2021-04-12 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
MINUTES
General
Committee Meeting
Monday, 12 April 2021
10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 15 sections
Section 2
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
1 ATTENDANCE & APOLOGIES
COUNCILLORS
Cr Frank Wilkie (Chair)
Cr Karen Finzel
Cr Joe Jurisevic
Cr Amelia Lorentson
Cr Clare Stewart
Cr Brian Stockwell
Cr Tom Wegener
EXECUTIVE
B de Chastel, Chief Executive Officer
A Dow, Acting Director Environment and Sustainable Development (for report 1)
B O’Connor, Acting Director Infrastructure Services (for report 2)
The meeting commenced at 10.00am.
2 CONFIRMATION OF MINUTES
Committee Resolution
Moved: Cr Stewart
Seconded: Cr Lorentson
The Minutes of the General Committee Meeting held on 15 March 2021 be received and
confirmed.
Carried unanimously.
3 PRESENTATIONS
Nil.
4 DEPUTATIONS
Nil.
Page 2 of 16
Section 3
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
5 ITEMS REFERRED FROM COMMITTEES
1 MCU20/0128 – DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
FOR A RESIDENTIAL CARE FACILITY AT 32 VIEWLAND DRIVE, NOOSA HEADS
In accordance with Chapter 5B of the Local Government Act 2009, Cr Stewart provided the
following declaration to the meeting of a prescribed conflict of interest in this matter:
I, Cr Stewart, inform the meeting that I have a prescribed conflict of interest in this matter as the
applicant, Deluca Charitable Foundation Limited is building this facility for the benefit of
Youngcare and I am a Board Director of Youngcare. As a result of my conflict of interest, I will
now leave the meeting room while the matter is considered and voted on.
Committee Recommendation
Moved: Cr Jurisevic
Seconded: Cr Stockwell
That Council note the report by the Development Planner to the Planning &
Environment Committee Meeting dated 6 April 2021 regarding Application No.
MCU20/0128 for a Development Permit for Material Change of Use - Residential care
facility situated at Reservoir 32 Viewland Dr, Noosa Heads and:
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be
complied with prior to the use commencing, and then compliance
maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are
listed in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
DA-0031 5 3d Views prepared by Ellivo 29/01/2021
DA-0032 4 3d Views prepared by Ellivo 21/01/2021
DA-0033 4 3d Views prepared by Ellivo 21/01/2021
DA-0034 4 3d Views prepared by Ellivo 22/01/2021
DA-0035 4 3d Views prepared by Ellivo 21/01/2021
DA-0036 4 3d Views prepared by Ellivo 22/01/2021
DA-1000 16 Ground Floor Plan prepared by Ellivo 15/03/2021
DA-1001 11 Level 1 Floor Plan prepared by Ellivo 04/02/2021
DA-1002 10 Roof Plan prepared by Ellivo 04/02/2021
DA-1600 4 Area Plans prepared by Ellivo 21/01/2021
DA-2100 5 Building Elevations prepared by Ellivo as 21/01/2021
amended in red by Council
DA-2101 5 Building Elevations prepared by Ellivo as 21/01/2021
amended in red by Council
Page 3 of 16
Section 4
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
DA-3100 6 Building Sections prepared by Ellivo 21/01/2021
DA-3101 2 Building Sections prepared by Ellivo 21/01/2021
DA06 (Page - Noosa Youngcare Masterplan prepared 09/03/2021
11) by Form Landscape Architects
DA06 (Page - Tree Works Plan prepared by Form 09/03/2021
12) Landscape Architects as amended in red
by Council
DA06 (Page - Walls and Fences prepared by Form 09/03/2021
13) Landscape Architects as amended in red
by Council
Nature and Extent of Approved Use
3. Deliveries and any service related activities must not occur outside the
hours of:
a. 7am to 6pm Monday to Saturday
b. 9am to 5pm Sunday or any public holiday
4. The total number of residential beds established on the site, including the
approved on site overnight carer accommodation, must not exceed twenty
(20).
