0.791
       Imperviousness (%)                                   60              100             15




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                           | 11

Page 16

      Figure 3-1: WSUD Catchment Locality Plan

      3.2.4. MUSIC Model Layout

      As the management of urban stormwater needs to take a holistic approach, specific
      management measures need to be implemented in series to form a treatment train. The
      correct utilisation of various devices within the treatment train is imperative to target the
      desired pollutants, from the gross solids to the fine colloidal partials. Figure 3-2 shows the
      MUSIC model layout for the development.




      Figure 3-2: MUSIC Model Layout




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                              | 12

Page 17

             Treatment Measures
      Runoff from the development will be treated through two bioretention basins or flow split to a
      number of devices. The potential locality of the treatment devices servicing the
      development is shown in Figure 3-1.

      3.3.1. Bioretention System




      Bioretention systems use ponding above a treatment surface to maximise the volume of
      runoff flowing through the filtration media. They typically convey flows above the design
      event through overflow pits or a weir. The treatment system operates by firstly filtering surface
      flows through surface vegetation and then percolating runoff through prescribed filtration
      media. This media provides treatment through fine filtration, extended detention and
      biological uptake of nutrients.
      As these systems take approximately 12-24hrs to drain, the maximum depth of pondage
      allowed to occur over the filter area has been limited to 300mm, with a minimum filter media
      depth of 500mm. Table 3-5 summarises the proposed design parameters for the main
      bioretention system for this development. As noted above this may be split into several
      devices on detailed design. It is to be noted that the Orthophosphate content of the filter
      media has been reduced to 30mg/kg in line with recent advice from Healthy Waterways.
      (http://healthywaterways.org/initiatives/waterbydesign/stormwater).
      Table 3-5: Bioretention Design Parameters

                                          Parameter                         Bioretention Basin
                                                                                    A

                               Extended Detention Depth (m)                       0.30
                                 Storage Surface Area (m2)                         120
                                   Filter Media Area (m2)                          120
                            Unlined Filter Media Perimeter (m)                    0.01
                        Saturated Hydraulic Conductivity (mm/hr)                   200
                                       Filter Depth (m)                            0.5
                            TN Content of Filter Media (mg/kg)                     400
                    Orthophosphate Content of Filter Media (mg/kg)                 30
                                  Exfiltration Rate (mm/hr)                        0.0




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                 | 13

Page 18

      3.3.2. Sediment Forebays

      To ensure that the deposition of coarse sediment on the filter media surface does not affect
      its function, bioretention systems should be designed with pre-treatment to limit the amount
      of coarse sediment reaching the filter media. The sediment forebay has been sized in
      accordance with the WaterByDesign’s Bioretention Technical Design Guideline. Table 3-6
      summarises the proposed design parameters for the proposed sediment forebay.
      Table 3-6: Sediment Forebay Design Parameters

                                          Parameter                          Bioretention Basin
                                                                                     A

                                     Site Catchment (ha)                           1.384
                                 Min Area of Forebay (m2)                           15
                                    Removal Efficiency (%)                          80



             Results
      MUSIC modelling of the proposed treatment train for the developable area of the
      development at 25 Pavilion Street, Pomona was performed to ensure the WQO’s were
      achieved. Table 3-7 presents the load-based outputs that are represented by this
      application. The results show the mitigated scenario, which achieves compliant load
      reductions set out within the NSC Planning Scheme.
      Table 3-7: MUSIC Results – Load Based Pollutant Outputs

        Pollutant       Unmitigated          Mitigated         Reduction         Target           Compliance
                          (kg/yr)             (kg/yr)         Achieved (%)     Reduction
            TSS              13.5               13.2                2.6           80%                 ✓
            TP              2740                 526                80.8          60%                 ✓

            TN               5.33               1.39                 74           45%                 ✓
            GP               27.9               13.7                 51           90%                 ✓




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                      | 14

Page 19

      4. CONSTRUCTION PHASE MANAGEMENT
             Erosion and Sediment Control
      The management of the site during the construction phase is an important step in ensuring
      water quality standards are achieved. Implementation of best practice Erosion and
      Sediment Control techniques is imperative to managing the quality of runoff affected by
      construction works.
      The following points provide general guidance on the management of stormwater during
      the construction phase. Detailed Erosion and Sediment Control Management Plans should
      be developed in conjunction with the Operational Works design prior to construction works
      commencing in accordance with the International Erosion Control Association (IECA) - “Best
      Practice Erosion and Sediment Control (BPESC) document” and overseen by a Certified
      Professional in Erosion and Sediment Control (CPESC) or Registered Professional Engineer
      Queensland (RPEQ).
          1. Establish a single stabilised entry/exit point for the site works;
          2. Construct a shake-down grid at the entrance to facilitate the removal of sediment from
             trucks leaving the site. The access road extending from the end of existing road or kerb
             to the grid should comprise a 150-200mm deep pad of 40mm crushed rock;
          3. Install sediment fences along the lower boundaries of the site;
          4. Construct one or more strategically placed sediment basins in the proposed drainage
             reserve and construct contour drains / bunds to direct disturbed runoff to the sediment
             basins;
          5. Install bins and/or wind-proof litter areas on-site to minimise the dispersion of gross
             pollutants;
          6. Maintain on site sufficient materials necessary for the emergency repair of all erosion
             control devices. This includes silt fences, clean crushed rock for reapplication to the
             entrance road and for replacement of rock within temporary drainage channels, and
             flocculants for settling sediment basins;
          7. Following each day’s construction works, ensure that any material on road surfaces is
             swept from the road, and not permitted to be washed down the gutters and piped
             drainage systems;
          8. Quality of pooled water within sediment basins are to be monitored prior to
             dewatering, sufficient time should be given to allow sediment to settle (possible with
             the assistance of a suitable flocculent if necessary) &/or filtering during pumping
             operations; and
          9. Final establishment of bioretention basin should not occur until full stabilisation of
             upstream catchment has occurred; preferably these should be temporarily turfed
             during the maintenance period while dwelling construction is occurring.
      It shall be the responsibility of the developer, through their principal contractor, to ensure that
      temporary sediment and erosion controls are installed and maintained correctly.




