      The existing drainage capacity of Pavilion Street is approximately equivalent to the 10% AEP
      storm event, with flow greater than this overtopping the verge and entering the site. To
      account for this, the peak flow for SUB1-Ex was determined for the 10%, 5%, 2% and 1% AEP.
      The portion of flow greater than the 10% AEP was converted into a ratio, which was then
      applied to the catchment area as detailed below in Table 2-1. This ensured that flows from
      SUB1-Ex greater than the 10% AEP were routed through the site.
      Table 2-1: Summary of Existing Catchment Parameters

       Sub-catchment                          Area (ha)                       Imperviousness (%)
       SUB1                                      3.407                               11
       SUB1-Ex                                   0.287                               50
       SUB1-Ex (<10% AEP)                           0.0*                              -
       SUB1-Ex (5% AEP)                         0.047*                               50
       SUB1-Ex (2% AEP)                         0.095*                               50
       SUB1-Ex (1% AEP)                         0.138*                               50
      * area factored based on flow rate for events greater than 10% AEP

      The WBNM model has been run for events from 1 to 100-year ARI and for durations of 20
      minutes to 3 hours. A WBNM catchment lag factor of 1.6 was applied which is within the
      recommended range. An initial and continuing loss of 10mm and 2.4mm/hr has been
      applied refer to Rational Method Check). The resulting peak flows for the critical duration are
      provided in Table 2-2 for each event at the outlet reporting locations.
      Table 2-2: Existing Catchment Peak Flows

       Event AEP                63.2%        50%           20%       10%      5%          2%       1%

       SUB1 (m3/s)               0.34        0.42          0.64      0.80     0.95        1.12     1.27

      2.1.2. Rational Method Check

      Pre-development peak flows have been checked against peak flows determined using the
      Rational Method (RM) for SUB1, as shown in Table 2-3. A time of concentration of 20.6
      minutes was determined for SUB1 rational method. It can be seen there is less than ten
      percent difference across all assessed events, indicating that the WBNM model flows are
      suitable for use. Refer to Appendix B for a summary of rational method parameters used.
      Table 2-3: Comparison of WBNM and Rational Method Peak Flows

       Event AEP                   63.2%       50%          20%        10%     5%         2%       1%

       Rational (m3/s)              0.34       0.40         0.61       0.75   0.89        1.12     1.29
       WBNM (m3/s)                  0.34       0.42         0.64       0.80   0.95        1.12     1.27
       Difference (%)               2.3         3.0          4.4       6.3     6.3        0.1      -0.9




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                                 |5
Log in to download the original file

SWMP.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.