5. The total number of support workers residing on the premises at any one
time must not exceed two.
Currency Period
6. This development approval lapses if the use has not happened by the 15
April 2027, unless an application to extend the currency period is approved
by Council.
Performance Bond
7. Security in the form of a cash bond or trading bank guarantee to the sum
of $10,000 must be submitted to Council, to secure performance of all
conditions of this approval, prior to the issue of a Development Permit for
Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Street Identification
8. The street address of the development must be clearly visible and
discernible from the primary frontage of the site by the provision of a street
number and, where appropriate, the building name.
Water & Sewer Connections
9. An underground connection to reticulated water and sewerage must be
provided to the development in accordance with the standards and
requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
Plant and Equipment
10. All air conditioning units, generators or other plant and mechanical
equipment must be located at ground level and fully enclosed or screened
such that,
Page 4 of 16
Section 5
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
10.1. they are not visible from the street frontage or adjoining properties;
and
10.2. the screening enclosure minimises noise impacts to within
acceptable levels at the boundary of the site.
11. All external plant and equipment must be sited away from neighbouring
residential premises.
Building Appearance
12. All deck and balcony areas above ground floor must not be enclosed by
permanent fixtures such as shutters, louvres, glass panelling or the, except
where required to satisfy any privacy condition of this Decision Notice.
13. The building must be finished using a mixture of colours textures and
materials using a muted, natural colour palette that complements the
natural surroundings of the site.
Fencing and Walls
14. Any street fencing must be set back an average of 1 metre from the front
property boundary. Any fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
15. The area of land between the fence and the front property boundary must
be densely landscaped to screen any fencing from the street.
16. The 2m landscape zone between the building footprint and the side and
rear boundaries must not be filled and must be landscaped to provide a
visual buffer and transition to adjoining properties.
Landscaping Works
17. The development site must be landscaped. The works must be undertaken
in accordance with an Operational Works approval and the Noosa Plan for
that specific area and must include in particular:
a. the works shown on the Approved Plans
b. provision of 1 street tree within the road reserve for every 8 metres
of road frontage
18. All landscape works must be established and maintained in accordance
with the approved design for the life of the development, and in a manner
that ensures healthy, sustained and vigorous plant growth. All plant
material must be allowed to grow to full form and be refurbished when its
life expectancy is reached.
19. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
Tree Retention
20. Existing trees on site must be retained generally in accordance with the
Tree Solutions referenced document, Arboricultural Report, 32 Viewland
Drive prepared by Brandan Martin Director/ Principal Consulting Arborist
dated December 5, 2020.
21. Provide to Council prior to or with an Operational Works Application an
amended Tree Works Plan that accords with the referenced Arboricultural
Report in Condition 20, and including additional trees identified as suitable
for retention in consultation with the consulting arborist, Council’s
Environment Officer and in accordance with the referenced report.
Page 5 of 16
Section 6
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Clothes Drying Areas
22. Outdoor clothes drying areas must be screened from public view.
Protection of Privacy
23. To ensure privacy is protected between adjoining properties, the windows
located on the western and southern building faces must:
a. have a minimum window sill height or 1.5 metres above floor level;
or
b. be fitted with translucent glazing; or
c. be fitted with a fixed external screen.
24. The upper level balconies located on the southern facade of the apartment
building must include either balcony planter boxes, balustrading or fixed
external privacy screens, positioned in such a way to obscure direct views
into the habitable room windows or private open space areas of the
adjoining property.
Communal Recreation Area/s
25. Communal recreation area/s must be provided as shown on the approved
plans.
Safety and Security
26. All external lighting at entrances, pathways, emergency exits and other
external locations must not result in light shed beyond the boundaries of
the site and design and/or screened where necessary to prevent glare and
light disturbance to neighbouring properties.