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                   | 15

Page 20

      5. ESTABLISHMENT AND OPERATIONAL PHASE
         MANAGEMENT
             Establishment
      Experience shows that the critical periods in the life of WSUD vegetated stormwater systems
      are the construction and establishment phases. The timing and approach to these systems
      must be carefully considered to ensure successful establishment and long-term performance.
      Bioretention systems are now common stormwater treatment devices for new urban
      developments in Queensland. Successful construction and allowing adequate time for the
      systems to establish is critical to their long-term performance and function. Construction of
      the system is also linked to having suitable bioretention designs in place to ensure, civil
      contractors have appropriate plans to construct to. Applying due care in the design and
      construction phase will ensure the function of the system whilst also keeping on-going
      maintenance to a minimum. It is highly recommended that the constructed activities be
      completed in accordance with the Construction and Establishment Guidelines: Swales,
      Bioretention Systems and Wetlands (Apr 2010). This will require a sacrificial turf layer to be
      installed to protect the filter media from the building phase.

             Operational
      It is not proposed for water quality monitoring of the bioretention system to be undertaken
      during the operational phase of its life. The “Maintaining Vegetated Asset” guideline
      highlights that water quality monitoring is not recommended to determine the performance
      of every vegetated stormwater asset, as it is a specialized field that is complex and costly. In
      line with this guideline the on-going monitoring of water quality from this device is not
      considered necessary considering the small size of the development.
      The bioretention system will be maintained by the NSC, who as the asset custodian, will be
      responsible for the on-going maintenance of the water quality device. Maintenance for the
      bioretention basin may involve the following:
          1. Scheduled inspections;
          2. Removal of noxious plants or weeds;
          3. Maintaining the desired vegetation;
          4. Repairing erosion;
          5. Unblocking inlets and outlets;
          6. Removing litter and debris;
          7. Managing algal or moss growth; and
          8. Maintaining the permeability of the filtration.
      Operations and maintenance should be conducted in accordance with the Maintaining
      Vegetated Stormwater Assets (Feb 2012) guideline.




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                | 16

Page 21

      6. CONCLUSION
      It can be seen from the results, presented in Table 3-7 that the treatment measures proposed
      for the development site achieve the performance criteria set by the NSC Planning Scheme
      (2020) and SPP (July 2017). Annual Load Reductions of Total Suspended Solids (TSS), Total
      Phosphorus, Total Nitrogen (TN) and Gross Pollutants (GP) between the Mitigated and
      Unmitigated Scenarios have been achieved.
      It has been demonstrated that non-worsening of peak flows has been achieved to the
      discharge point for events up to the 10% AEP event (refer Table 2-7). The results show that
      there is non-worsening for events up the 5% AEP, with a minor increase noted in the larger
      events. The intent of sizing the detention basin is to mitigate flows up to the 10% AEP storm
      event to ensure non-worsening of discharges into the downstream flow path. In larger
      events, flows from the site will start to sheet flow across the rear of the site to Cooroora Creek.
      As the discharge point for the site becomes inundated from Cooroora Creek flooding in the
      major storm event, it is considered that the very minor increases noted from the site become
      inconsequential as a result of downstream site being drowned out by creek flooding. The
      catchment size of Cooroora Creek reporting past the site is approximately 1,400 ha. The very
      minor increases in peak flows in the major event would be considered to not result in any
      quantifiable change to downstream flooding conditions.

      This plan demonstrates that effective treatment of stormwater at the proposed development
      can be achieved through the integration of Water Sensitive Urban Design (WSUD) principles.
      Through the incorporation of bioretention basins, the plan successfully demonstrates:

         Compliance with the requirements of the NSC Planning Scheme and SPPs Load Based
          Objectives;

         The end of line bioretention basin is appropriately sized for the proposed development and
          can be incorporated into the development; and

         Ecological sustainability in terms of the development’s impact upon receiving waters and
          the viability of the proposed site development.

         The development is located above the regional 1% AEP flood extent with 500mm
          freeboard recommended to future dwellings on the new allotments.

      We therefore request Council approval of the engineering components for the proposed
      development with reasonable and relevant conditions. Detailed design may result in
      changes to the proposed strategy; however, the design objectives will be maintained.




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                   | 17

Page 22

      7. REFERENCES
         Noosa Shire Council (NSC) Planning Scheme 2020;

         http://www.bom.gov.au/water/designRainfalls/revised-ifd (Bureau of Meteorology,
          Online Rainfall IFD Data System);

         State Planning Policy (Department of Infrastructure, Local Government and Planning,
          2017);

         Australian Rainfall and Runoff (Institute of Engineers Australia, 2019);

         Queensland Urban Drainage Manual – 4th Edition (Institute of Public Works Engineering
          Australasia, Queensland Division, 2017);

         MUSIC Modelling Guidelines Version 1.0 (Water by Design, 2010);

         Maintaining Vegetated Stormwater Assets (Water by Design, 2012); and

         Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands
          (Water by Design 2012).




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                         | 18

Page 23

APPENDICES


[OCR of page images]
APPENDICES

 

Page 24

   Reconfiguration of Lot Plan and
Concept Engineering Drawings


[OCR of page images]
Appendix A Reconfiguration of Lot Plan and
Concept Engineering Drawings

dD.

Page 25

                                                                                                      JNE Developments

                                                                                                    Proposed Subdivision of
                                                                                                    25 Pavilion Street Pomona
                                                                                                    RPD: Lot 21 on SP316902




           600                6
          1274m²            1028m²                   7
                                                   1001m²                   8
                                                                         1001m²              9
                                                                                           1069m²




                                              15m Wide
                                                            Road

 10
1.626ha
                     5
                   1002m²
                                       4
                                     1002m²          3
                                                   1002m²            2              1
                                                                   1002m²         1000m²




                                                                                                                     A3 1:750


                                                                                                    13010-PRO-11F


[OCR of page images]
 

   

£8.23

y Proposed
Bioretention
\ % ~ Basin =

600

10

This Plan is prepared for the owner for

not be used for any other purpose.

financial dealings involving the land.

 

lodgement with the relevant Council for an
application under the Planning Act and should

No reliance should be placed on this plan for

|

4
RP809059

10 oO

  
  
   
  
 
  

—_——

  
 

Possible
Subdivision
Layout

  

1.626ha
Building
Envelope
1270m? Zz
| ~~ Zz
— ll
re— eee —_
— ~85,9- — ~\ zr |
Proposed 3m Wide — “ st
EZ gem ent for
a water one we .
UNDO. ine
SES, to be extin quishes
|
| 4
) ) \ RP35077
\ Pomona Showground
x a
“O /
IMPORTANT NOTE:
/

 

 

THE AREAS AND DIMENSIONS SHOWN ON THIS PLAN ARE
APPROXIMATE ONLY AND ARE SUBJECT TO FINAL SURVEY
AND LOCAL AUTHORITY APPROVALS AND CONDITIONS.

 

 

Scale 1:750 — Lengths are in Metres.

