Original source · versioned page text
DA Form 1, 14 Driftwood Dr Castaways Beach
DA Form 1 — Development application details Approved form (version 1.4 effective 15 December 2023) made under section 282 of the Planning Act 2016. This form must be used to make a development application involving code assessment or impact assessment, except when applying for development involving only building work. For a development application involving building work only, use DA Form .2 — Building work details. For a development application involving building work associated with any other type of assessable development (i.e. material change of use, operational work or reconfiguring a lot), use this form (DA Form 1) and parts 4 to 6 of DA Form 2 - Building work details. Unless stated otherwise, all parts of this form must be completed in full and all required supporting information must accompany the development application. One or more additional pages may be attached as a schedule to this development application if there is insufficient space on the form to include all the necessary information. This form and any other form relevant to the development application must be used to make a development application relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994, and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. For the purpose of assessing a development application relating to strategic port land and Brisbane core port land, any reference to a planning scheme is taken to mean a land use plan for the strategic port land, Brisbane port land use plan for Brisbane core port land, or a land use plan for airport land. Note: All terms used in this form have the meaning given under the Planning Act 2016, the Planning Regulation 2017, or the Development Assessment Rules (DA Rules). PART 1 — APPLICANT DETAILS name) ich | address (P.0. Box of street. 2) Owner's consent 2.1) Is written consent of the owner required for this development application? conse of th Queensland Government
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 11 pages
Page 2
PART 2 — LOCATION DETAILS be listed), OF n for an adjoining or adjacent p e.g. jetty, pontoon. _ | Street pe i : a 14 DBFTLcaaD ~Deaive eeTauns RaacH ‘ -No...|-Plan-Type and Number (e.g. o nt Area(s) uses se <P SS82092 Mersey MacosA SHIRE ROA in | Street No. ; : S : ee je | LotNo. ind N 9. RE Local | Ciepaea | 0 Other: al 5 are ie se premises have -. attached it le to this dey f i : ' ot required . toa r watercourse 0 Name o ‘bo v wate or aquifer: L16n: port land u ot on plan des f Name of loce ment for the tidal area (if applicable): ame of port authority for tidal area (if bios ee Ona 1 under the (R Page 2 DA Form 1 — Development application details Version 1.4— 15 December 2023
Page 3
Listed on the Cc n yun Act 1994 CLR site : M PART 3 — DEVELOPMENT DETAILS Section 1 - Aspects of development 6.1) Provide details about the first development aspect Ba Not required - Page 3 DA Form 1 — Development application details Version 1.4— 15 December 2023
Page 4
Section 2 — Further development details
TL Yes— essable against a |
Yes — divi
‘es — complete divi :
Yes ‘Building work details
Division 1 ~ Material change of use
Note: This di n is only required to be completed if any part of the development application involves a material change of use assessable against a
i change of use
(include.each ina new. its. : area (m2)
: wee . ee (if applicable)
"Divs WAY
8.2) Does the proposed use involve the use of existing buildings
| CL} Yes :
CINo.
Division 2 — Reconfiguring a lot
Note: This division is juired to be if involves
vide additional
ny.stages
ment a|
Page 4
DA Form 1 — Development application details
Version 1.4— 15 December 2023
Page 5
use of parts created. created : Cu : - on plan description oe. | Area (m2) PRM ee RUCK asec UC mic tl RelA CSUR eee RUC e ek UlOom lib proposed easement? (attach schedule if there are more than two easements) 0g or- posed? Division 3 — Operational work Note: This division is only required to be completed if any part of the development application involves operational work. | to re ~ Dy Waterintrastructure Diainage work -L] Earth S ~~ -[] Sewage infrastructure: Landscaping 15) Identify the assessment manager(s) who will be assessing this development application Coeazten) Page 5 DA Form 1 — Development application details Version 1.4— 15 December 2023
Page 6
PART 5 — REFERRAL DETAILS 17) Does this development application include aspects that have any referral requirements? Tao a local government) . oO all inter-urban break (1) SEQ northern inter-urban break [J urban desig oO Water-related (1 Water-related development = feferable dams C1 Water-related. opment “levees (category 3 levees only). Page 6 DA Form 1 — Development application details Version 1.4— 15 December 2023