27. Individual unit numbers must be clearly signed.
28. All pathways and land used for outdoor recreation must have grades not
exceeding 1 in 20, with paths having hard, slip resistant surfaces.
Site Access and Driveways
29. A sealed access driveway must be provided from Viewland Drive to all
parking and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. a driveway crossover generally in accordance with Council Standard
Drawing RS-051
b. suitable safety measures to improve driver awareness of pedestrians
and enhance pedestrian safety.
Car Parking
30. A minimum of six (6) car parking spaces must be provided and marked on
the site and made available and accessible at all times. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. 3 visitor parking spaces within the total, which are clearly marked for
that purpose and accessible at all times for visitor use
b. 2 staff parking spaces within the total, which are clearly marked for
that purpose
c. 1 disabled parking space/s within the total
d. 1 emergency vehicle bay within the total
Page 6 of 16
Section 7
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
e. dimensions, crossfalls and gradients in accordance with Australian
Standards AS/NZS2890.1:2004 and AS/NZS2890.6:2009
31. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition
at all times.
32. Directional signage must be provided to direct visitors to the car parking
spaces provided on site.
Stormwater Drainage
33. The site must be provided with a stormwater drainage system connecting
to a lawful point of discharge. The works must be undertaken in
accordance with an Operational Works approval and be generally in
accordance with drawing number Q20-004-C01 Revision F titled
Stormwater Drainage Layout Plan prepared by Neil McKenzie and
Associates Pty Ltd dated 11 March 2021. The operational works application
must include but not be limited to:
a. Certification from the Geotechnical Engineer that supports the design
and makes specific comment regarding the proposed on-site
infiltration system and the swale drain
b. Certification that states that if the works are carried out in accordance
with the design plans the development of the site will not create a
stormwater worsening on the adjoining downstream properties
This condition is imposed pursuant to s145 of the Planning Act 2016 being
non-trunk infrastructure.
Services
34. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary
conduits, pits and pipes to accommodate the future connection of optic fibre
technology telecommunications.
35. Certification must be submitted to Council from all relevant service
providers (Energex, NBN and Unitywater) which certifies that the
development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
36. Unless otherwise agreed in writing by the relevant service provider, any
public or third party infrastructure located on the subject site must be placed
within an easement registered against the title of the property.
37. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance with
the Grantee’s standard easement terms. Draft easement documentation
must be submitted to Council for endorsement.
38. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
39. All works must be carried out generally in accordance with the
recommendations contained in the Report on Geotechnical Investigation –
Project Number 95141.00 prepared by Douglas Partners dated January
2021 with the following additions:
Page 7 of 16
Section 8
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
a. The report must be amended to include specific reference to the
proposed on-site infiltration system and the proposed swale drain;
b. Certification that states that if the works are carried out in accordance
with the report the development of the site will not:
a. adversely impact on the stability of the subject site or
b. adversely impact on the stability of any adjoining land and/or
structure erected on the adjoining land
The report incorporating the above amendments must be resubmitted to
Council as part of any subsequent Development Permit for Operational
Works*.
*(Refer to Advisory Note)
40. Prior to the commencement of the use certification must be submitted to
Council from a qualified person* which certifies that the development has
been constructed in accordance with the approved Geotechnical Report for
the development and that the development will remain stable in the long
term.
*(Refer to advisory Note)
Earthworks and Retaining Walls
41. All earthworks must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
42. All earthworks and associated retaining structures/batters/anchors must be
contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
43. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber
surface levels must be adjusted to provide a freeboard of 100mm above
the finished ground surface level.
44. All retaining walls must be designed and constructed in accordance with
the planning scheme and must be certified by an RPEQ where exceeding
1.0m in height. All retaining walls that are publicly accessible and exceed
1.0m in height must be fitted with a commercial grade safety fence.
Damage to Services and Assets
45. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle
safety, immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority
for approval.