20 30 40 50

      
       
 

20

SP316902

60

70 80

2

90

RP809059

a
RPB09059

6
RP809059

/
RP189023

W.

100

©:

110

E

 
 
  
 

 
  

JNE Developments

 

Proposed Subdivision of
25 Pavilion Street Pomona
RPD: Lot 21 on SP316902

 

GENERAL NOTES:

1. VISIBLE SERVICES ONLY HAVE BEEN LOCATED.
PRIOR TO ANY DEMOLITION, EXCAVATION OR CONSTRUCTION ON
THE SITE, THE RELEVANT AUTHORITY SHOULD BE CONTACTED
FOR POSSIBLE LOCATION OF FURTHER UNDERGROUND SERVICES
AND DETAILED LOCATION OF ALL SERVICES.

2. BOUNDARIES HAVE NOT BEEN SURVEYED OR REINSTATED

3. BOUNDARIES SHOWN ARE COMPILED FROM DCDB DATA.

4. CONTOUR INTERVAL SHOWN IS 0.5 METRE.

 

LEGEND
SEWER MANHOLE
SEWER MAIN
RISING MAIN
WATER MAIN

WATER HYDRANT
ELECTRICITY O/H
POWER POLE
COMMUNICATION CABLE

NOOSA PLAN 2020
LOW DENSITY RESIDENTIAL

 

 

 

   

      
  

 

 

 

 

ZONE
ee FLOODING AND INUNDATION
EXTENT
RIPARIAN BUFFER AREA
Te (EXTENT)
Revisions Surveyed | Drawn [thecked] Passed] Date
F[ Lor io & RD | - | ATIS 9708/21
e| tor 6 & 600 | — | IAJ|LS 6/08/21
D| Layout Rev. |CL/SM|_LS | MH 20/07/21
c| DIM Merge CL_| MH | MH 21/6/21
[e[ Bldg _Env./Basin [| — [Ls [07/06/21
IAL ORIGINAL PLAN. = LS }04/06/21]

 

 

 

 

 

 

 

 

>

LAND SURVEYING DYNAMICS

PO Box 6334, Maroochydore BC QLD 4558
10/| Newspaper Place, Maroochydore QLD 4558
Mobile: 0412 666 516

Email: [email protected]

Web: www.landsurveyingdynamics.com

Land Surveying Dynamics (LSD) Pty Ltd
ACN 154593 870

 

Signed
Cadastral Surveyor/Director

Date

 

Horiz. Datum MGA2020 Vert. Datum AHD

oriah
Origin RL

 

Locality: POMONA

 

Local Government: NOOSA SHIRE COUNCIL

 

Scale

 

 

SHEET 1 OF 1 A3 1:750
FILE 13010—PRO-10 Rev F.dwg [Date 9/08/21
DRAWING NUMBER REV.

 

 

D:\Dropbox\LSD\Wobs\Ccurrent\ 13010 UNE Developments Pty Lid — 25 Pavilion St Pomona\bata Survey\Drafting\Proposal\ 13010—-PRO-10 Rev F.dwg

 

 

13010-PRO-11 | F

 

Page 26

                                                                                                                                                                            A
                                                                                                                                                                                                                                                                                                                                                 EXISTING
                                                                                                                                                                            -
                                                                                                                                                                                                                                                                                                                                           SEWER MANHOLE
                                                                                                                                                                                                                                                                                                                                                TO REMAIN




                                                                                                                                                                                                                                                                                                                                                                                       1.0m HIGH RETAINING WALL
                                                                                                                                                                                                                                                                                                                     2.0m HIGH RETAINING WALL

                                                                                                                                                                                                                                                                                                                                                                                         9 ²
                                                                                                                                                                                                                                                                2.5m HIGH RETAINING WALL




                                                                                                                                                                                                                                                                          7 m²                                                    8 ²                                                1069m
                                                                                                                                                                                                         6                                                           1001                                                   1001m
                                                                                                                                  B
                                                                                                                                  -                                     600 ²                       1028m²
                                                                                                                                                                        1274m
                                                                                                                                                                                                                                                                                                                                                                                                                               1.5m WIDE FOOTPATH
                                                                                                                                                                                                                                      C O NT A S




                                                                                                                                                                                                                                                                                                                                                                                                                                    6m WIDE ROAD
                                                                                                                                                                                                                                         US E
                                                                                                                                                                                                                                             INU T
                                                                                                                                                                                                                                              D

                                                                                                                                                                                                                                                A T UR




                                                                                                                                                                                                                                                   O                                      1.5m WIDE FOOTPATH
                                                                                                                                                                                                                                                   I




                                                                                                                                                                                                                                                     N
                                                                                                                                                                                                                                                  NI O F
                                                                                                                                                                                                                                                    NG R O


                                                                                                          105m²                                                                                                        TURNING HEAD
                                                                                                                                                                                                                                                       HE A D
                                                                                                                                                                                                                                                         AD            6m WIDE ROAD



                                                                                                    1625                                                                                                                                                                                                                                                           EXISTING
                                                                                                                                                                                                                                                                                                                                                                   SEWER LINE
                                                                                                                                                                                                                                                                                                                                                                   TO REMAIN




                                                                                                                                                           Building
                                                                                                                                                                                                                                                                         1.5m HIGH RETAINING WALL                   1.5m HIGH RETAINING WALL



                                                                                                                                                                                                                                                                                                                                     2 m²                           1
                                                                                                                                                                                                           5 m²                                    4 m²                                  3 ²                                                                    1000m²
                                                                                                                                                           Envelop2e                                  1002                                 1002                                   1002m                                         1002
                                                                                                                                                            1101m                                                                                                                                                                                                                                  1.4m HIGH RETAINING WALL




                                                                                                                                                                                                            EXISTING                                                                                                                         EXISTING                            EXISTING
                                                                                                                                                                                        EASEMENT TO BE EXTINGUISHED                                                                                                                    SEWER MANHOLE                             SEWER LINE
                                                                                                                                                                                                                                                                              EXISTING                                                      TO REMAIN                            TO REMAIN
                                                                                                               PROPOSED 3m WIDE EASEMENT FOR OVERLAND FLOW PATH                                                                                           EASEMENT TO BE EXTINGUISHED




                                                                                                                                                                                                                                                                                                                                                        EXTENT & HEIGHT OF ALL RETAINING WALLS TO BE
J:\2021\21556SD2_25 Pavilion St, Pomona - Subdivision\4.CADD\#ACAD\21556 SK CIVIL.dwg




