GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
DA-3100 6 Building Sections prepared by Ellivo 21/01/2021
DA-3101 2 Building Sections prepared by Ellivo 21/01/2021
DA06 (Page - Noosa Youngcare Masterplan prepared 09/03/2021
11) by Form Landscape Architects
DA06 (Page - Tree Works Plan prepared by Form 09/03/2021
12) Landscape Architects as amended in red
by Council
DA06 (Page - Walls and Fences prepared by Form 09/03/2021
13) Landscape Architects as amended in red
by Council
Nature and Extent of Approved Use
3. Deliveries and any service related activities must not occur outside the
hours of:
a. 7am to 6pm Monday to Saturday
b. 9am to 5pm Sunday or any public holiday
4. The total number of residential beds established on the site, including the
approved on site overnight carer accommodation, must not exceed twenty
(20).
5. The total number of support workers residing on the premises at any one
time must not exceed two.
Currency Period
6. This development approval lapses if the use has not happened by the 15
April 2027, unless an application to extend the currency period is approved
by Council.
Performance Bond
7. Security in the form of a cash bond or trading bank guarantee to the sum
of $10,000 must be submitted to Council, to secure performance of all
conditions of this approval, prior to the issue of a Development Permit for
Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Street Identification
8. The street address of the development must be clearly visible and
discernible from the primary frontage of the site by the provision of a street
number and, where appropriate, the building name.
Water & Sewer Connections
9. An underground connection to reticulated water and sewerage must be
provided to the development in accordance with the standards and
requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
Plant and Equipment
10. All air conditioning units, generators or other plant and mechanical
equipment must be located at ground level and fully enclosed or screened
such that,
Page 4 of 16