Page 8 of 16
Section 9
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Stormwater Quality
46. The development must include a stormwater quality treatment system
designed to achieve 80% reduction in Total Suspended Solids, 60%
reduction in Total Phosphorous, and 45% reduction in Total Nitrogen
compared to an unmitigated scenario, prior to discharge from the site.
47. The stormwater quality treatment system must be in accordance with an
Operational Works approval for stormwater drainage and, the Queensland
Urban Drainage Manual. The application for Operational Works Approval
must demonstrate that:
47.1. all runoff can be filtered via vegetated areas prior to discharge from
the site.
47.2. pollutant reduction predicted for the stormwater quality treatment
train is designed in accordance with the Water by Design MUSIC
modelling guidelines (Version 1) 2010.
47.3. Detail design plans for the stormwater treatment train, and submitted
for the Operational Works approval, demonstrate the size of water
quality improvement features are consistent with the MUSIC model,
and are visually integrated into the development in accordance with
the Water by Design Bio-retention Technical Design guidelines
(Version 1.1) October 2014.
47.4. Any necessary retaining walls within bio retention basins must not
exceed 0.8m in height. The operational works approval application
must detail proposed rock finishing on any retaining walls, and these
approved finishes shall be maintained for the life of the development.
Raw finished concrete block retaining walls will not be approved.
47.5. The application for operational works approval must include the
design for educational signage to be included within/alongside the
bio-retention basin. Signage must follow a green and white colour
pallet and state “This bio retention basin cleans stormwater runoff
prior to its discharge to The Noosa River”.
47.6. Stormwater detention must be included in the stormwater treatment
train design, and maintained to facilitate for stormwater flows
discharging from the development to be consistent with pre-
development characteristics.
47.7. Stormwater discharges are provided with a free draining outlet and
connect to a lawful point of discharge in accordance with PSP6
Engineering Design Standards - Roads, drainage and earthworks
48. All stormwater quality treatment devices must be maintained in accordance
with the Water by Design (2012) - Maintaining Vegetated Stormwater
Assets (Version 1). A copy of this document must be retained on the site
together with the approved Operational Works drawings for the stormwater
quality treatment system and a detailed life cycle costing of the system
attached as an addendum. Records of all maintenance activities
undertaken must be kept and made available to Council upon request.
49. Any proposed Community Management Statement required for the
development must include the Water by Design (2012) – Maintaining
Vegetated Stormwater Assets (Version 1) document and must include the
full cost of maintaining the system in accordance with that document.
Page 9 of 16
Section 10
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Construction Traffic Management Plan
50. A Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase
including:
i. a Traffic Management Control Plan in accordance with the
Manual of Uniform Traffic Control Devices (MUTCD) detailing
all temporary signage and traffic control measures prior to
construction
ii. maintenance of safe pedestrian access for the areas affected
by the works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of
the development
iv. approval of the Traffic Management Control Plan by the
Department of Transport and Main Roads (DTMR) for any
works on State controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage
lines through the construction site, through the implementation of
appropriate erosion and sediment control measures
c. works programme identifying key components of the works and their
respective durations
d. establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to
advise of agreed construction times, impacts on traffic, services and
other relevant issues.
e. Include a post out to the local residents and businesses advising of
the proposed development, the expected time frames and the site
contact details.
f. Include signage in prominent locations on the boundaries of the site
advising of the proposed development, the expected time frames and
the site contact details.
g. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
h. details on the location of external fill sites/sources, the haulage route,
type of vehicle to be utilised during filling operations and frequency
of usage. NB any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense
B. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
C. Request the Chief Executive Officer to investigate the existing traffic and car
parking concerns in Viewland Drive, Noosa Heads raised by residents in their
submissions to Application No. MCU20/0128 for a Residential Care Facility at 32
Viewland Drive, Noosa Heads.
Carried unanimously.
Cr Stewart re-joined the meeting.