                                                                                                                                                                                                                                                                                                                                                        FINALISED DURING DESIGN PHASE / OP WORKS
                                                                                            LEGEND
                                                                                                         20.0                         DESIGN CONTOUR

                                                                                                                                      EARTHWORKS DEPTHS (0.25m INCREMENTS)
                                                                                                CUT              FILL

                                                                                        COPYRIGHT ©                                                                                     Associated Consultants           Client                                                                                                                      Drawn                Verified                  Project                                                                   Drawing Title                                                 Scale            Sheet Size
                                                                                                                                                                                                                                                                                                                                                     AR                   DR
                                                                                        This drawing is subject to
                                                                                        copyright in accordance with                                                                                                     JNE DEVELOPMENTS PTY                                                                                                                                                       25 PAVILION ST, POMONA                                                    PRELIMINARY DESIGN                                                    1:400      A1
                                                                                        the agreement between TOD                                                                                                                                                                                                                                    Designed             Verified
                                                                                        Consulting Pty Ltd (tc) and tc's                                                                                                 LTD                                                                                                                         AR                   DR                        RESIDENTIAL SUBDIVISION                                                   GENERAL ARRANGEMENT                                           Drawing Number
                                                                                        client. This drawing shall only
                                                                                        be used for this specific project.                                                                                                                                                                                                                           Approved             RPEQ No                   RP DESCRIPTION       LOT 21 SP316902                                                                                                            21556-SK101
                                                                                        This drawing shall not be used                                                                                                                                                                   Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190      D. REYNOLDS          9072                      LOCAL AUTHORITY      NOOSA SHIRE COUNCIL
                                                                                                                              B       09.08.21   FOR APPROVAL                    AR                                                                                                                                                                                                                 MCU APPROVAL         -                   HORIZ DATUM MGA 2020                             0     10     20     30    40     50      60   Sheet             Revision
                                                                                        for construction until marked as                                                                                                                                                                            PO Box 61, Noosaville, QLD 4566                  Signed
                                                                                                                              A       06.08.21   FOR INFORMATION ONLY            AR                                                                                                      [email protected]     www.todconsulting.com                                                      ROL APPROVAL         -                   VERT DATUM AHD
                                                                                        'Issued For Construction' in the
                                                                                        revision description.                Rev       Date      Revision Description           Drawn                                                                                                                    ABN 39 128 805 336                                                             09.08.21    OPW APPROVAL         -                   RL DATUM    (PSM112428) 98.616                       MEASUREMENT BAR - INCREMENTS IN mm                1 of 2        B

Page 27

                                                                                                                                                                                                                   PROPOSED BOUNDARY




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         EXISTING BOUNDARY
                                                                                                                                                                           LOT 10                                                                                                                                                                                                                                 LOT 600


                                                                                                                                                                                                                                                                                                               SEDIMENT
                                                                                                                                                                                                                                                                                                               FOREBAY
                                                                                                                                                                                                                                                                                                                                                                          Q100 (RL 86.17)                              TOP OF BASIN (RL 86.27)

                                                                                                                                                                                                                                                                                       1 ON                                                                               WEIR (RL 86.00)                                                                                                                              4
                                                                                                                                                                                                                                                                                              4                                                                                                                                      EDD (RL 85.30)                                                             1 ON
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      FILTER LEVEL (RL 85.00)                                                                    1O
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     NATURAL SURFACE                  N2

                                                                                                                                                                     NATURAL SURFACE



                                                                                                                                                                                                                                                                                                                                                                                     EXISTING DAM TO BE FILLED


                                                                                                                                                                                                                                                                                                                                                                                                                                  PROPOSED BASIN
                                                                                                                                                                                                                                                                                                                                                                                                                                  500mm FILTER MEDIA
                                                                                                                                                                                                                                                                                                                                                                                                                                  100mm TRANSITION LAYER
                                                                                                                                                                                                                                                                                                                                                                                                                                  300mm DRAINAGE LAYER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING DAM WATER SURFACE




                                                                                                                                                                                                                                                                                                                                                        SECTION                B
                                                                                                                                                                                                                                                                                                                                                         SCALE 1:100            -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      PRELIMINARY BASIN STORAGE VOLUMES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ELEVATION ABOVE EDD (mm)        STORAGE VOLUME ABOVE EDD (m3)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     100                                    26.067
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     200                                    55.253
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     300                                    87.655
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     400                                   123.373
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     500                                   162.505
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     600                                    205.15
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               700 (WEIR LEVEL)                            251.407
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      800                                  301.374
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               870 (Q100 LEVEL)                            338.612
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              970 (TOP OF BASIN)                           395.113
                                                                                                                                                                                               PROPOSED BOUNDARY




                                                                                                                                                                                                                                                                                                                                                                                              PROPOSED BOUNDARY




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                PROPOSED BOUNDARY
                                                                                                                                                                                                                                                                                                  LOT 600                                                                                                                                                                                  LOT 6




                                                                                                                                                                                                                                                             TOP OF BASIN (RL 86.27)                  Q100 (RL 86.17)
                                                                                                                                                                                                                                                         WEIR (RL 86.00)               1 ON                                                                       4
                                                                                                                                                                                                                                            4                                                 4       EDD (RL 85.30)                                       1 ON
                                                                                                                                                                                                                                       1 ON                                                                               FILTER LEVEL (RL 85.00)

                                                                                                                                                                                                                                                                                                                                                                                                          NATURAL SURFACE

                                                                                                                                          NATURAL SURFACE                      APPROX OUTLET (RL 83.95)

                                                                                                                                                                                                                                                                                 EXISTING DAM TO BE FILLED


                                                                                                                                                                                                                                                                                                                                            PROPOSED BASIN
                                                                                                                                                                                                                                                                                                                        BOTTOM OF PIT       500mm FILTER MEDIA
                                                                                                                                                                                SHAPE EARTH TO OUTLET
                                                                                                                                                                                                                                                                                                                        RL 84.10            100mm TRANSITION LAYER
                                                                                                                                                                                                                                                                                                                                            300mm DRAINAGE LAYER
                                                                                                                                                                                                                                                                                                                                                                               EXISTING DAM WATER SURFACE
J:\2021\21556SD2_25 Pavilion St, Pomona - Subdivision\4.CADD\#ACAD\21556 SK CIVIL.dwg




                                                                                                                                                                                                                                                                                                                                                        SECTION                A
                                                                                                                                                                                                                                                                                                                                                         SCALE 1:100            -
                                                                                               0       1       2       3      4      5m