Page 7
oO Environmentally relevant ac Ol Heritage places = bore penage. places. - “The holder of the licence, if the holder of the licence is an individual infrastructure Glated referrals — Oil and 928 infrastructure oo aa Matters requiring era | ithin Port of to the Gold Coas Waterways Aut ( coastal management as : referral r ‘ eceived and listed ‘Identify and describe any referral re: this development PART 6 — INFORMATION REQUEST SES) Mlaieaaar- lila cada mus ae lad u ci the DA Rules ‘Bil agree t L11do not agree - that this development application Will be assessed ‘and decided bi Sa ‘on the. inion Bien any referral agi rovided. by the sonlicant for the development Page 7 DA Form 1 — Development application details Version 1.4— 15 December 2023
Page 8
PART 7 — FURTHER DETAILS ule to this devel nce number 21) Has the portable long service leave levy been p nly applicable to development applications involving building v re eats O lo—l, Poe assessment manager. decides the deve opment application | acknowledge that the assessment | ve levy h aan it pai 22) Is this development application in response to a show cause notice or required as a result of an enforcement notice? 23.1) Is this development application also taken to be an application for an environmental authority for an Ret Lal Steals pasciliod (ERA) ellis pbokal is of the aU aly Act 1994? Hazardous chemical fac a 2) a this development easel sel) ic douhescdaia aun facility? Page 8 DA Form 1 — Development application details Version 1.4— 15 December 2023
Page 9
Clearing native vegetation 23.3) Does this development application involve clearing native vegetation that requires written confirmation that the chief executive of the Vegetation Management Act 1999 is satisfied the clearing is for a relevant purpose under Ete ifela) 22A of the asl Management Act 1999? TANTO) Od ETL) 23.4) Is this development application taken to be a prescribed activity that may have a significant residual impact on GI pret a ar Likcr male (Um tl ec Offsets Act 2014? Koala habitat in SEQ Region 23.5) Does this development application involve a material change of use, reconfiguring a lot or operational work which is assessable development under Schedule 10, Part 10 of the Planning Regulation 2017? Water resources 23.6) Does this development application involve taking or interfering with underground water through an artesian or subartesian bore, taking or interfering with water in a watercourse, lake or spring, or taking overland flow water under the Water Act 2000? Waterway barrier works re 7) eid ul ads involve babel Srl el rg Marine activities 23.8) Does this development application involve aquaculture, works within a declared fish habitat area or ICC schicck me Coe Rem UC We Cul Note See guidance materials at www dat gid.go\ q yy. au for further information, Page 9 DA Form 1 — Development application details Version 1.4— 15 December 2023
Page 10
Quarry materials from a watercourse or lake 23.9) Does this development application involve the removal of quarry materials from a watercourse or lake under the ed Act 2000? information... eee MECC) from ETaTe| MCR es 23.10) Does this development application involve the removal of quarry materials from land under tidal water ciel the Coastal My re) Management Act ee Referable dams 23.11) Does this development application involve a referable dam required to be failure impact assessed under section 343 of the cia Se (Safety lic Reliability) Act 2008 (the Water ll Nc Tidal work or development within a coastal management district y<ra aE Ble) this seabed aoa involve tidal work or inababa inal in a coastal ibaa hel nt district? ueensland and local heritage places 23.13) Does this development application propose development on or adjoining a place entered in the Queensland blithe i al or on a place entered in a local government's Local Heritage Register? Tee ey cae 14) Does this development ba calcinel involve a material change of use for a brothel? " gatisfied) BANo Page 10 DA Form 1 -- Development application details Version 1.4— 15 December 2023
Page 11
Walkable neighbourhoods assessment benchmarks under Schedule 12A of the Planning Regulation 23.16) Does this development application involve reconfiguring a lot into 2 or more lots in certain residential zones (except rural residential zones), where at least one road is created or extended? PART 8 — CHECKLIST AND APPLICANT DECLARATION | all relevant ret é proposed nt, i 23, a planning plafining- ), See development application be eerie For fu service | mit is issued (see 21) Page 11 DA Form 1 — Development application details Version 1.4— 15 December 2023
Page 12
GARAGE la 6 425 ——_—4 C5 AN.DEN i i SO QO, | : n 49 GYRANE v Red KF : ie a] 2 7\ 2 i | 8 | PURO > y caf 6 Ne PTULE STP —_—— 6 TS iy sZ. KER A (Lema