Page 10 of 16
Section 11
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
2 PARK ROAD TEMPORARY PATH UPGRADE FURTHER INFORMATION
The following material was presented to the meeting in relation to this item:
Cr Wegener – map and images - refer to Attachment 1
In accordance with Chapter 5B of the Local Government Act 2009, Cr Lorentson provided the
following declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Lorentson, inform the meeting that I have a declarable conflict of interest in this matter due
to my relationship with Andrew and Cathryn St Baker who reside in Park Road adjacent to
where the pathway is located. My family have holidayed once with Andrew and Cathryn St
Baker, my husband is close personal friends with Andrew St Baker and one of my election signs
was located at Thomas Surfboards and Andrew St Baker is a joint owner of that business. As
a result of my conflict of interest I will now leave the meeting room while the matter is considered
and voted on.
In accordance with Chapter 5B of the Local Government Act 2009, Cr Wegener provided the
following declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Wegener inform the meeting that I have a declarable conflict of interest in this matter due
to my association with Andrew St Baker who owns a property in Park Road, adjacent to the
where the pathway is located. Andrew St Baker contacted me in May 2020 about the pathway
in question which runs on the northern edge of his property. I went to meet with him and looked
at the path and he told me the history of his dealings with Council. I contacted the Project
Officer and passed on Mr. St Baker’s concerns. Later, I informally met the Project Officer on
the boardwalk and, I believe, he told me that it will eventually come before Council. I have a
perceived association with Mr. St Baker as I am a surfboard manufacturer and he is an owner
of Thomas Surfboards and the Thomas Factory. I believe Mr. St Baker has had a fantastic
influence on manufacturing in Noosa. In Council I have often congratulated the Thomas Factory
and I have discussed the emerging Enterprise Business Zones which Mr. St Baker supports.
During the election campaign Mr. St Baker allowed me to put an election core flute at the
Thomas Surfboard Factory. I occasionally meet Mr. St Baker in the surf and have had two
discussions on the Noosa Biosphere, the history of Noosa and the Bring Back the Fish
campaign at his house, which is, obviously, right above the surf break. Although I have a
declarable conflict of interest, I do not believe a reasonable person could have a perception of
bias because I believe I do not have a close personal relationship with Mr St Baker. Therefore,
I will choose to remain in the meeting room. However, I will respect the decision of the meeting
on whether I can remain in and participate in the decision.
Committee Resolution
Moved: Cr Stockwell
Seconded: Cr Stewart
That Council note the declarable conflict of interest by Cr Wegener and determine that it is in
the public interest that Cr Wegener participates and votes on this matter because Council
believes that Cr Wegener does not have a close personal relationship with Mr St Baker and
therefore a reasonable person would trust that the final decision is made in the public interest.
Carried unanimously.
(Cr Wegener did not vote on the above motion)
Page 11 of 16
Section 12
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That Council note the report by the Special Projects Coordinator to the Services &
Organisation Committee Meeting dated 6 April 2021, providing further design
information and approve an upgrade to the temporary path constructed as part of the
previously completed Park Road Boardwalk project to a permanent pathway, with
funding to be sourced when available at a future budget review.
For: Crs. Stockwell, Wilkie and Jurisevic
Against: Crs. Wegener, Finzel and Stewart
Carried on the casting vote of the Chair.
Cr Lorentson re-joined the meeting.
The meeting adjourned at 11.40am.
The meeting resumed at 11.47am.
6 REPORTS DIRECT TO GENERAL COMMITTEE
3 PROPOSED LEASE - SHOP 8, SUNRISE BEACH SHOPPING CENTRE
In accordance with Chapter 5B of the Local Government Act 2009, Cr Lorentson provided the
following declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Lorentson, inform the meeting that I have a declarable conflict of interest in this matter as
my children are both casual employees at Café Le Monde and El Capitano which I believe are
also owned or part owned by the Director of Tanglewood Company Pty Ltd, Ryan Taylor. In
addition, during the 2020 election campaign I had election material on display at Café Le Monde.