                                                                                        COPYRIGHT ©                                                                                                    Associated Consultants                   Client                                                                                                                    Drawn                                   Verified                    Project                                                                Drawing Title                                                                                           Scale            Sheet Size
                                                                                                                                                                                                                                                                                                                                                                          AR                                      DR
                                                                                        This drawing is subject to
                                                                                        copyright in accordance with                                                                                                                            JNE DEVELOPMENTS PTY                                                                                                                                                                          25 PAVILION ST, POMONA                                                 PRELIMINARY DESIGN                                                                                              1:100      A1
                                                                                        the agreement between TOD                                                                                                                                                                                                                                                         Designed                                Verified
                                                                                        Consulting Pty Ltd (tc) and tc's                                                                                                                        LTD                                                                                                                       AR                                      DR                          RESIDENTIAL SUBDIVISION                                                CROSS SECTIONS                                                                                          Drawing Number
                                                                                        client. This drawing shall only
                                                                                        be used for this specific project.                                                                                                                                                                                                                                                Approved                                RPEQ No                     RP DESCRIPTION    LOT 21 SP316902                                                                                                                                                      21556-SK102
                                                                                        This drawing shall not be used                                                                                                                                                                                           Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190   D. REYNOLDS                             9072                        LOCAL AUTHORITY   NOOSA SHIRE COUNCIL
                                                                                                                              B    09.08.21   FOR APPROVAL                              AR                                                                                                                                                                                                                                                    MCU APPROVAL      -                   HORIZ DATUM MGA 2020                                0     10     20     30    40       50                       60                       Sheet             Revision
                                                                                        for construction until marked as                                                                                                                                                                                                    PO Box 61, Noosaville, QLD 4566               Signed
                                                                                                                              A    06.08.21   FOR INFORMATION ONLY                      AR                                                                                                                       [email protected]     www.todconsulting.com                                                                        ROL APPROVAL      -                   VERT DATUM AHD
                                                                                        'Issued For Construction' in the
                                                                                        revision description.                Rev    Date      Revision Description                     Drawn                                                                                                                                     ABN 39 128 805 336                                                                                09.08.21   OPW APPROVAL      -                   RL DATUM    (PSM112428) 98.616                          MEASUREMENT BAR - INCREMENTS IN mm                                                       2 of 2        B

Page 28

Rational Method and WBNM
Outlet


[OCR of page images]
Appendix B

Rational Method and WBNM
Outlet

dD.

Page 29

       RATIONAL METHOD SUMMARY & RAINFALL DATA
      Project   25 Pavilion Street, Pomona
      Project #

      2016 IFD BoM

      Latitude             -26.36
      Longitude            152.85


      Rainfall Intensity (mm/hr)

            DURATION                                        AVERAGE RECURRENCE INTERVAL (years)
        (hours) (minutes)                  1 yr            2 yr    5 yr   10 yr   20 yr    50 yr                  100 yr
         0.083     5                       112             127     171    201     230      267                     295
          0.1      6                       108             122     164    192     219      254                     280
         0.167     10                       92             104     140    164     186      214                     235
         0.25      15                       78              88     119    139     157      181                     199
         0.333     20                       68              77     104    121     137      158                     174
         0.417     25                       61              69     92     108     123      142                     156
          0.5      30                       55              62     84      98     111      129                     142
         0.75      45                      43.2            48.7    66      77      89      103                     114
           1       60                      36.1            40.7    55      65      75       88                      98
          1.5      90                      27.9            31.5   43.1     51      59       70                      78
           2      120                      23.2            26.3   36.1    43.0    49.8      59                      66
           3      180                      17.9            20.4   28.3    33.9    39.4     47.0                     53
          4.5     270                      13.9            15.9   22.4    26.9    31.5     37.7                    42.6
           6      360                      11.7            13.4   19.0    23.0    26.9     32.4                    36.7
           9      540                      9.13            10.6   15.2    18.5    21.8     26.3                    29.8
          12      720                      7.69            8.94   13.0    15.8    18.7     22.7                    25.9
          18      1080                     6.03            7.05   10.4    12.7    15.1     18.5                    21.1
          24      1440                     5.05            5.93   8.80    10.9    13.0     15.9                    18.2
          30      1800                     4.38            5.16   7.71    9.55    11.4     14.1                    16.2
          36      2160                     3.89            4.59   6.89    8.56    10.3     12.7                    14.7
          48      2880                     3.20            3.78   5.72    7.14    8.61     10.7                    12.4
          72      4320                     2.39            2.83   4.30    5.40    6.55     8.22                    9.60


      Catchment Data

      Details:      EXISTING

       Variable         Value             Units
         Area:          3.407               ha
          C10           0.66             fraction

                                                           17.4      Overland Flow190
                                                                                   - 120m
      Rational Method Summary                              2.60      channel      120

        Adopted Time of Concentration (tc)                 20.6      Minutes (or 0.34 hours)

                                                           AVERAGE RECURRENCE INTERVAL (years)
              Variable                     1 yr            2 yr   5 yr   10 yr   20 yr    50 yr                   100 yr
             Freq Factor                  0.80            0.85   0.95    1.00    1.05     1.15                     1.20
          Intensity (mm/hr)                 67             76     102    119      135     156                      172
          Discharge (m3/s)                0.336           0.403  0.608  0.745    0.886   1.120                    1.286




H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\Rational\Rational_Method_Pomona.xlsm            12/08/2021


