Council archive · source document
08/0022 - MCU - Detached House [As Published] · 132008.22
USUAL CONDITIONS OF DEVELOPMENT APPROVAL 1. The Works must be commenced within 60 days from the approval date. 2. This approval remains valid for a period of six (6) months from the approval date. 3. All Contractors, tradespersons and invitees are to be advised of these conditions of approval. 4. All works must be undertaken between the hours of 7.00am and 6.00pm ona Monday to Saturday. 5. Noise is to be kept at a minimum where possible. 6. All rubbish associated must be collected and disposed of by the Applicant at ail times during performance of the works. 7. Prior to the commencement of site works the owner shall contact Frank Modrich of Starco Management 5440 3338, (0409 779 461 } to discuss access to and from the site and how their builder intends to minimise damage done to landscaping and irrigation on the Common Property. The owner will be responsible for replacement costs of damage done to landscaping, irrigation and street paving caused by construction of the residence on their lot. 8. Compliance with Development Control By-Laws, see attached extract. 9. Compliance with Policy Warning concerning construction vehicles and damage, see attached.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0022 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.