Although I have a declarable conflict of interest, I do not believe a reasonable person could
have a perception of bias because I believe I do not have a close personal relationship with Mr
Taylor. Therefore, I will choose to remain in the meeting room. However, I will respect the
decision of the meeting on whether I can remain and participate in the decision.
Committee Resolution
Moved: Cr Wilkie
Seconded: Cr Stewart
That Council note the declarable conflict of interest by Cr Lorentson and determine that it is in
the public interest that Cr Lorentson participates and votes on this matter because Council
believes that Cr Lorentson does not have a close personal relationship with Mr Taylor and
therefore a reasonable person would trust that the final decision is made in the public interest.
Carried unanimously.
(Cr Lorentson did not vote on the above motion)
Page 12 of 16
Section 13
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Committee Recommendation
Moved: Cr Stewart
Seconded: Cr Wilkie
That Council note the report by the Property Advisor – Commercial Property to the
General Committee Meeting dated 12 April 2021 regarding the lease of Shop 8,
Sunrise Neighbourhood Shopping Centre and:
A. Agree to enter a commercial lease of the premises to Tanglewood Company Pty
Ltd, for a five (5) year term, as generally outlined in the report;
B. Agree to an initial rent-free period of 6 months; and
C. Authorise the CEO to award up to 4 subsequent lease extensions each of 5
years, subject to the lessee complying with the terms of the lease.
Carried unanimously.
4 BUDGET REVIEW 3 (BR3) FOR THE 2020/21 FINANCIAL YEAR
Committee Recommendation
Moved: Cr Jurisevic
Seconded: Cr Lorentson
That Council note the report by the Manager Financial Services to the General
Committee Meeting dated 12 April 2021 and approve the proposed changes to the
budget for the 2020/21 financial year as outlined in the revised Budget Financial
Statements attached to the report.
Carried unanimously.
5 FINANCIAL PERFORMANCE REPORT – MARCH 2021
Committee Recommendation
Moved: Cr Jurisevic
Seconded: Cr Stockwell
That Council note the report by the Manager Financial Services to the General
Committee Meeting dated 12 April 2021 outlining March 2021 year to date financial
performance against budget, including performance against key financial sustainability
indicators.
Carried unanimously.
7 CLOSED SESSION
Nil.
The meeting closed at 12.30 pm.
Page 13 of 16
Section 14
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
ATTACHMENT 1
Page 14 of 16
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
ATTACHMENT 1
aerate s wate sa + BS San? 3 ge
aa go € mf . M 4 ee thes pao A 9 a ; Bi la
ae, | : |
a Z2=—=~
7%. 2? 2 hyp Se
(Shut NG panies eile (3, ‘I
n m fis Bon eow aiid RAL, ie -
_ Rrec|ess FOINTS
e q ZOE A, pt - ld
My FAY y%
aay NYY Se)
=O ae ~ J
a7r_ ee J ae “ he
=a— = fol pedesviars « E ap
VY must cross rod g
ld Se at Oe
p _ @. Sg
) | ge,
3 a ze ie PeDEsTRUAS USE ON 2uxAYy
fh 23) ae Section OF MITT — THe.