[OCR of page images]
RATIONAL METHOD SUMMARY & RAINFALL DATA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project 25 Pavilion Street, Pomona
Project #
2016 IFD BoM
Latitude -26.36
Longitude 152.85
Rainfall Intensity (mm/hr
DURATION AVERAGE RECURRENCE INTERVAL (years)
(hours) | (minutes) 1 yr 2 yr 5 yr 10 yr 20 yr 50 yr 100 yr
0.083 5 112 127 171 201 230 267 295
0.1 6 108 122 164 192 219 254 280
0.167 10 92 104 140 164 186 214 235
0.25 15 78 88 119 139 157 181 199
0.333 20 68 77 104 121 137 158 174
0.417 25 61 69 92 108 123 142 156
0.5 30 55 62 84 98 111 129 142
0.75 45 43.2 48.7 66 77 89 103 114
1 60 36.1 40.7 55 65 75 88 98
1.5 90 27.9 31.5 43.1 51 59 70 78
2 120 23.2 26.3 36.1 43.0 49.8 59 66
3 180 17.9 20.4 28.3 33.9 39.4 47.0 53
4.5 270 13.9 15.9 22.4 26.9 31.5 37.7 42.6
6 360 11.7 13.4 19.0 23.0 26.9 32.4 36.7
9 540 9.13 10.6 15.2 18.5 21.8 26.3 29.8
12 720 7.69 8.94 13.0 15.8 18.7 22.7 25.9
18 1080 6.03 7.05 10.4 12.7 15.1 18.5 21.1
24 1440 5.05 5.93 8.80 10.9 13.0 15.9 18.2
30 1800 4.38 5.16 7.71 9.55 11.4 14.1 16.2
36 2160 3.89 4.59 6.89 8.56 10.3 12.7 14.7
48 2880 3.20 3.78 5.72 7.14 8.61 10.7 12.4
72 4320 2.39 2.83 4.30 5.40 6.55 8.22 9.60
Catchment Data
Details: EXISTING
Variable Value Units
Area: 3.407 ha
Cio 0.66 fraction
17.4 Overlandf 190
Rational Method Summary 2.60 channel 120
Adopted Time of Concentration (tc) __ 20.6 _ Minutes (or 0.34 hours)
AVERAGE RECURRENCE INTERVAL (years)
Variable T yr 2 yr 5 yr 10 yr 20 yr 50 yr 100 yr
Freq Factor 0.80 0.85 0.95 1.00 1.05 1.15 1.20
Intensity (mm/hr) 67 76 102 119 135 156 172
Discharge (m*/s) 0.336 0.403 0.608 0.745 0.886 1.120 1.286

 

 

 

 

 

 

 

 

 

 

H:\21\21-0166 25 Pavilion Street, Pomona -

SMP\Design\Water Resources\WBNM\Rational\Rational_Method_Pomona.xlsm

12/08/2021

Page 30

iWBNM Lite
                     Comment#1 25 Pavilion Street
                     Comment#2 Existing (E01)                                                                     IMPORT                                                        SAVE & RUN
                     Comment#3                                                                                   CLEAR_ALL                                                        BROWSE                      WBNM_Run: H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\002\wbnm2019_w64.exe
                                                                                                               RESULTS_ONLY                                                       BROWSE                   ARR2019 Gauge H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\002\PomonaIFD.csv
                                                                                                                                                                                                                                                                                       Note this must be in same location as runfile
       GENERAL_PARAMETERS                                 DEFAULTS                                                                                                                BROWSE                  ARR_Catchment: QLD_ARR_Datahub.txt                                                Note this must be in same location as runfile
             Lag Parameter (C)                       1.6                                                                                                                          BROWSE                     ARR_Patterns: QLD_ECnorth_Increments.csv                                       Note this must be in same location as runfile
              Stream Lag Factor                        1                                                                                                                                                      LAST_BUILD: H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\002\E01.wbn
           Calculation Timestep                        1 mins
                      Initial Loss                    10 mm
           Continuing Loss Rate                      2.4 mm/hr                                                     RAINGAUGE           TIPS           PomonaIFD


                     TOPOLOGY                                                                                         STORMS           TIPS                    ARR                  STRUCTURE
                         Subarea            Name         Connects_to     Area_ha        Imp_%                      Storm#            AEP (ARI)        Dura_mins                   Subarea                    IWL               D-Fact            Type             %Per to LS   %Imp to LS
                                1 Ex                    A01               0.138          50                                   1         1                10                                                                                                                                             HS
                                2 A01                   SINK              3.407          11                                   2         1                15                              WEIRS             Weir#1             Weir#2                     PIPES     Pipe#1       Pipe#2        Pipe#3      Elevation_m        Storage_m3
                                3                                                                                             3         1                20                       Diverts to Sub                                                 Diverts to Sub
                                4                                                                                             4         1                25                       Crest Elev [m]                                                     Invert [m]
                                5                                                                                             5         1                30                          Length [m]                                                     No. Barrels
                                6                                                                                             6         1                45                          Weir Coeff                                                       Ent. Type
                                7                                                                                             7         1                60                              D_Fact                                               Dia/(Width)[mm]
                                8                                                                                             8         1                90                          Directed to                                                  (Height)[mm]
                                9                                                                                             9         1                120                       Delay [mins]                                                    Disch-Factor
                               10                                                                                            10         1                180                                                                                        Directed to
                               11                                                                                            11         1                270                                                                                       Delay [mins]
                               12                                                                                            12         1                360
                                     SINK




                        RESULTS
                                             1                 2            3             4            5              6                  7                 8           9             10                       11                 12
Structure Averages                   1 AEP 10 mins      1 AEP 15 mins 1 AEP 20 mins 1 AEP 25 mins 1 AEP 30 mins
                                                                                                             1 AEP 45 mins        1 AEP 60 mins     1 AEP 90 mins 1 AEP 120 mins
                                                                                                                                                                             1 AEP 180 mins        1 AEP 270 mins            1 AEP 360 mins
                              Ex              0.0853           0.0835       0.0748        0.0763     0.0747             0.0685           0.0604           0.0524      0.048             0.0396                      0.0353      0.0377
                             A01              1.0645           1.2085       1.2249        1.2693     1.2749             1.1869           1.0935           1.0024      0.911             0.8549                       0.742      0.8441




Structure_averages
             Inflow Peak [m3/s]
           Outflow Peak [m3/s]
            Inflow Volume [m3]
           Max Vol Stored [m3]
            Max Water Elev [m]
ARR2019 Actual above mean
                            Ex                 0.087             0.084        0.075        0.079      0.075              0.074              0.061          0.055      0.048              0.041                       0.038       0.041
                           A01                 1.067              1.22        1.236        1.324      1.293               1.21              1.094          1.063      0.926              0.869                       0.772       0.852

Page 31

iWBNM Lite
                     Comment#1 25 Pavilion Street
                     Comment#2 Developed (D01)                                                                    IMPORT                                                        SAVE & RUN
                     Comment#3                                                                                   CLEAR_ALL                                                        BROWSE                      WBNM_Run: H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\002\wbnm2019_w64.exe
                                                                                                               RESULTS_ONLY                                                       BROWSE                   ARR2019 Gauge H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\002\PomonaIFD.csv
                                                                                                                                                                                                                                                                                       Note this must be in same location as runfile
       GENERAL_PARAMETERS                                 DEFAULTS                                                                                                                BROWSE                  ARR_Catchment: QLD_ARR_Datahub.txt                                                Note this must be in same location as runfile
             Lag Parameter (C)                       1.6                                                                                                                          BROWSE                     ARR_Patterns: QLD_ECnorth_Increments.csv                                       Note this must be in same location as runfile
              Stream Lag Factor                        1                                                                                                                                                      LAST_BUILD: H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\002\D01.wbn
           Calculation Timestep                        1 mins
                      Initial Loss                    10 mm
           Continuing Loss Rate                      2.4 mm/hr                                                     RAINGAUGE           TIPS           PomonaIFD


