Council archive · source document
08/0022 - MCU - Detached House [As Published] · 132008.22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
CONTAMINATED LAND - REGISTERED LAND
2.5
Is any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under
Ye Protection Act 1994?
No
[] Yes
If yes, does one or more of the following apply?
e A Suitability statement has been given and a site management plan has been approved for the {_}No [_] Yes
proposed use of the land, and the proposed use involves only the following -
« _ the fit-out of a building on the land; or
e minor site excavation, including for example, post holes for open-sided non-habitable
structures
e = There is currently a notifiable activity on the land and the activity is continuing [J] No CJ Yes
e The proposed use is industrial and only involves minor site excavation (e.g. post holes for open- [}No [J Yes
sided non-habitable structures)
e The land is used for a mining activity or petroleum activity LJNo (] Yes
ff no to ail - (Complete Part N) This application requires assessment by the Environmental Protection Agency {EPA}. If EPA is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
{PA schedui’ J port © table Z in §
(P Raguiatior schedine 2. tabls 2 tem 22
CONTAMINATED LAND - NOTIFIABLE ACTIVITY
2.6
Is any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for
a notifiable activity?
No
(} Yes
If yes, does one or more of the following apply?
e A suitability statement, removing the land from the environmental management register, has [_]No [] Yes
been given under the Environmental Protection Act 7994 for the existing use, or if there is no
existing use, the last use, and the following both apply -
¢ no new notifiable activity has occurred on the jand since the suitability statement was
issued;
¢ the land is not otherwise contaminated by a hazardous contaminant
e A suitability statement has been given and a site management plan has been approved forthe [_]No [_] Yes
proposed use of the land, and the proposed use involves only the following -
¢ — the fit-out of a building on the land; or
e minor site excavation, including for example, post holes for open-sided non-habitable
structures
e The land is used for a mining activity or petroleum activity [JNo (1) Yes
If no to all - (Complete Part N) This application requires assessment by the Environmental protection Agency (EPA). if EPA is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0022 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.