\ ; ER CHoost ¢itH2¢g SDS oF
A
\ Pe Traffic Route
GOD posstRVW At
VEq—Ne TH
SUED pee Foot PATH. em Heavy VES
Page 14 of 16Section 15
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Page 15 of 16
91 40 Gg} abe
te ps S77
J pd e
ee . ef
ey — ~ ea
| 4 7 _ bs rg
is * . \ an be ne - a
Serie cee = Xt SS SS ae aa as Ae ee
< aN = ee Bose ed 3
en — Sy Naren A aR Ve
a a = i DARA SS Wey ety) ss
a, Vi A Uf LAV re
eae aa 5 ee ts ce a
.y eed en | i ss ey Dor % ~
Fe | = Ye Re Bore
Pe [Th pn eS \
a == Ses
. s, i | _ \
E <—os = — t aor E
= x = <a fn Sek P bd 4
ae uy age = Se
E - 4 a. — ee — sh A ‘5
. = Peng Pe ie Zz =. So a a
~< i —— ; F 4a”) ao ; egy at i
(JST fe Me | i eee ey |
Soa c y aoe é vA os Dee: ' ee. ra + +
z ; ; ee: \ } eee oy 1 Bs gia? aN ‘N W i \ \ Ps ’ ha wate’ Bb
‘ : d ie Pie Mie een ee <s 4 ‘\ 4 bY, kone as . Ey <7 SoS Sem \
iB See Be ube oe , era ‘KA NN ee Pa he Ay
sige Ee ma: ae hae Ne ee oe Bd , MN MOS VBS Oy
ef i, ee tea a ee be. a See RES ODOC
Fg Ae ae ih Pg a) ta) k Gere ey ii : a \ \ \ : a \
: mama EEG , ae eA OS we eB AN
FOO I eee eS He Vath i etek Sage ' ee i ad
i at te eee MN Paes. AVS Th ae = tt 3g ee
go A ie a nt :
ge Beers Ma s hs 4 oe ee mn ee eae Ric) \ ec : = ~~ ae “> v1
et) Se Neier ee) ete \ a. AN I mT
SR ER LK NOR i ne Mpet® \ 4 PPR:
ae
= < : & ve
a a ie iy f
| — \D be } !
i — meen, Oh \ Ses
— SS emer NN P z Fen = 'N
> —) a SS
ee oo ON
—<—-— Ate Ere Orne Ws >
he eT” Ft | Tees , SS
j se gi an Pe ae tl to j
rt =~ —— TENT dec tes ENS ee} al ci a
eT aS am iit Poe ant Si sitet 3 \ ee : ; :
f Ly ~ ae 7 c pf Lu See Paes Dees. .
bs We’ ae . H Pe ee = 2 “iy : Sou = a
+ + * a: 7) a ys a Sr a oh “ OF ; : 4 - ecan
. ’ Pee ye wh 1 | 9 a phe tae ee et cs ; ee e i Ss .
g lee Pe, we bi SS Pai a ty ee ee : ark ee : so ‘ ee
Ree rater tae '\ \\ Cea ia Disa ee marsh LN a a Sota
Piaf i Ww LD ma ee Ore 4 pe ce #e oa ’ 3
L202 WudV cL SALNNIW ONILAAW 3SLLINNOD 1VWYANADSection 16
GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
Page 16 of 16
s ©
oS —
N °o
=_l
ia F, ©
g :
R §
p :
.
’
st
5 1 1 1 12 2 698 1133 27 53 34 7
5 1 1 1 12 3 903 1158 31 17 0 v
4 1 1 1 13 0 321 1173 99 38 -1
5 1 1 1 13 1 321 1173 99 38 9 ai>|>
4 1 1 1 14 0 328 1189 718 78 -1
5 1 1 1 14 1 328 1208 31 21 32 ae
5 1 1 1 14 2 415 1220 49 12 28 ae
5 1 1 1 14 3 703 1198 9 30 16 .
5 1 1 1 14 4 791 1189 21 70 23 {
5 1 1 1 14 5 960 1225 18 37 44 i,
5 1 1 1 14 6 1036 1215 10 52 7 ;
4 1 1 1 15 0 948 1258 15 16 -1
5 1 1 1 15 1 948 1258 15 16 0 _
4 1 1 1 16 0 155 1240 881 96 -1
5 1 1 1 16 1 213 1259 1 55 46 |
5 1 1 1 16 2 315 1283 65 41 38 ee
5 1 1 1 16 3 913 1240 64 96 0 \
4 1 1 1 17 0 155 1318 798 58 -1
5 1 1 1 17 1 155 1318 35 58 90 5
5 1 1 1 17 2 320 1331 58 38 22 oo
5 1 1 1 17 3 785 1343 2 2 39 7
5 1 1 1 17 4 813 1325 5 22 84 |
5 1 1 1 17 5 949 1343 4 23 7 :
4 1 1 1 18 0 155 1372 241 55 -1
5 1 1 1 18 1 155 1381 34 41 74 z
5 1 1 1 18 2 327 1372 69 55 11 oy
4 1 1 1 19 0 155 1426 222 49 -1
5 1 1 1 19 1 155 1427 34 33 96 =
5 1 1 1 19 2 318 1426 166 49 49 TE?