                     TOPOLOGY                                                                                         STORMS           TIPS                    ARR                  STRUCTURE
                         Subarea          Name           Connects_to     Area_ha        Imp_%                      Storm#            AEP (ARI)        Dura_mins                   Subarea                    IWL               D-Fact            Type             %Per to LS   %Imp to LS
                                1 Ex                    A01              0.138           50                                   1         1                10                                                                                                                                             HS
                                2 A01                   A02              2.077           50                                   2         1                15                              WEIRS             Weir#1             Weir#2                     PIPES     Pipe#1       Pipe#2        Pipe#3      Elevation_m        Storage_m3
                                3 A02                   SINK             1.3543           5                                   3         1                20                       Diverts to Sub                                                 Diverts to Sub
                                4                                                                                             4         1                25                       Crest Elev [m]                                                     Invert [m]
                                5                                                                                             5         1                30                          Length [m]                                                     No. Barrels
                                6                                                                                             6         1                45                          Weir Coeff                                                       Ent. Type
                                7                                                                                             7         1                60                              D_Fact                                               Dia/(Width)[mm]
                                8                                                                                             8         1                90                          Directed to                                                  (Height)[mm]
                                9                                                                                             9         1                120                       Delay [mins]                                                    Disch-Factor
                               10                                                                                            10         1                180                                                                                        Directed to
                               11                                                                                            11         1                270                                                                                       Delay [mins]
                               12                                                                                            12         1                360
                                  SINK




                        RESULTS
                                             1                 2            3             4            5              6                  7                 8           9             10                       11                 12
Structure Averages                   1 AEP 10 mins      1 AEP 15 mins 1 AEP 20 mins 1 AEP 25 mins 1 AEP 30 mins
                                                                                                             1 AEP 45 mins        1 AEP 60 mins     1 AEP 90 mins 1 AEP 120 mins
                                                                                                                                                                             1 AEP 180 mins        1 AEP 270 mins            1 AEP 360 mins
                              Ex              0.0853           0.0835       0.0748        0.0763     0.0747             0.0685           0.0604           0.0524      0.048             0.0396                      0.0353      0.0377
                             A01               1.038           1.0423       0.9784        1.0085     1.0057             0.9229           0.8182           0.7396     0.6697             0.5944                      0.5269      0.5788
                             A02              1.1618           1.3678       1.3779        1.4095      1.361             1.2862           1.1624           1.0737     0.9518             0.8984                      0.7834      0.8864




Structure_averages
             Inflow Peak [m3/s]
           Outflow Peak [m3/s]
            Inflow Volume [m3]
           Max Vol Stored [m3]
            Max Water Elev [m]
ARR2019 Actual above mean
                            Ex                 0.087             0.084        0.075        0.079      0.075              0.074              0.061          0.055      0.048              0.041                       0.038       0.041
                           A01                 1.041             1.053         0.98        1.037      1.048              1.006              0.822          0.756       0.69              0.617                       0.572        0.62
                           A02                 1.163             1.377        1.392        1.418      1.366              1.324               1.18          1.097      0.967              0.918                       0.852       0.932

Page 32

iWBNM Lite
                     Comment#1 25 Pavilion Street
                     Comment#2 Mitigated (M01)                                                                    IMPORT                                                        SAVE & RUN
                     Comment#3                                                                                   CLEAR_ALL                                                        BROWSE                      WBNM_Run: C:\TEST\Pav\wbnm2019_w64.exe
                                                                                                               RESULTS_ONLY                                                       BROWSE                   ARR2019 Gauge C:\TEST\Pav\PomonaIFD.csv                                          Note this must be in same location as runfile
       GENERAL_PARAMETERS                                 DEFAULTS                                                                                                                BROWSE                  ARR_Catchment: QLD_ARR_Datahub.txt                                                Note this must be in same location as runfile
             Lag Parameter (C)                       1.6                                   0.138                                                                                  BROWSE                     ARR_Patterns: QLD_ECnorth_Increments.csv                                       Note this must be in same location as runfile
              Stream Lag Factor                        1                                   0.095                                                                                                              LAST_BUILD: H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\002\M01.wbn
           Calculation Timestep                        1 mins                              0.047
                      Initial Loss                    10 mm                                    0
           Continuing Loss Rate                      2.4 mm/hr                                                     RAINGAUGE           TIPS           PomonaIFD


                     TOPOLOGY                                                                                         STORMS           TIPS                    ARR                  STRUCTURE
                         Subarea          Name           Connects_to     Area_ha        Imp_%                      Storm#            AEP (ARI)        Dura_mins                   Subarea                    IWL               D-Fact            Type             %Per to LS   %Imp to LS
                                1 Ex                    A1                0.138          50                                   1         1                10                          A1                       0                  1             OUTLET                                                   HS
                                2 A1                    A2                2.077          50                                   2         1                15                               WEIRS            Weir#1             Weir#2                     PIPES     Pipe#1       Pipe#2        Pipe#3      Elevation_m        Storage_m3
                                3 A2                    SINK              1.354           5                                   3         1                20                       Diverts to Sub             A2                                  Diverts to Sub      A2                                                0                  0
                                4                                                                                             4         1                25                       Crest Elev [m]            0.6                                      Invert [m]       0                                              0.1                 26
                                5                                                                                             5         1                30                          Length [m]               4                                     No. Barrels       1                                              0.2                 55
                                6                                                                                             6         1                45                          Weir Coeff             1.6                                       Ent. Type       1                                              0.3                 87
                                7                                                                                             7         1                60                              D_Fact               1                               Dia/(Width)[mm]        450                                             0.4                123
                                8                                                                                             8         1                90                          Directed to            TOP                                   (Height)[mm]                                                       0.5                162
                                9                                                                                             9         1                120                       Delay [mins]               0                                    Disch-Factor      1                                               0.6                205
                               10                                                                                            10         1                180                                                                                        Directed to     TOP                                              0.7                251
                               11                                                                                            11         1                270                                                                                       Delay [mins]      0                                               0.8                301
                               12                                                                                            12         1                360                                                                                                                                                        0.87                338
                                  SINK                                                                                                                                                                                                                                                                                 1                395




                        RESULTS
                                             1                 2            3             4            5              6                  7                 8           9             10                       11                 12
Structure Averages                   1 AEP 10 mins      1 AEP 15 mins 1 AEP 20 mins 1 AEP 25 mins 1 AEP 30 mins
                                                                                                             1 AEP 45 mins        1 AEP 60 mins     1 AEP 90 mins 1 AEP 120 mins
                                                                                                                                                                             1 AEP 180 mins        1 AEP 270 mins            1 AEP 360 mins
                               Ex             0.0853           0.0835       0.0748        0.0763     0.0747             0.0685           0.0604           0.0524      0.048               0.0396                    0.0353      0.0377
                               A1              0.773           0.9268       0.9171        0.9401     0.9017             0.8627           0.7671           0.6994     0.6216               0.5801                    0.5038      0.5646
                               A2             0.7441           1.0748       1.2335         1.315     1.2568              1.196           1.1035           1.0139     0.9108               0.8611                    0.7507       0.855




Structure_averages
             Inflow Peak [m3/s]                1.038           1.0423       0.9784        1.0085     1.0057             0.9229           0.8182           0.7396     0.6697               0.5944                    0.5269      0.5788
           Outflow Peak [m3/s]                 0.773           0.9268       0.9171        0.9401     0.9017             0.8627           0.7671           0.6994     0.6216               0.5801                    0.5038      0.5646
            Inflow Volume [m3]                   728            953.8       1130.9        1275.8     1399.5             1699.6           1934.4           2307.7     2627.8               3155.2                    3806.2      4366.6
           Max Vol Stored [m3]                 286.4            304.1        303.1         305.7      301.5              296.7            285.5            277.3      267.7                  261                     251.9       258.4
            Max Water Elev [m]                0.7705            0.806       0.8037        0.8088     0.8005             0.7906           0.7684           0.7527     0.7337               0.7193                    0.7012      0.7137
ARR2019 Actual above mean
                            Ex                 0.087             0.084        0.075        0.079      0.075              0.074              0.061          0.055      0.048                0.041                     0.038       0.041
                            A1                 0.774             0.929        0.923        0.986      0.908              0.873              0.777          0.703      0.653                0.601                      0.55       0.606
                            A2                 0.745             1.083        1.257        1.317      1.302              1.197              1.149          1.053      0.947                 0.87                     0.754       0.871


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

Comment#1]25 Pavilion Street
Comment#2| Mitigated (M01) IMPORT.
Comment#3}| CLEAR_ALL
RESULTS_ONLY
| DEFAULTS
Lag Parameter (C) 16 0.138
Stream Lag Factor| 1 0.095
Calculation Timestep 1|mins 0.047
Initial Loss 10]mm 0
Continuing Loss Rate| 2.4|mm/hr Hos

 

 

   
  
  
  

 

 

 

TIPS

 

PomonalFD

 

 

SAVE & RUN
BROWSE
BROWSE
BROWSE
BROWSE

 

 

 

 

 

 

 

WBNM_Run: C:\TEST\Pav\wbnm2019_w64.exe
‘ARR2019 Gauge C:\TEST\Pav\PomonalFD.csv Note this must be in same location as runfile
ARR_Catchment: QLD_ARR_Datahub.txt Note this must be in same location as runfile
ARR_Patterns: QLD_ECnorth_Increments.csv

LAST_BUILD: H:\21\21-0166 25 Pavilion Street, Pomona - SMP\Design\Water Resources\WBNM\002\M01.wbn

Note this must be in same location as runfile

 

Subarea

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subarea Connects_to Area_ha Storm# AEP (ARI) Durée IWL D-Fact Type %Per to LS %lmp to LS
1]Ex AL 0.138 1 1 10 AL 0 1 ‘OUTLET |
2/A1 A2 2.077 2 1 15 Weirf#1 Weir#2 Th Pipe#1. Pipe#2 Pipe#3 | Elevation_m Storage_m3
3]A2 1.354 3 1 20 Diverts to Sub AZ Diverts to Sub] AZ 0 0
4 4 1 25 Crest Elev [m] 0.6 Invert [m] 0 0.1 26
5 5 1 30 Length [m] 4 No. Barrels 1 0.2 55
6 6 1 45 Weir Coeff 16 Ent. Type 1 03 87
7 7 1 60 D_Fact 1 Dia/(Width)[mm]|___450 0.4 123
8 8 1 90 Directed to TOP (Height)[mm] 05 162
9 9 1 120 Delay [mins] 0 Disch-Factor 1 0.6 205)
10| 10 1 180 Directedto| TOP 07 251
1 1 1 270 Delay [mins] 0 08 301
12 2 1 360 0.87 338
SINK 1 395
1 2 3 4 5 6 7 8 9 10 11 12
Structure Averages 1 AEP 10 mins AEP 15 mins 1AEP 20 mins 1AEP 25 mins 1 AEP 30 mi1 AEP 45 mins 1AEP 60 mins 1AEP90 mins 1 AEP 120n1 AEP 180 mins 1 AEP 270 mins 1 AEP 360 mins
Ex 0.0853 0.0835 0.0748 0.0763 0.0747 0.0685 0.0604 0.0524 0.048 0.0396 0.0353 0.0377
AL 0.773 0.9268 0.9171 0.9401 0.9017 0.8627 0.7671 0.6994 0.6216 0.5801 0.5038 0.5646
A2 0.7441 1.0748 1.2335 1315 1.2568 1.196 1.1035 1.0139 0.9108 0.8611 0.7507 0.855
Structure_averages
Inflow Peak [m3/s] 1.038 1.0423 0.9784 1.0085 1.0057 0.9229 0.8182 0.7396 0.6697 0.5944 0.5269 0.5788
Outflow Peak [m3/s] 0.773 0.9268 0.9171 0.9401 0.9017 0.8627 0.7671 0.6994 0.6216 0.5801 0.5038 0.5646
Inflow Volume [m3] 728 953.8 1130.9 1275.8 1399.5 1699.6 1934.4 2307.7 2627.8 3155.2 3806.2 4366.6
Max Vol Stored [m3] 286.4 304.1 303.1 305.7 301.5 296.7 285.5 2773 267.7 261 251.9 258.4
Max Water Elev [m] 0.7705 0.806 0.8037 0.8088 0.8005 0.7906 0.7684 0.7527 0.7337 0.7193 0.7012 0.7137
ARR2019 Actual above mean
Ex 0.087 0.084 0.075 0.079 0.075 0.074 0.061 0.055 0.048 0.041 0.038 = 0.041
AL 0.774 0.929 0.923 0.986 0.908 0.873 0.777 0.703 0.653 0.601 0.55 0.606
A2 0.745 1.083 1.257 1317 1.302 1.197 1.149 1.053 0.947 0.87 0.754 0.871

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.