4 1 1 1 20 0 155 1475 193 35 -1
5 1 1 1 20 1 155 1479 35 31 85 5
5 1 1 1 20 2 336 1475 12 3 29 |
4 1 1 1 21 0 155 1514 34 41 -1
5 1 1 1 21 1 155 1514 34 41 67 z
4 1 1 1 22 0 155 1558 34 27 -1
5 1 1 1 22 1 155 1558 34 27 28 Ee
4 1 1 1 23 0 151 1583 32 64 -1
5 1 1 1 23 1 151 1583 32 64 18 Mu
4 1 1 1 24 0 161 1630 849 64 -1
5 1 1 1 24 1 161 1630 17 63 53 Ss
5 1 1 1 24 2 725 1635 63 43 3 or
5 1 1 1 24 3 788 1631 11 63 0 ,
5 1 1 1 24 4 999 1639 11 44 0 ’
4 1 1 1 25 0 155 1692 212 33 -1
5 1 1 1 25 1 155 1700 34 25 93 =
4 1 1 1 26 0 151 1726 877 37 -1
5 1 1 1 26 1 151 1726 28 37 48 uu
5 1 1 1 26 2 636 1743 5 4 0 ,
5 1 1 1 26 3 1026 1744 2 9 0 :
4 1 1 1 27 0 155 1760 689 67 -1
5 1 1 1 27 1 155 1760 34 65 46 E
5 1 1 1 27 2 603 1789 3 6 0 :
5 1 1 1 27 3 836 1814 8 13 0 :
4 1 1 1 28 0 155 1830 34 33 -1
5 1 1 1 28 1 155 1830 34 33 91 =
4 1 1 1 29 0 155 1858 759 43 -1
5 1 1 1 29 1 155 1868 34 33 57 5
5 1 1 1 29 2 886 1858 28 28 20 ya
4 1 1 1 30 0 151 1889 765 59 -1
5 1 1 1 30 1 151 1889 30 59 41 Oo
5 1 1 1 30 2 913 1930 3 5 3 ,
4 1 1 1 31 0 155 1876 1090 106 -1
5 1 1 1 31 1 155 1942 35 29 80 9
5 1 1 1 31 2 873 1876 72 78 35 al
5 1 1 1 31 3 1149 1980 1 2 13 2
4 1 1 1 32 0 155 1983 960 64 -1
5 1 1 1 32 1 155 1987 34 59 66 a
5 1 1 1 32 2 579 2026 62 13 49 ay)
5 1 1 1 32 3 790 1983 325 64 11 «eS
4 1 1 1 33 0 151 2027 1369 59 -1
5 1 1 1 33 1 151 2027 30 59 88 oc
5 1 1 1 33 2 966 2045 34 28 13 \
5 1 1 1 33 3 1513 2068 7 5 0 L
4 1 1 1 34 0 155 2081 34 25 -1
5 1 1 1 34 1 155 2081 34 25 47 uu
4 1 1 1 35 0 155 2112 34 28 -1
5 1 1 1 35 1 155 2112 34 28 71 z
4 1 1 1 36 0 155 2145 34 25 -1
5 1 1 1 36 1 155 2145 34 25 60 uJ
4 1 1 1 37 0 155 2177 35 31 -1
5 1 1 1 37 1 155 2177 35 31 82 O